First Quantum Minerals Ltd.TSX: FM

Q3 2026 Management’s Discussion and Analysis (2026 Q3 FQM Managements Discussion Analysis FINAL)

· Issued by First Quantum Minerals Ltd.

Key figures

  • Copper production and sales of 109 thousand tonnes ("kt") and 110kt, respectively
  • Copper C1 cash cost and copper all-in sustaining costs ("AISC"), excluding Cobre Panamá, were $2.40 per pound ("lb") and $4.20 per lb, respectively
  • Nickel C1 cash cost of $3.22 per lb was $0.95 per lb lower than the same quarter of 2025, reflecting higher grades at Enterprise.

On 6ix: 6ix.com/news/first-quantum-minerals-q3-2026-managements-discussion-and-analysis-2026-q3-fqm-managements-discussion-analysis-final

THIRD QUARTER SEPTEMBER 30, 2026

(in United States dollars, tabular amounts in millions, except where indicated)

INDEX

THIRD QUARTER HIGHLIGHTS 3

COBRE PANAMÁ UPDATE 7

OTHER DEVELOPMENTS 8

SUSTAINABILITY 10

GUIDANCE 10

SUMMARY OPERATIONAL RESULTS 13

OPERATIONS REVIEW 19

DEVELOPMENT PROJECTS 29

EXPLORATION 30

SUMMARY FINANCIAL RESULTS 31

LIQUIDITY AND CAPITAL RESOURCES 40

ZAMBIAN VAT 44

JOINT VENTURE 45

PRECIOUS METAL STREAM AND GOLD STREAM ARRANGEMENT 45

MATERIAL LEGAL PROCEEDINGS 48

REGULATORY DISCLOSURES 49

SUMMARY QUARTERLY INFORMATION 58

APPENDICES 59

CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION 63

First Quantum Minerals Ltd. ("First Quantum" or "the Company") is engaged in the production of copper, nickel, and gold, and related activities including exploration and development. The Company has operating mines located in Zambia and Mauritania. In the quarter ended June 30, 2026, the Company completed the sale of the Çayeli mine and the Cobre Las Cruces project. The Company's Cobre Panamá mine was placed into a phase of Preservation and Safe Management ("P&SM") in November 2023. Following formal approval, the processing of the stockpiled ore at Cobre Panamá commenced in the second quarter of 2026. The Company's Ravensthorpe mine was placed into a care and maintenance ("C&M") process in May 2024. The Company is progressing the Taca Taca copper-gold-molybdenum project in Argentina and is exploring the La Granja and the Haquira copper deposits in Peru.

This Management's Discussion and Analysis ("MD&A") should be read in conjunction with the unaudited consolidated financial statements of First Quantum for the three and nine months ended September 30, 2026. The Company's results have been prepared in accordance with IFRS Accounting Standards as issued by the International Accounting Standards Board ("IFRS") applicable to interim reporting, IAS 34 Interim Financial Reporting, and are presented in United States dollars, tabular amounts in millions, except where noted.

For further information on First Quantum, reference should be made to its public filings (including its most recently filed Annual Information Form) which are available on SEDAR+ at https://www.sedarplus.com. Information is also available on the Company's website at https://www.first-quantum.com. This MD&A contains forward-looking information that is subject to risk factors; see "Cautionary statement on forward-looking information" for further discussion. Information on risks associated with investing in the Company's securities and technical and scientific information under National Instrument 43-101 -Standards for Disclosure for Mineral Projects ("NI 43-101") concerning the Company's material properties, including information about mineral resources and mineral reserves, are contained in its most recently filed Annual Information Form. This MD&A was prepared as of October 28, 2026.

‌THIRD QUARTER HIGHLIGHTS Operational and Financial
  • Copper production and sales of 109 thousand tonnes ("kt") and 110kt, respectively:
    • Copper production for the quarter was a 4kt increase from 105kt produced in the third quarter of 2025.

    • At Kansanshi, production of 46kt was 1kt lower than the same quarter of 2025, as lower grades and recoveries offset higher throughput achieved at the Kansanshi S3 Expansion ("S3").

    • At Sentinel, production of 49kt was a 3kt decrease from the third quarter of 2025 due to lower throughput and grades.

    • At Cobre Panamá, production of 13kt reflected the approval to proceed with the removal and processing of stockpiled ore. The Company continued to execute the P&SM plan in accordance with regulatory requirements.

  • Copper C1 cash cost1 and copper all-in sustaining costs1 ("AISC"), excluding Cobre Panamá, were $2.40 per pound ("lb") and $4.20 per lb, respectively:

    • The copper C1 cash cost1 for the quarter was $0.45 per lb higher than the third quarter of 2025, mainly due to the strengthening of the Zambian kwacha, higher employee and contractor costs, and higher fuel prices. These were partially offset by higher capitalized stripping and higher acid by-product credits.

    • The copper AISC1 for the quarter was $1.20 per lb higher than the same quarter of 2025, reflecting higher C1 cash cost1, deferred stripping2, sustaining capital expenditure2 and royalties.

  • Nickel production of 10kt was a 4kt increase from the 6kt produced in the third quarter of 2025, following strong performance at Enterprise, attributable to higher grades and recoveries.

  • Nickel C1 cash cost1 of $3.22 per lb was $0.95 per lb lower than the same quarter of 2025, reflecting higher grades at Enterprise.

  • Gold production of 47 thousand ounces ("koz") was 11koz higher than the same quarter of 2025, due to higher recoveries and feed grade at Guelb Moghrein coupled with Cobre Panamá production related to the removal and processing of stockpiled ore in accordance with the P&SM plan.

    1 Copper C1 cash cost (copper C1), copper all-in sustaining costs (copper AISC), and Nickel C1 cash cost (nickel C1) are non-GAAP ratios which do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See "Regulatory Disclosures".

    2 Sustaining capital and deferred stripping are non-GAAP financial measures, which do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See "Regulatory Disclosures".

  • Guidance for copper and gold production has narrowed to reflect the performance to date and the outlook for the remainder of the year. Guidance for nickel production has increased. Copper unit cost2 guidance for C1 cash costs2 has been increased to reflect the impact, communicated in previous quarters, of elevated fuel prices and the strong Zambian kwacha to date, which are expected to continue into the fourth quarter. Copper AISC2 guidance increased more than C12, driven primarily by higher royalties due to stronger copper prices and the impact of narrowing production guidance to reflect lower grades at the Zambian operations. Nickel C1 unit cost2 guidance has been reduced to reflect strong year-to-date operational performance. Guidance for total capital expenditure has been narrowed based on spend to date and the latest expected timing of capital expenditures.

  • Cobre Panamá remains in a phase of P&SM. On April 7, 2026, the Government of Panama ("GOP"), through Resolution No. 27 issued by the Ministry of Commerce and Industries ("MICI"), authorized the removal, processing, and export of stockpiled ore (the "Processing Program") currently stored on site at the Cobre Panamá mine as part of the P&SM plan. This processing continued in the third quarter, resulting in copper production of 13kt. See Cobre Panamá Update on page 7 for further details.

    • In July 2026, the GOP established a high-level ministerial commission comprising the Ministers of Commerce and Industries, Economy and Finance, and Environment to evaluate matters relating to the future of the Cobre Panamá mine.

    • In September 2026, the Commission formally delivered its report on Cobre Panamá to the President. The report set out 17 recommendations and six guiding criteria for consideration in determining the future of the project. The President indicated that he will review the report with his Cabinet and legal advisers before reaching a decision. This marks a transition from the Commission's technical assessment to the Government's decision-making phase.

    • The processing of stockpiled ore will mitigate environmental and operational risks associated with prolonged on-site storage. In connection with these activities, direct employment at Cobre Panamá has reached approximately 3,200 employees.

    • On October 9, Panama experienced an earthquake and subsequent aftershocks. All First Quantum personnel in the country are safe and Cobre Panamá's site inspections have identified no material impacts to site infrastructure or environmental protection systems.

  • Fuel: Diesel supply conditions improved during the third quarter, with stronger supply into all major regional ports as traders and oil marketing companies continued to bring diesel cargos into the region, incentivized by higher regional prices and sustained demand. Governments also took measures to moderate delivered prices through reductions in taxes and VAT, although this fiscal support is expected to be withdrawn over the coming months. Diesel prices nevertheless remained elevated at $1.40 per litre during the third quarter as compared to $0.86 per litre during the same period of 2025, impacting operating costs.

  • Sulphuric acid: The Company's Zambian operations are self-sufficient under normal operating conditions due to the Kansanshi smelter producing sulphuric acid. The Company continued to manage feed blends and acid inventories to make surplus volumes available for third-party sales where operational requirements permitted, supported by strong regional demand and favourable sulphuric acid pricing. The operation was able to make surplus acid of 70kt available for third-party sales of $33 million during the third quarter, representing an average price per tonne of $462. This represented a C1 cash cost2 benefit of $0.14 per lb.

  • Net earnings attributable to shareholders of the Company for the quarter was $207 million ($0.25 basic earnings per share) and adjusted earnings1 was $244 million ($0.29 adjusted earnings per share2).

    • Gross profit was $678 million, an increase of $318 million or 88% from the same quarter in 2025. Gross profit excluding Cobre Panamá was $665 million, an increase of $433 million, or 187%. Cobre Panamá gross profit for the third quarter was $13 million.

    • EBITDA1 of $844 million includes an EBITDA1 contribution from Cobre Panamá of $67 million. Excluding Cobre Panamá, EBITDA1 of $777 million was $452 million, or 139% higher than the same period in 2025.

      1 EBITDA and adjusted earnings (loss) are non-GAAP financial measures which do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See "Regulatory Disclosures"

      2 Copper C1 cash cost (copper C1), Nickel C1 cash cost (nickel C1), copper all-in sustaining costs (copper AISC) and adjusted earnings (loss) per share are non-GAAP ratios, which do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See "Regulatory Disclosures".

    • Net earnings attributable to shareholders of $207 million, a $255 million increase compared to loss of $48 million in the same quarter of 2025. This includes an income tax expense of $218 million.

    • Cash flows from operating activities of $600 million ($0.72 per share2) compared to the same quarter of 2025 were $405 million higher, excluding the receipt of $1.0 billion from the Royal Gold gold streaming arrangement in the third quarter of 2025. This was driven by a $409 million increase in EBITDA1 contribution and favourable movements in working capital, partially offset by increased taxes paid, and amortization of deferred revenue.

  • Net debt1 decreased by $98 million during the quarter to $5,309 million at September 30, 2026, primarily attributable to EBITDA1 contributions of $844 million, partially offset by capital expenditures of $332 million, interest paid of $151 million and taxes paid of $99 million.

  • Kusoka Solar Plant: The Company's Trident mining operation is finalizing a power offtake agreement with Solarcentury Africa for the proposed 112 Megawatt-peak ("MWp") Kusoka Solar Plant. The plant will be owned and operated by Solarcentury Africa, with Trident serving as the anchor offtaker. The project will diversify electricity supply to the Company's Sentinel copper and Enterprise nickel mines.

CONSOLIDATED OPERATING HIGHLIGHTS

Three months ended

September 30

Nine months ended September 30

2026

2025

2026

2025

Copper production (tonnes)1,3

108,959

104,626

305,915

295,398

Copper sales (tonnes)2

109,841

118,825

293,190

321,958

Gold production (ounces)

47,095

36,463

113,112

114,136

Gold sales (ounces)

43,016

43,658

110,387

129,251

Nickel production (contained tonnes)

9,831

5,767

33,417

14,434

Nickel sales (contained tonnes)

13,516

2,917

32,280

12,467

1 Production is presented on a contained basis and is presented prior to processing through the Kansanshi smelter.

2 Sales exclude copper anode and cathode produced from third-party concentrate purchased at Kansanshi. Sales attributable to third-party concentrate purchases were 11,207 and 31,359 tonnes for the three and nine months ended September 30, 2026 (1,844 and 10,453 tonnes for the three and nine months ended September 30, 2025), respectively.

3 Kansanshi S3 Expansion project declared commercial production on December 1, 2025.

1 Net debt and EBITDA are supplementary financial measures. These measures do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See "Regulatory Disclosures".

2 Cash flows from operating activities per share is a non-GAAP ratio, which does not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See "Regulatory Disclosures".

CONSOLIDATED FINANCIAL HIGHLIGHTS

Three months ended

September 30

Nine months ended September 30

2026

2025

2026

2025

Sales revenues

2,086

1,346

5,012

3,762

Gross profit

678

360

1,253

1,042

Net earnings (loss) attributable to shareholders of the Company

207

(48)

147

(53)

Basic net earnings (loss) per share

$0.25

($0.06)

$0.18

($0.06)

Diluted net earnings (loss) per share

$0.25

($0.06)

$0.18

($0.06)

Cash flows from operating activities

600

1,195

1,150

2,118

Net debt1

5,309

4,751

5,309

4,751

EBITDA1,2

844

435

1,570

1,212

Adjusted earnings (loss)1

244

(16)

(9)

3

Adjusted earnings (loss) per share3

$0.29

($0.02)

($0.01)

$-

Cash cost of copper production excluding Cobre Panamá (C1) (per lb)3,4

$2.40

$1.95

$2.46

$1.96

Total cost of copper production excluding Cobre Panamá (C3) (per lb)3,4

$3.85

$3.17

$3.95

$3.08

Copper all-in sustaining cost excluding Cobre Panamá (AISC) (per lb)3,4

$4.20

$3.00

$4.10

$2.99

Cash cost of copper production (C1) (per lb)3,4

$2.59

$1.95

$2.55

$1.96

Total cost of copper production (C3) (per lb)3,4

$4.14

$3.22

$4.15

$3.13

Copper all-in sustaining cost (AISC) (per lb)3,4

$4.30

$3.07

$4.21

$3.07

Realized copper price (per lb)3

$6.37

$4.38

$5.67

$4.31

Net earnings (loss) attributable to shareholders of the Company

207

(48)

147

(53)

Adjustments attributable to shareholders of the Company:

Adjustment for expected phasing of Zambian value-added tax ("VAT")

(16)

(8)

(47)

(39)

Loss on redemption of debt

-

25

90

37

Total adjustments to EBITDA1 excluding depreciation2

62

16

(206)

27

Tax adjustments

(5)

-

21

34

Minority interest adjustments

(4)

(1)

(14)

(3)

Adjusted earnings (loss)1

244

(16)

(9)

3

1 EBITDA and adjusted earnings (loss) are non-GAAP financial measures, and net debt is a supplementary financial measure. These measures do not have a standardized meaning under IFRS and might not be comparable to similar financial measures disclosed by other issuers. Adjusted earnings (loss) have been adjusted to exclude items from the corresponding IFRS measure, net earnings (loss) attributable to shareholders of the Company, which are not considered by management to be reflective of underlying performance. The Company has disclosed these measures to assist with the understanding of results and to provide further financial information about the results to investors and may not be comparable to similar financial measures disclosed by other issuers. The use of adjusted earnings (loss) and EBITDA represents the Company's adjusted earnings (loss) metrics. See "Regulatory Disclosures".

2 Adjustments to EBITDA in 2026 relate principally to a $271 million gain on disposal of group companies, a $19 million foreign exchange gain and $66 million of commissioning costs at Cobre Panamá (2025 - the adjustment for expected phasing of Zambian VAT and the tax effect on unrealized movements in the fair value of derivatives designated as hedging instruments).

3 Adjusted earnings (loss) per share, realized metal prices, copper all-in sustaining cost (copper AISC), copper C1 cash cost (copper C1) and total cost of copper (copper C3) are non-GAAP ratios, which do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See "Regulatory Disclosures".

4 Excludes the sale of copper anode and cathode produced from third-party concentrate purchased at Kansanshi. Sales attributable to third-party concentrate purchases were 11,207 tonnes and 31,359 tonnes for the three and nine months ended September 30, 2026 (1,844 tonnes and 10,453 tonnes for the three and nine months ended September 30, 2025).

‌COBRE PANAMÁ UPDATE

On May 30, 2025, the GOP approved and formally instructed the execution of the P&SM plan via MICI Resolution No. 45. The implementation of the P&SM plan is now underway.

In the State of the Nation address on January 2, 2026, President José Raúl Mulino announced that the GOP would authorize the removal, processing and export of stockpiled ore at Cobre Panamá that was previously extracted before operations were suspended. Processing of the stockpiled ore will mitigate environmental and operational risks associated with its prolonged storage, such as acid rock drainage, and provide important feed material to the tailings management facility ("TMF").

Following the President's announcement, the MICI formally requested technical and legal information and documentation from the Company to support its internal review process, which the Company submitted. On April 7, 2026, the GOP, through Resolution No. 27 issued by the MICI, authorized the Processing Program as part of the P&SM plan. Resolution No. 27 further confirms that the stockpiled material was mined during the validity of the concession. As such, the Company is authorized to process and commercialize the resulting copper concentrate, subject to compliance with applicable royalty obligations. The authorized stockpile processing program continued during the quarter, with two copper concentrate shipments from Punta Rincón. MICI was present throughout the concentrate export process, documenting and verifying the activities carried out under the authorized framework. For additional details on the progress of the Processing Program, see the Cobre Panamá section on page 25.

In August 2025, MiAmbiente launched a process to contract an independent expert to conduct an integral audit of the Cobre Panamá mine. Subsequently, on October 10, 2025, MiAmbiente contracted SGS, an internationally recognized testing, inspection and certification company, to proceed with the integral audit. Under the coordination of MiAmbiente and MICI, SGS conducted the audit process, including documentary verification, field visit inspections, and follow-up information and requests. The integral audit was completed in the second quarter and on June 19, 2026, MiAmbiente published SGS' final integral audit report, confirming that 361 of 370 environmental commitments were fulfilled, representing an overall compliance rate of 87.7%. The independent assessment identified seven partial compliances, primarily related to opportunities for further enhancement of biodiversity management and ecological restoration measures. The report also noted three non-compliances associated with reforestation programs that have remained suspended since 2023 following the suspension of operations. The suspension of field activities, including maintenance and monitoring, has affected the survival rates of some planted species and limited the implementation of planned reforestation activities during the period. The non-compliances and partial compliances relate primarily to long-term reforestation, biodiversity, and restoration programs that are correctable and not considered acute environmental incidents. No areas were fundamentally absent or unimplemented.

The GOP established a high-level ministerial commission comprising the Ministers of Commerce and Industries, Economy and Finance, and Environment to evaluate matters relating to the future of the Cobre Panamá mine, including consideration of the integral audit findings and associated economic, environmental, and legal implications. As part of the review, prior to providing the recommendation, two of the ministers visited the mine and met with local communities and suppliers who have been impacted by the closure of the mine.

The Company supported this commission through engagement with national authorities, local governments, business associations and other key stakeholders. This included facilitating engagement between Government representatives and community members at both national and local levels, providing interested parties with direct exposure to the current status of the operation and ensuring that relevant technical, socioeconomic, and territorial perspectives were available as the Government progressed its assessment.

On September 30, 2026, the Interministerial Commission formally delivered its final report on Cobre Panamá to President José Raúl Mulino (the "President"), completing the mandate assigned to it in July 2026. The report sets out 17 recommendations and six guiding criteria for consideration in determining the future of the mine. The Interministerial Commission recommended assessing the feasibility of entering into a new agreement with Cobre Panamá / First Quantum that would provide for the settlement of the outstanding arbitration proceedings and establish conditions for a potential restart designed to achieve an orderly, self-financed closure, while complying with the ruling of the Supreme Court of Justice and prioritizing Panama's environmental, social and economic interests. The report also recognized that the site continues to require active management and monitoring, which is currently being funded by Cobre Panamá / First Quantum at no cost to the Panamanian State, and that maintaining and ultimately closing the site represents significant long-term obligations extending over decades. It recommends that any new framework provide for the site's activities to fund its own closure, with no appropriation from the General State Budget for either the operation or closure of the mine. The report further documents

the economic and social impacts of the shutdown, including effects on employment, Panamanian businesses, exports and government revenues, and cites public-opinion findings indicating support for a resolution under conditions that include environmental and social safeguards, transparency and independent oversight. The President is reviewing the report with the Cabinet and legal advisers and will communicate a decision directly to the country. The Company remains ready to engage constructively with the Government with the objective of achieving a fair and durable resolution for all stakeholders of Cobre Panamá.

Engagement with the municipalities surrounding the project also advanced during the quarter. The Company is supporting the municipal authorities of Donoso, Omar Torrijos Herrera, and La Pintada to identify and structure priority local development initiatives. These include coordination with relevant Government institutions to explore pathways for projects to be incorporated into formal public investment and municipal development mechanisms. This work is intended to create a more sustainable framework for addressing local development priorities.

Progress continues on the "Suma tu Talento" recruitment initiative to support the hiring of staff for preservation activities. Cobre Panamá participated in a major employment fair organized by the Municipality of Panama, receiving 426 in-person candidate profiles, approximately 64% of which were for operational, technical and supervisory trades.

Public outreach efforts also continued in the third quarter through Cobre Conecta and other direct-engagement platforms, generating approximately 447,000 in-person stakeholder engagements across Panama since 2024. Digital engagement also expanded, with the Cobre Panamá Virtual Tour surpassing 405,000 visits.

Community engagement and social investment programs also continued to advance. The "Escuela Feliz" program now benefits more than 4,000 students, while "Cobre Emprende" has graduated over 1,000 entrepreneurs to date. The Company also relaunched its scholarship program, and reactivated its technical training program, reaching 150 participants in surrounding communities. Cobre Emprende completed its latest entrepreneurship cycle with The Pitch, where 40 entrepreneurs received seed capital to support the growth of their ventures. Another key milestone was the launch of the Participatory Environmental Monitoring Program, which directly involves communities surrounding the project in water-quality monitoring, from sample collection through access to laboratory results, strengthening transparency and community participation in environmental oversight. The Company also graduated the first participants from its community technical training program, with more than 125 people, particularly from coastal communities, completing 100 hours of training in trades including plumbing and electrical work.

On October 9, Panama experienced an earthquake and subsequent aftershocks. All First Quantum personnel in the country were reported safe and Cobre Panamá's site inspections have identified no material impacts to site infrastructure or environmental protection systems. Following the earthquake, safety protocols were immediately activated and checks were carried out across the operation. Inspections indicated that facilities and infrastructure at Cobre Panamá remained stable and secure, including the site's tailings management facilities and water management systems. The site's infrastructure incorporates design criteria for high-intensity seismicity and this event remained well below design parameters. The processing of stockpiled ore was temporarily suspended following the event while precautionary checks were completed, and operations were returned to service and re-stabilized on October 10. Power generation systems remained operational throughout the event. The earthquake impacted many communities across Panama, particularly in the Penonomé area, and Cobre Panamá was involved in supporting relief efforts, in coordination with local authorities and emergency services, for the provision of essential supplies.

Arbitration Proceedings

Following engagement with the GOP's legal counsel, First Quantum announced on March 31, 2025, that the Company agreed to discontinue the International Chamber of Commerce ("ICC") arbitration proceedings. The Company also agreed to suspend the Canada-Panama Free Trade Agreement ("FTA") arbitration.

For additional details, see Material Legal Proceedings section on page 48.

‌OTHER DEVELOPMENTS Fuel supply and prices

The Company's Zambian operations consume approximately 320 million litres of diesel annually, which is typically supplied through East African ports from refineries in the Middle East and India. Following earlier uncertainty in fuel supply from the Middle East, the Company secured fuel from alternative locations, including ports and depots in Mozambique and Namibia, and continued to maintain contingency stocks and alternative supply arrangements to support operational continuity.

Diesel supply conditions improved during the third quarter with stronger supply into all major regional ports as traders and oil marketing companies continued to bring diesel cargos into the region, incentivized by higher regional prices and sustained demand. Governments also took measures to moderate delivered prices through reductions in taxes and VAT, although this fiscal support is expected to be withdrawn over the coming months. The Company maintained uninterrupted fuel supply to its Zambian operations through alternative southern African supply routes, contingency inventories, and other supply arrangements. Diesel prices nevertheless remained elevated and impacted operating costs during the third quarter.

The Company continues to assess operational measures to reduce fuel consumption and improve operating efficiency. These include enhanced idle management, reduced non-productive time, improved payload compliance, temporary park-up of non-critical equipment, optimization of haul road conditions, and in-pit refuelling solutions. The Company also advanced electrification and alternative materials-handling initiatives. The rail run conveyor ("RRC") has been fully commissioned and is operating efficiently, and the expansion of the Quantum Electra-Haul™ trolley-assist network continues alongside the established near/in-pit crushing and conveying systems.

Sulphuric Acid

None of the Company's Zambian operations use, or are dependent on, imported elemental sulphur. Approximately 95% of the Company's Zambian copper and nickel production is recovered through flotation, with the remainder recovered through leaching using sulphuric acid. The Kansanshi smelter is the region's largest producer of metallurgical sulphuric acid and generated approximately 1.1 million tonnes in 2025, the majority of which was consumed on-site for cathode production through leaching circuits. Following the smelter expansion, Acid Plant 5 provides additional production capacity and operational flexibility. Any surplus acid production, subject to ore characteristics, internal consumption, and site requirements, may be used to process lower-grade, higher acid-consuming ore, or sold into the regional market.

During the third quarter, the Company continued to manage feed blends and acid inventories to make surplus volumes available for third-party sales where operational requirements permitted, supported by strong regional demand and favourable sulphuric acid pricing. The higher gangue acid consuming oxide ore in the plant feed and acid stocks have been actively managed to enable the sale of acid during the third quarter, providing additional opportunistic profit generation and allowing Kansanshi to realize $33 million from acid sales. The Company will continue to monitor the market and opportunistically sell when profitable.

Zambian Power Supply

During the third quarter of 2026, Zambia's national power supply remained in a materially improved position, although the force majeure declared by ZESCO, the state power utility, in early 2024 remained in effect. Lake Kariba ended the quarter at approximately 39% usable storage, compared with approximately 15% at the same time in 2025, following seasonal drawdown from the levels reached at the end of the wet season. The 2026/2027 rainy season is expected to be influenced by a very strong El Niño, increasing uncertainty around the pace of further hydrological recovery.

The Company experienced no material power-related production impact during the quarter and maintained its diversified power-sourcing strategy. Approximately 80% of the Company's Zambian power requirements was sourced from imports and domestic independent power producers, with the balance supplied by ZESCO. This diversified approach supports operational reliability and limits reliance on Kariba-based generation.

Progress continued on medium- and long-term power sourcing solutions. Development of the previously announced wind and solar power project, from which the Company intends to offtake power, remains on track. Joint grid-stability initiatives with the state power utility also advanced, including the Kansanshi STATCOM project, for which procurement and factory acceptance testing were completed during the quarter. Site installation is scheduled to commence in early 2027.

The Company's Trident mining operation is finalizing a power offtake agreement with Solarcentury Africa for the proposed 112 Megawatt-peak ("MWp") Kusoka Solar Plant. The plant will be owned and operated by Solarcentury Africa, with Trident serving as the anchor offtaker. The project will diversify electricity supply to the Company's Sentinel copper and Enterprise nickel mines.

‌SUSTAINABILITY Health & Safety

The health and safety of the Company's employees and contractors is a top priority, and the Company is focused on the continuous strengthening and improvement of the safety culture at all of its operations.

The Lost Time Injury Frequency Rates ("LTIFR") is an area of continued focus and a key performance metric for the Company. The Company's rolling 12-month LTIFR is 0.06 per 200,000 hours worked as at September 30, 2026 (2025: 0.03).

Responsible Mineral Sourcing at Kansanshi

The Kansanshi Copper Smelter successfully completed its first independent third-party assessment and achieved conformance under the Responsible Minerals Initiative's Responsible Minerals Assurance Process ("RMAP"). The assessment evaluated the Kansanshi smelter's due diligence management system and responsible mineral sourcing practices through documentation review, interviews and site observations. This achievement demonstrates the Company's approach to responsible mining and sourcing.

Quantum Electra-Haul Patent and Trademark

In 2026, the Company secured a patent and trademark from the UK Intellectual Property Office for Quantum Electra-Haul, its proprietary trolley-assist solution. The technology enables equipped haul trucks to use electricity on designated sections of mine haul roads, reducing diesel consumption by up to 90% when fully laden trucks travel on equipped up-ramps, and delivering efficiency benefits. Quantum Electra-Haul is a clear example of the Company's practical approach to improving operational efficiency while delivering reduced greenhouse gas emissions through innovation and tangible implementation of technology in its mining activities.

Alignment with the Global Industry Standard on Tailings Management

In the 2025 ESG Report, the Company announced its commitment to align its tailings storage facilities with the Global Industry Standard on Tailings Management ("GISTM"), a globally recognized framework for responsible tailings management. The Company will adopt a risk-based approach to alignment, prioritizing facilities classified under GISTM as higher risk for potential accelerated alignment. All facilities are expected to align with the GISTM by the end of 2030. This commitment reinforces the Company's approach to governance, independent technical oversight, and lifecycle management across its operations.

Sustainability Reporting

On May 14, 2026, the Company published its primary sustainability report, the 2025 Environment, Social and Governance ("ESG") Report, the 2025 Climate Change Report, the 2025 ESG Data Book and the 2025 Tax Transparency and Economic Contributions Report. These reports, together with the Extractive Sector Transparency Measures Act Report, the Modern Slavery Report, and the Company's sustainability policies, can be found in the ESG Analyst Centre on the Company's website, under Sustainability.

‌GUIDANCE

Guidance provided below is based on a number of assumptions and estimates as of September 30, 2026, including among other things, assumptions about metal prices and anticipated costs and expenditures. Guidance involves estimates of known and unknown risks, uncertainties, and other factors, which may cause the actual results to be materially different.

Guidance has been updated for copper, gold and nickel production to reflect the performance to date and the outlook for the remainder of the year. The outlook section of each operation provides more information.

Copper production guidance has been narrowed from a range of 405 - 475kt to 405 - 435kt to reflect lower grades experienced to date at Sentinel and Kansanshi. Guidance for Cobre Panamá has been maintained at 30 - 40kt.

Gold production guidance has been narrowed from a range of 150 - 175koz to 150 - 170koz. Guidance for Kansanshi has been reduced to 95 - 105koz to reflect lower grades. Guidance for Guelb Moghrein has been increased to 45 - 50koz to reflect the transition to production of a gold-copper concentrate from August 2026. Guidance for Cobre Panamá has been maintained at 10 - 15koz.

Enterprise nickel production has been increased from a range of 30 - 40kt to 40 - 45kt, based on strong year-to-date grades and recoveries.

Copper unit cost guidance has increased for both C11 and AISC1 to reflect persistent elevated market prices, namely fuel, the strengthening of the Zambian kwacha, and royalties based on copper prices. Copper C11 guidance has increased within the previously communicated $0.25 per lb sensitivity for elevated market prices to date, which are expected to continue into the fourth quarter, from $2.15 - $2.40 per lb to $2.50 - $2.65 per lb. AISC1 guidance has increased further from $3.50 - $3.80 per lb to $4.10 - $4.25 per lb. AISC1 guidance increased more than C11, driven primarily by higher royalties due to stronger copper prices and the impact of narrowing production guidance to reflect lower grades at the Zambian operations. The assumptions underlying this guidance include a gold price of $4,000 per ounce, an average Brent crude oil price of $100 per barrel, a Zambian kwacha to US dollar exchange rate of 18, and royalties based on consensus copper prices. Nickel unit cost guidance for Enterprise has been reduced to reflect strong year-to-date operational performance.

Guidance for total capital expenditure has been narrowed from a range of $1,075 - $1,250 million to $1,150 - $1,250 million, based on spend to date and the latest expected timing of capital expenditures. Increased deferred stripping was offset by lower sustaining capital expenditure. The increase in deferred stripping relates to Kansanshi, with approximately half attributable to higher mining unit costs and the remainder attributable to increased capitalized stripping volumes. Capital expenditure for the three and nine months ended September 30, 2026, was $332 million and $920 million, respectively.

PRODUCTION GUIDANCE

000's

2026 Previous

Guidance

2026 Updated Guidance

Copper (tonnes)

405 - 475

405 - 435

Gold (ounces)

150 - 175

150 - 170

Nickel (tonnes)

30 - 40

40 - 45

PRODUCTION GUIDANCE BY OPERATION1

Copper production guidance (000's tonnes)

2026 Previous

Guidance

2026 Updated Guidance

Cobre Panamá

30 - 40

30 - 40

Kansanshi

175 - 205

175 - 185

Trident - Sentinel

190 - 220

190 - 200

Other sites

10

10

Gold production guidance (000's ounces)

Cobre Panamá

10 - 15

10 - 15

Kansanshi

110 - 120

95 - 105

Guelb Moghrein

30 - 40

45 - 50

Nickel production guidance (000's tonnes)

Trident - Enterprise

30 - 40

40 - 45

1 Production is stated on a 100% basis as the Company consolidates all operations.

CASH COST1 AND ALL-IN SUSTAINING COST1

Total Copper

2026 Previous

Guidance

2026 Updated Guidance

C1 (per lb)1

$2.15 - $2.40

$2.50 - $2.65

AISC (per lb)1

$3.50 - $3.80

$4.10 - $4.25

Total Nickel

2026 Previous

Guidance

2026 Updated Guidance

C1 (per lb)1

$3.25 - $4.25

$3.00 - $3.25

AISC (per lb)1

$4.25 - $5.25

$4.00 - $4.25

1 C1 cash cost (C1), and all-in sustaining cost (AISC) are non-GAAP ratios, which do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See "Regulatory Disclosures".

PURCHASE AND DEPOSITS ON PROPERTY, PLANT & EQUIPMENT

2026 Previous

Guidance

2026 Updated Guidance

Project capital1

410 - 460

410 - 450

Sustaining capital1

435 - 510

380 - 410

Deferred stripping1

230 - 280

360 - 390

Total capital expenditure

1,075 - 1,250

1,150 - 1,250

1 Deferred stripping, sustaining capital and project capital are non-GAAP financial measures which do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See "Regulatory Disclosures".

Interest

Interest expense on debt for the three and nine months ended September 30, 2026, was $136 million and $385 million, respectively. Interest expense on debt for the full year 2026 is expected to be approximately $500 million to $525 million. This excludes finance cost accretion on related party loans to Cobre Panamá and Ravensthorpe, finance cost accreted on the precious metal streaming arrangement and on the copper prepayment, capitalized interest expense, and accretion on ARO.

Cash outflow on interest paid for the three and nine months ended September 30, 2026, was $151 million and $404 million, respectively. It is expected to be approximately $500 million to $525 million for the full year 2026.

A significant proportion of the Company's interest expense is incurred in jurisdictions where no tax credit is recognized.

Tax

The adjusted effective tax rate for the three and nine months ended September 30, 2026, was 34% and 35% respectively. This excludes Cobre Panamá and share of joint venture, Ravensthorpe, interest expense, losses realized under the Company's sales hedge program, and one-off adjustments. A significant proportion of the Company's interest expense is incurred in jurisdictions where no tax credit is recognized.

The adjusted effective tax rate for 2026, excluding Cobre Panamá and share of joint venture, Ravensthorpe, interest expense, losses realized under the Company's sales hedge program, and one-off adjustments is expected to be approximately 35%.

Depreciation

Depreciation expense for the three and nine months ended September 30, 2026, was $233 million and $647 million, respectively. The full year 2026 depreciation expense is expected to be between $925 million to $975 million.

‌SUMMARY OPERATIONAL RESULTS Production THIRD QUARTER

QUARTERLY COPPER PRODUCTION BY OPERATION QUARTERLY GOLD PRODUCTION BY OPERATION

105

109

47

6

8

9

16

1

25

6

6

25

28

1

8

28

25

31

37 36 37

34

'000 Tonnes

'000 Ounces

32

91

8

100

4

1

96

6

100

3

49

48

50

44

3

13

40

45

48

47

46

43

45

51

7

Q2 2025 Q3 2025 Q4 2025 Q1 2026 Q2 2026 Q3 2026 Q2 2025 Q3 2025 Q4 2025 Q1 2026 Q2 2026 Q3 2026

Cobre Panamá Kansanshi Sentinel Other Cobre Panamá Kansanshi Guelb Moghrein Other

Copper production of 109kt for the third quarter of 2026 was 4% higher than the same quarter of 2025, mainly due to the commencement of stockpiled ore processing at Cobre Panamá. This was partially offset by lower production at both Zambian operations with lower grades and recoveries at Kansanshi, as well as lower throughput and grades at Sentinel. Contribution from other sites was reduced due to the sale of Çayeli in the second quarter of 2026 as well as lower copper production at Guelb Moghrein. Copper production was 9% higher than the second quarter of 2026, mainly due to the processing of stockpiled ore at Cobre Panamá for the full quarter. Cobre Panamá produced 13kt of copper in the third quarter of 2026, with 6.6 million tonnes ("Mt") of ore processed with an average grade of 0.27%.

Gold production of 47koz for the third quarter of 2026 was 29% higher compared to 36koz in the same quarter of 2025, mainly due to higher recovery and feed grade of oxide ore at Guelb Moghrein coupled with the commencement of stockpiled ore processing at Cobre Panamá. Gold production was 47% higher than the second quarter of 2026, mainly due to increased concentrate production related to processing of oxide material at Guelb Moghrein.

Nickel production at Enterprise of 10kt for the third quarter of 2026 was 4kt higher than the 6kt produced in the same quarter of 2025, attributable to higher grades and recoveries. Nickel production was 1kt lower than the second quarter of 2026, mainly due to lower grades at Trident.

NINE MONTHS

YEAR-TO-DATE COPPER PRODUCTION BY OPERATION YEAR-TO-DATE GOLD PRODUCTION BY OPERATION

11

144

134

16

135

141

20

'000 Tonnes

'000 Ounces

295 306

114 113

2

27

75

7

85

1

30

September 30, 2025 September 30, 2026 September 30, 2025 September 30, 2026

Cobre Panamá Kansanshi Sentinel Other Cobre Panamá Kansanshi Guelb Moghrein Other

Copper production of 306kt for the nine months ended September 30, 2026, was 4% higher than the same period of 2025, mainly due to the commencement of stockpiled ore processing at Cobre Panamá from May 2026. Cobre Panamá produced 16kt of copper in the nine months ended September 30, 2026, with 8.7Mt milled through average grade of 0.26%. Production at Sentinel improved due to higher recoveries and was marginally higher at Kansanshi, where strong performance from the S3 plant offset lower grades. Lower production from other operations reflected completion of the sale of Çayeli in April as well as lower production at Guelb Moghrein.

Gold production of 113koz for the nine months ended September 30, 2026, was 1% lower compared to 114koz in the same period of 2025, mainly due to lower grades at Kansanshi, partially offset by the commencement of stockpiled ore processing at Cobre Panamá.

Nickel production at Enterprise of 33kt for the nine months ended September 30, 2026, was 19kt higher compared to 14kt in the same period of 2025, attributable to higher grades and recoveries.

Sales Volumes THIRD QUARTER

QUARTERLY COPPER SALES BY OPERATION QUARTERLY GOLD SALES BY OPERATION

101

7

119

108

5

90 93

'000 Tonnes

6

110

47

1

7

25

1

6

35

24

1

8

11

32

5

27

27

11

6

4

12

44 42 43

35

'000 Ounces

32

8

2

13

24

39

45

56

44

38

45

51

48

9

43

43

3

45

47

Q2 2025 Q3 2025 Q4 2025 Q1 2026 Q2 2026 Q3 2026 Q2 2025 Q3 2025 Q4 2025 Q1 2026 Q2 2026 Q3 2026

Cobre Panamá Kansanshi 1 Sentinel Other Cobre Panamá Kansanshi Guelb Moghrein Other

1 Sales exclude copper anode and cathode produced from third-party concentrate purchased at Kansanshi. Sales attributable to third-party concentrate purchases were 11,207 tonnes for the three months ended September 30, 2026 (1,844 tonnes for the three months ended September 30, 2025).

Copper sales volumes of 110kt for the third quarter of 2026 were 8% lower than the same quarter of 2025. Sales volumes were marginally higher than production in the quarter. Copper sales volumes were 18% higher than the second quarter of 2026, driven by higher production, including the commencement of sales from Cobre Panamá related to the Processing Program.

Gold sales volumes of 43koz for the third quarter of 2026 were marginally lower than the same quarter of 2025. Gold sales volumes were 34% higher than the second quarter of 2026, reflecting higher production.

Nickel sales volumes were 14kt at Enterprise for the third quarter of 2026, compared to 3kt in the same quarter of 2025, reflecting increased production. Nickel sales volumes were 5kt higher than the second quarter of 2026.

NINE MONTHS

YEAR-TO-DATE COPPER SALES BY OPERATION YEAR-TO-DATE GOLD SALES BY OPERATION

322

'000 Tonnes

'000 Ounces

293

129

11

141

128

33

127

141

21

13

September 30, 2025 September 30, 2026

2

25

110

1

24

79

6

87

15

September 30, 2025 September 30, 2026

Cobre Panamá Kansanshi 1 Sentinel Other Cobre Panamá Kansanshi Guelb Moghrein Other

1 Sales exclude copper anode and cathode produced from third-party concentrate purchased at Kansanshi. Sales attributable to third-party concentrate purchases were 31,359 tonnes for the nine months ended September 30, 2026 (10,453 tonnes for the nine months ended September 30, 2025).

Copper sales volumes of 293kt for the nine months ended September 30, 2026, were 29kt lower than the 322kt sold in the same period of 2025. This reflects lower contributions from Cobre Panamá as the third quarter of 2025 benefitted from concentrate shipments following the approval of the P&SM plan by the GOP in 2025 together with lower production at Guelb Moghrein, which is processing stockpiled material only and reflects the sale of Çayeli in April.

Gold sales volumes of 110koz for the nine months ended September 30, 2026, were 19koz lower than the same period in 2025, due to lower production from Kansanshi and gold concentrate from Cobre Panamá sold in 2025 as compared to the processing of stockpiled ore in 2026.

Nickel sales volumes at Enterprise were 32kt for the nine months ended September 30, 2026, compared to 12kt in the same period in 2025, reflecting improved production.

Cash Costs1 THIRD QUARTER

QUARTERLY COPPER C1 CASH COST1 QUARTERLY COPPER AISC1

3.50

3.00

$ per lb

2.50

2.00

1.50

1.00

2.00

1.95

2.21

2.51

2.48

2.40

4.50

3.96

4.20

4.14

3.37

3.18

3.00

$ per lb

4.00

3.50

3.00

0.50

Q2 2025 Q3 2025 Q4 2025 Q1 2026 Q2 2026 Q3 2026

2.50

Q2 2025 Q3 2025 Q4 2025 Q1 2026 Q2 2026 Q3 2026

Kansanshi Sentinel

Total excluding Cobre Panamá

Kansanshi Sentinel

Total excluding Cobre Panamá

Excluding Cobre Panamá, total copper C1 cash cost1 of $2.40 per lb for the third quarter of 2026 was $0.45 per lb higher than the same quarter of 2025, primarily reflecting the strengthening of the Zambian kwacha, higher employee and contractor costs, and higher fuel prices. These were partially offset by higher capitalized stripping and higher acid by-product credits. The Zambian kwacha has strengthened by approximately 20% compared to the same quarter of 2025. Excluding Cobre Panamá, total copper C1 cash cost1 was $0.08 per lb lower than the second quarter of 2026, primarily due to lower employee and fuel costs, partially offset by lower by-product credits.

Excluding Cobre Panamá, total copper AISC1 of $4.20 per lb was $1.20 per lb higher than the same quarter of 2025, reflecting higher C1 cash cost1, royalties, sustaining capital expenditure2, and deferred stripping2.

1 Copper all-in sustaining costs (copper AISC) and Copper C1 cash cost (copper C1) are non-GAAP ratios, which do not have a standardized meaning under IFRS and might not be comparable to similar financial measures disclosed by other issuers. See "Regulatory Disclosures" for further information.

2 Sustaining capital and deferred stripping are non-GAAP financial measures, which do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See "Regulatory Disclosures" for further information.

NINE MONTHS

YEAR-TO-DATE COPPER C1 CASH COST1 YEAR-TO-DATE COPPER AISC1

3.50

2.46

1.96

3.00

2.50

$ per lb

2.00

1.50

1.00

0.50

0.00

September 30, 2025 September 30, 2026

4.50

4.00

3.50

3.00

$ per lb

2.50

2.00

1.50

1.00

0.50

0.00

4.10

2.99

September 30, 2025 September 30, 2026

Kansanshi Sentinel

Total excluding Cobre Panamá

Kansanshi Sentinel

Total excluding Cobre Panamá

Excluding Cobre Panamá, total copper C1 cash cost1 of $2.46 per lb for the nine months ended September 30, 2026, was 26% higher than the same period in 2025, mainly due to the strengthening of the Zambian kwacha, annual salary increases, higher fuel prices, and planned processing of lower-grade stockpiles through the S3 plant. These increases were partially offset by higher gold realized prices1. The Zambian kwacha strengthened by approximately 27% from the same period of 2025.

Excluding Cobre Panamá, total copper AISC1 of $4.10 per lb was 37% higher than the same period in 2025, reflecting higher copper C1 cash costs1, increased royalties, sustaining expenditure2, and deferred stripping2.

Please see the appendices from page 59 onward for further details on production and sales volumes by operation as well as sales revenues and cash costs1.

1 Copper C1 cash cost (copper C1), realized metal prices and copper all-in sustaining costs (copper AISC) are non-GAAP ratios which do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See "Regulatory Disclosures".

2 Sustaining capital and deferred stripping is a non-GAAP financial measure, which does not have standardized meanings prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See "Regulatory Disclosures" for further information.

‌OPERATIONS REVIEW Kansanshi

Three months ended

September 30

Nine months ended September 30

2026

2025

2026

2025

Waste mined (000's tonnes)

34,008

31,092

94,325

77,603

Ore mined (000's tonnes)

4,240

5,268

14,726

16,399

Sulphide - S3 ore milled (000's tonnes)1,7

6,842

2,127

20,229

2,127

Sulphide - S3 ore grade processed (%)

0.39

0.39

0.38

0.39

Sulphide - S3 copper recovery (%)

80

74

81

74

Sulphide - S3 concentrate grade (%)

20.3

22.7

21.2

22.7

Sulphide - Main ore milled (000's tonnes)1

2,983

3,367

9,286

9,618

Sulphide - Main ore grade processed (%)

0.39

0.61

0.42

0.63

Sulphide - Main copper recovery (%)

81

87

82

88

Sulphide - Main concentrate grade (%)

20.2

22.9

21.2

22.8

Mixed ore milled (000's tonnes)1

1,597

2,116

5,294

5,855

Mixed ore grade processed (%)

0.54

0.89

0.53

0.98

Mixed copper recovery (%)

64

78

61

83

Mixed ore concentrate grade (%)

19.4

23.1

18.6

23.9

Oxide ore milled (000's tonnes)1

1,955

1,785

5,111

5,182

Oxide ore grade processed (%)

0.69

0.63

0.68

0.69

Oxide copper recovery (%)

71

72

70

74

Oxide concentrate grade (%)

15.9

18.1

16.3

19.4

Copper production (tonnes)2

45,843

46,881

135,185

133,528

Copper smelter

Concentrate processed3

383,053

310,787

1,110,406

886,215

Copper anodes produced (tonnes)3

86,164

69,111

252,953

202,897

Smelter copper recovery (%)

97

98

97

98

Acid tonnes produced (000's)

316

274

966

789

Copper sales (tonnes)4

43,985

38,170

128,213

126,780

Copper sold from third-party concentrate purchased (tonnes)

11,207

1,844

31,359

10,453

Gold production (ounces)

24,690

27,854

74,631

85,486

Gold sales (ounces)

25,110

24,313

78,843

86,997

Copper all-in sustaining cost (AISC) (per lb)5,6

$4.46

$2.77

$4.20

$2.70

Copper cash cost (C1) (per lb)5,6

$2.02

$1.34

$1.96

$1.38

Total copper cost (C3) (per lb)5,6

$3.67

$2.85

$3.64

$2.61

Financial results ($ millions)

Copper

773

389

2,131

1,299

Gold

105

87

354

276

Other

33

-

45

1

Total sales revenues

911

476

2,530

1,576

Gross profit

260

117

722

498

EBITDA5

331

177

934

672

1 Measured in dry metric tonnes ("DMT").

2 Production presented on a copper concentrate basis, i.e. mine production only. Production does not include output from the smelter.

3 Concentrate processed in smelter and copper anodes produced are disclosed on a 100% basis, inclusive of Trident and third-party concentrate processed. Concentrate processed is measured in DMT.

4 Sales exclude copper anode and cathode produced from third-party concentrate purchased at Kansanshi. Sales attributable to third-party concentrate purchases were 11,207 and 31,359 tonnes for the three and nine months ended September 30, 2026 (1,844 and 10,453 tonnes for the three and nine months ended September 30, 2025).

5 Copper all-in sustaining costs (copper AISC), copper C1 cash cost (copper C1), and total copper cost (copper C3) are non-GAAP ratios, and EBITDA is a non-GAAP financial measure. These measures do not have a standardized meaning under IFRS and might not be comparable to similar financial measures disclosed by other issuers. See "Regulatory Disclosures" for further information.

6 Excludes copper concentrate from third parties purchased at Kansanshi.

7 Kansanshi S3 Expansion project declared commercial production on December 1, 2025.

Third Quarter

Kansanshi produced 45,843 tonnes of copper during the third quarter of 2026, which was 2% lower than the same quarter of 2025, primarily due to lower feed grades and reduced recoveries impacted by feeding lower grade stockpiled material. This has been mitigated by increased production from the S3 plant.

S3 throughput was sustained above design capacity supported by higher operating time, strong utilization, and improved milling rates. S3 continues to take a high proportion of feed from surface stockpiles which are tarnished and lower in grade than fresh mined ore.

Additionally, the oxide circuit throughput benefitted from increased fines feed resulting from screening, which also improved grade by removing barren, high acid-consuming material. During the quarter, the Kansanshi smelter produced approximately 316,000 tonnes of sulphuric acid, including approximately 70,000 tonnes of surplus acid sold at an average realized price of

$462 per tonne, generating $33 million in revenue.

Gold production of 24,690 ounces for the third quarter of 2026 was 11% lower than the same quarter of 2025, primarily due to lower grades partially mitigated by the benefit of increased volumes processed from the S3 plant.

Copper C1 cash cost1 of $2.02 per lb was $0.68 per lb higher than the same quarter of 2025, driven by higher contractor, employee and fuel costs. This was mitigated by higher acid and gold by-product credits from favourable realized commodity prices. Copper AISC1 of $4.46 per lb was $1.69 per lb higher than the same quarter of 2025 due to higher deferred stripping2.

Sales revenues of $911 million increased by $435 million compared to the same quarter of 2025, primarily driven by higher realized copper and gold prices1. Additionally, $33 million from acid sales was realized in the third quarter of 2026 with no comparable amounts in the same quarter of 2025. The higher gangue acid consuming oxide ore in the plant feed and acid stocks have been actively managed to enable the sale of acid during the third quarter, providing additional opportunistic profit generation.

Gross profit of $260 million was $143 million higher than the same quarter in 2025, reflecting an increase in sales revenues.

Nine Months

Kansanshi produced 135,185 tonnes of copper for the nine months ended September 30, 2026, which was 1% higher than the same period in 2025, driven by an increase in throughput that compensated for lower grades and recovery.

Gold production for the nine months ended September 30, 2026, of 74,631 ounces was 13% lower than the same period in 2025, mainly due to lower grades which have been mitigated by higher throughput from S3.

Copper C1 cash cost1 of $1.96 per lb for the nine months ended September 30, 2026, was $0.58 per lb higher than the same period in 2025, mainly due to higher employee, contractor, and maintenance costs mitigated by an increase in gold and acid by-product credits and higher capitalized costs. Copper AISC1 of $4.20 per lb was $1.50 per lb higher than the same period in 2025, driven by an increase in deferred stripping2.

Sales revenues of $2,530 million for the nine months ended September 30, 2026, were 61% higher than the same period in 2025 due to favourable realized copper and gold prices1 and additional revenue from acid sales.

Gross profit for the nine months ended September 30, 2026, of $722 million was $224 million higher than the same period in 2025, mainly due to higher sales revenues.

1 Copper all-in sustaining costs (copper AISC), Copper C1 cash cost (copper C1), and realized metal prices are non-GAAP ratios, which do not have a standardized meaning under IFRS and might not be comparable to similar financial measures disclosed by other issuers. See "Regulatory Disclosures" for further information.

2 Deferred stripping is a non-GAAP financial measure which does not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See "Regulatory Disclosures".

Kansanshi Copper Smelter Third Quarter

The smelter treated 383,053 DMT of concentrate, which was 23% higher than the same quarter in 2025. It produced 86,164 tonnes of copper anode and approximately 316,000 tonnes of sulphuric acid which were 25% higher and 15% higher, respectively, than the third quarter of 2025. Throughput and production in the prior year were impacted by the planned 40-day shutdown of the smelter, which commenced in June and ended in early July.

Nine Months

The smelter treated 1,110,406 DMT of concentrate, which was 25% higher than the same period in 2025. It produced 252,953 tonnes of copper anode and approximately 966,000 tonnes of sulphuric acid which were 25% and 22% higher than the same period in 2025, respectively. Throughput and production in the prior year were impacted by the planned 40-day shutdown of the smelter, which commenced in June and ended in early July.

Outlook

Production guidance for 2026 has been narrowed to 175,000 - 185,000 tonnes for copper to reflect performance to date. S3 will benefit from higher operating availability, mitigating expectations of lower feed grades, and reduced recoveries mostly due to feed quality changes, and this is expected to continue in 2027. Stripping at South East Dome is taking longer than originally planned which will result in lower grades continuing into next year. Processing of high-grade, high acid-consuming material was reduced to lower acid-consuming material to maximize value from acid sales with prevailing high prices during the third quarter. This acid sales initiative is expected to continue into 2027 which will also impact copper production next year. A sulphide cleaner recovery improvement strategy is in place and is currently being validated with test work, surveys, and plant trials. Additionally, a crusher concave reline has been rescheduled to next year and higher oxide throughput is expected by processing a higher proportion of screened fines.

Production guidance for 2026 has been reduced to 95,000 - 105,000 ounces for gold to reflect performance to date. This is attributed to lower grades. An optimization program is in place to identify and develop gold recovery improvement opportunities.

Acid management initiatives will continue to be implemented to maximize acid sales and capitalize on favourable market prices.

During the third quarter, the Company continued the program to evaluate the new near-surface gold zone occurrences in the South East Dome area at Kansanshi. Test work continues with the pilot plant facility.

Trident - Sentinel copper mine and Enterprise nickel mine

Three months ended

September 30

Nine months ended September 30

2026

2025

2026

2025

Sentinel

Waste mined (000's tonnes)

25,255

30,432

77,707

89,522

Ore mined (000's tonnes)

13,011

12,937

39,498

37,595

Copper ore milled (000's tonnes)1

13,732

15,113

40,914

41,483

Copper ore grade processed (%)

0.39

0.40

0.39

0.39

Copper recovery (%)

91

85

91

86

Concentrate grade (%)

24.3

23.8

24.7

23.1

Copper production (tonnes)

48,816

51,336

144,403

140,805

Copper sales (tonnes)

50,772

48,410

140,746

140,542

Copper all-in sustaining cost (AISC) (per lb)2

$3.95

$3.33

$4.09

$3.43

Copper cash cost (C1) (per lb)2

$2.71

$2.53

$2.98

$2.61

Total copper cost (C3) (per lb)2

$4.00

$3.58

$4.31

$3.65

Enterprise

Waste mined (000's tonnes)

5,826

8,019

16,106

25,687

Nickel ore mined (000's tonnes)

1,198

1,049

2,644

2,863

Nickel ore milled (000's tonnes)1

858

1,059

2,399

2,781

Nickel ore grade processed (%)

1.29

0.72

1.60

0.78

Nickel recovery (%)

89

76

87

66

Nickel production (tonnes)

9,831

5,767

33,417

14,434

Nickel sales (tonnes)

13,516

2,917

32,280

12,467

Nickel all-in sustaining cost (AISC) (per lb)2

$4.19

$5.80

$3.80

$7.00

Nickel cash cost (C1) (per lb)2

$3.22

$4.17

$2.84

$4.95

Total nickel cost (C3) (per lb)2

$4.39

$6.15

$4.08

$6.71

Financial results ($ millions)

Sales revenues - Copper

711

458

1,865

1,320

Sales revenues - Nickel

177

34

446

145

Total sales revenues

888

492

2,311

1,465

Gross profit

377

79

806

280

EBITDA2

470

162

1,087

513

1 Measured in dry metric tonnes ("DMT").

2 All-in sustaining costs (AISC), C1 cash cost (C1), and total cost (C3) are non-GAAP ratios, and EBITDA is a non-GAAP financial measure. These measures do not have a standardized meaning under IFRS and might not be comparable to similar measures disclosed by other issuers. See "Regulatory Disclosures" for further information.

Third Quarter

At the Sentinel mine, copper production of 48,816 tonnes for the third quarter of 2026 was 5% lower than the same quarter of 2025 due to lower throughput and grades, partially offset by higher recoveries. Throughput was 9% lower than the third quarter of 2025, impacted by lower crusher availability and reduced milling rates, driven by load limitations when processing competent ore and closed-circuit operation during ball mill bolt re-torquing.

Mining volumes were lower than the comparable quarter of 2025 due to haul profiles, lower fleet availability, and contractor capacity. Mining activities during the quarter continue to focus on opening additional areas in Stage 3 to support improved productivity and progressing Stage 4 waste stripping, with Stage 2 remaining as the primary source of ore.

Grades were 3% lower than the same quarter of 2025, reflecting the areas mined during the quarter, with delayed access to higher-grade mining areas due to the lower mining volumes as a result of the mid-life overhaul of Rope Shovel 1. The mine plan continues to prioritize blending across multiple sources to manage grade variability. Recoveries were 7% higher than the same quarter of 2025, driven by fresher ore from Stage 2 and continued optimization of the flotation circuit, including enhanced process control systems.

Copper C1 cash cost1 of $2.71 per lb for the third quarter of 2026 was $0.18 per lb higher than the same quarter of 2025 due to higher fuel, employee, consumables and reagent costs. This was partially offset by increased capitalized costs and lower TCRCs. Copper AISC1 for the third quarter of 2026 of $3.95 per lb was $0.62 per lb higher than the same quarter of 2025, reflecting higher C1 cash cost1, sustaining capital expenditure2, royalties and deferred stripping2.

Copper sales revenues of $711 million were $253 million higher than the same quarter of 2025, reflecting higher realized copper prices1 and sales volumes. Sales revenues for the third quarter of 2026 consisted of anode and concentrate sales.

Trident gross profit of $377 million was $298 million higher than the same quarter of 2025, reflecting higher sales revenues partially offset by higher costs.

Nine Months

At the Sentinel mine, copper production of 144,403 tonnes for the nine months ended September 30, 2026, was 3% higher than the same period in 2025 due to higher recoveries, partially offset by lower throughput. Mining volumes were lower than the comparable period of 2025 due to higher first quarter rainfalls, haul profiles, lower fleet availability, and contractor capacity.

Recoveries were 6% higher than the same period in 2025, supported by continued optimization of the flotation circuit, including enhanced process control systems. Throughput was 1% lower than the comparable period of 2025, impacted by lower third quarter crusher availability.

Copper C1 cash cost1 of $2.98 per lb for the nine months ended September 30, 2026, was $0.37 per lb higher than the same period in 2025, due to higher employee, fuel, consumables and reagent costs. This was partially offset by higher copper production. Copper AISC1 for the nine months ended September 30, 2026, of $4.09 per lb was $0.66 per lb higher than the same period in 2025, reflecting higher C1 cash cost1, royalties, and sustaining capital expenditure2.

Copper sales revenues of $1,865 million were $545 million higher than the same period in 2025, reflecting higher realized copper prices1. Sales for the current year consisted of anode, concentrate, and cathode, whereas sales in 2025 comprised primarily of anode with concentrate and cathode sales beginning in the third quarter.

Trident gross profit of $806 million was $526 million higher than the same period in 2025, reflecting higher sales revenues partially offset by higher costs.

Outlook

Production guidance for 2026 has been updated to 190,000 - 200,000 tonnes of copper to reflect performance to date.

The focus at Sentinel remains on increasing mill throughput and improving recoveries through initiatives to optimize feed grade, blast fragmentation, stockpile management, milling performance, and flotation efficiency. Grades and throughput are expected to improve in the fourth quarter of 2026 as mining progresses within Stage 2. Stage 3 ore will increasingly supplement feed from Stage 1 and Stage 2.

Mitigation strategies for flange bolt fatigue at Ball Mill 2 are ongoing in collaboration with the original equipment manufacturer ("OEM") and engineering consultants. Planning continues for a major upgrade in 2027, which will involve replacing a section of the discharge end with a new OEM design, providing a permanent engineered solution. Following the completion of tailing thickener feed well upgrades in April 2026, flotation feed capacity increased from 8,000 to 8,400 tonnes per hour, with ongoing automation and control system enhancements focused on improving flotation stability, supported by targeted capital projects aimed at increasing recovery. These include the cleaner circuit by-pass system, cleaner scavenger tails discharge line rerouting, and concentrate thickener overflow rerouting, with a lime circuit upgrade targeted for completion early 2027. The tailings line upgrade is advancing and is now expected to be completed in early 2027.

The In-Pit Crusher 4 project was completed in October 2026. Expansion of the Quantum Electra-Haul™ trolley-assist network continues across Stage 2 and Stage 3. Waste stripping at Stage 4 is progressing to support future ore supply from 2027.

1 Copper all-in sustaining costs (copper AISC), Copper C1 cash cost (copper C1), and realized metal prices are non-GAAP ratios, which do not have a standardized meaning under IFRS and might not be comparable to similar financial measures disclosed by other issuers. See "Regulatory Disclosures" for further information.

2 Sustaining capital and deferred stripping are non-GAAP financial measures which do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See "Regulatory Disclosures".

Enterprise Third Quarter

At the Enterprise mine, nickel production of 9,831 tonnes for the third quarter of 2026 was 70% higher than the same quarter in 2025 due to higher grades and recoveries, partially offset by lower throughput. Grades were significantly higher than the third quarter of 2025, reflecting a higher proportion of ore mined from high-grade areas in Stage 3. Throughput was 19% lower than the third quarter of 2025 as milling rates were moderated to manage elevated feed grades and sustain recoveries. Recovery was 17% higher than the same quarter in 2025, supported by the processing of high-grade fresher ore, improvements in control systems, and the bypassing of the pre-float circuit.

Nickel C1 cash cost1 of $3.22 per lb for the third quarter of 2026 was $0.95 per lb lower than the same quarter of 2025, driven by higher production and capitalized costs2 combined with lower explosive and reagent costs. Nickel AISC1 of $4.19 per lb for the third quarter of 2026 was $1.61 per lb lower than the same quarter of 2025, reflecting lower C1 cash costs1, royalties and deferred stripping2.

Nickel sales revenues of $177 million were $143 million higher than the same quarter of 2025, reflecting higher sales volumes and realized nickel prices1.

Nine Months

At the Enterprise mine, nickel production of 33,417 tonnes for the nine months ended September 30, 2026, was 132% higher than the same period of 2025 due to higher grades and recoveries, partially offset by lower throughput. Grades were more than double the same period of 2025, reflecting a higher proportion of ore mined from high-grade areas in Stage 3. Recovery was 32% higher than the same period in 2025, supported by the processing of high-grade fresher ore, improvements in control systems, and metallurgical performance. Throughput decreased by 14% as milling rates were moderated to manage elevated feed grades and sustain recoveries.

Nickel C1 cash cost1 of $2.84 per lb for the nine months ended September 30, 2026, was $2.11 per lb lower than the same period in 2025, driven by higher production combined with lower contractor and explosive costs, but partially offset by lower capitalized costs. Nickel AISC1 of $3.80 per lb for the nine months ended September 30, 2026, was $3.20 per lb lower than the same period in 2025, reflecting lower C1 cash costs1 as well as lower deferred stripping2.

Nickel sales revenues were $446 million for the nine months ended September 30, 2026, $301 million higher than the same period in 2025, due to higher sales volume and realized nickel prices1.

Outlook

Production guidance for 2026 has been increased to 40,000 - 45,000 contained tonnes of nickel based on performance to date.

Operational priorities remain focused on improving ore quality and grade control through ongoing RC drilling. Mining practices are being refined, including reduced ore bench heights, to minimize dilution and enhance recovery. Mining volumes are expected to continue to increase in the fourth quarter with the arrival of additional contractor equipment. Ore grades are expected to be lower in the fourth quarter, in-line with the mine plan. Following expansion of the ore footprint, the operational priority will now focus on rainy season preparation, with the dewatering stage tank and main pit sump due for completion in October. With the ROM pad nearing capacity, Enterprise is well set up with ore feed for the rainy season.

Improved geological understanding of the orebody continues to enhance predictability of lower-recovery zones. This has been incorporated into planning and forecasting, supporting greater accuracy in production outlook and reducing variability in expected performance.

1 Nickel all-in sustaining cost (nickel AISC), nickel C1 cash cost (nickel C1), and realized metal prices are non-GAAP ratios, and do not have standardized meanings under IFRS and might not be comparable to similar financial measures disclosed by other issuers See "Regulatory Disclosures" for further information.

2 Deferred stripping is a non-GAAP financial measure which does not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See "Regulatory Disclosures".

Cobre Panamá

Three months ended

September 30

Nine months ended September 30

2026

2025

2026

2025

Copper ore milled (000's tonnes)1

6,615

-

8,708

-

Copper ore grade processed (%)

0.27

-

0.26

-

Copper recovery (%)

74

-

73

-

Concentrate grade (%)

20.3

-

20.3

-

Copper production (tonnes)

13,229

-

16,445

-

Copper sales (tonnes)

13,463

24,306

13,477

32,554

Gold production (ounces)

6,355

-

7,160

-

Gold sales (ounces)2

5,818

11,071

5,986

14,830

Silver production (ounces)

143,204

-

160,974

-

Silver sales (ounces)2

121,712

216,574

121,712

290,868

Copper all-in sustaining cost (AISC) (per lb)3

$5.10

$-

$5.26

$-

Copper cash cost (C1) (per lb)3

$4.08

$-

$4.21

$-

Total copper cost (C3) (per lb)3

$6.40

$-

$6.62

$-

Financial results ($ millions)

Copper in concentrates

191

226

191

303

Gold - precious metal stream ongoing cash payments

3

5

3

5

Gold - other cash

3

2

3

12

Silver - precious metal stream ongoing cash payments

-

1

-

1

Silver - other cash

3

3

3

5

Gold and silver - non cash amortization

3

8

3

8

Total sales revenues

203

245

203

334

Gross profit (loss)

13

128

(58)

163

EBITDA4

67

110

(52)

89

1 Measured in dry metric tonnes ("DMT").

2 Excludes refinery-backed gold and silver credits purchased and delivered under the precious metal streaming arrangement (see "Precious Metal Stream Arrangement").

3 Copper all-in sustaining costs (copper AISC), copper C1 cash cost (copper C1), and total copper cost (copper C3) are non-GAAP ratios, and do not have a standardized meaning under IFRS and might not be comparable to similar financial measures disclosed by other issuers. See "Regulatory Disclosures" for further information.

4 EBITDA is a non-GAAP financial measure, which does not have a standardized meaning under IFRS and might not be comparable to similar financial measures disclosed by other issuers. See "Regulatory Disclosures" for further information.

Third Quarter

Following approval of the Processing Program in April 2026, Cobre Panamá commenced processing of stockpiled ore. During the third quarter of 2026, 6.6 million tonnes of ore, with an average head grade of 0.27%, were processed at an average recovery rate of 74%, resulting in the production of 13,229 tonnes of copper and 6,355 ounces of gold.

Cobre Panamá reported a gross profit of $13 million in the third quarter of 2026 which was $115 million lower than the same period in 2025. The third quarter of 2025 recorded revenue of $245 million for the approved export of copper concentrate stored on-site. During the third quarter of 2025, operations remained under preservation and maintenance, resulting in a lower cost base and consequently higher gross profit. In the third quarter of 2026, the commencement of processing of stockpiled ore resulted in higher operating and processing costs, which reduced gross profit and the EBITDA1 contribution for the quarter.

Cobre Panamá continued executing the approved Processing Program in coordination with the GOP and in strict compliance with the P&SM plan. Operational Readiness has progressed from the initial one-train restart into the integrated recovery program required to support sustainable two-train operation. The Company maintained environmental management

1 EBITDA is a non-GAAP financial measure, which does not have a standardized meaning under IFRS and might not be comparable to similar financial measures disclosed by other issuers. See "Regulatory Disclosures" for further information.

activities, continued its asset integrity program, and expanded stockpile processing readiness and execution activities across the site.

The Processing Program advanced materially during the quarter, with the progressive start-up and commissioning of the processing trains. Following the initial start-up of Train 3, Train 2 commenced operations in July and operated without major issues through August. Train 1 progressed through refurbishment, testing, and commissioning, including an operational run test in August of SAG Mill 1, Ball Mill 2, and the associated cyclone feed pumps, which was completed without major issues.

The first copper concentrate shipment represented another important milestone in the Processing Program. In August, 33,000 wmt of copper concentrate was loaded and shipped, demonstrating the restoration of the integrated processing, filtration, storage, and export chain. A second vessel was subsequently loaded and shipped in September with a total of 38,611 wmt of copper concentrate.

Maintenance and refurbishment activities to support the stockpile processing activities continue advancing across the process plant, mine fleet, and supporting infrastructure. Engineering, maintenance and commissioning teams remain focused on safely restoring equipment operability, completing rehabilitation works and progressively increasing capability while maintaining safe operating practices.

The Company is focused on the safe and responsible execution of the Processing Program:

  • Community engagement and local employment initiatives remained active throughout the quarter as workforce recruitment accelerated. Recruitment campaigns, technical training programs, and supplier engagement remained focused on maximizing participation from neighbouring communities and Panamanian businesses in support of the Processing Program. Workforce priorities remain focused on expanding and maintaining the Train 2 recruitment pipeline, with candidate sourcing, assessment, and pre-employment preparation aligned with anticipated operational requirements. Total site employment increased from approximately 3,000 employees at the end of June to 3,200 employees by the end of September, supporting commissioning, maintenance, and operational activities. Recruitment remained focused on technical and operational positions, with continued emphasis on local employment, regional recruitment initiatives, and structured onboarding and training programs to ensure workforce readiness and comprehensive safety training. Employment and onboarding during the quarter included a range of operations, maintenance, processing, environmental management, logistics, and support services personnel, including prioritizing the employment of local community members and former Cobre Panamá workers. In addition, the Processing Program is expected to support further employment through contractors and indirect jobs across equipment supply, transportation, logistics, food services, and other local industries.

  • Cobre Panamá has begun re-establishing critical supply chains, with a focus on local Panamanian supplier development, for the replenishment of consumables, spare parts, reagents, fuel, and other essential materials required for safe and efficient processing activities.

  • The Processing Program utilizes the existing in-pit crushers, conveyors, process plant, and flotation circuit. In parallel with the commissioning, maintenance backlogs and refurbishment works progressed on other areas of the facilities, with a focus on the flotation and concentrate handling circuits.

Engineering activities progressed from initial recovery toward reliability and asset-integrity management during the quarter. The principal technical focus remained on medium-voltage drive and power-cell reliability, with repairs, operational risk management ("ORM") support, and an independent root-cause investigation progressing during the period. The integrated Q3-Q4 recovery program also included SAG 3 gearless mill drive segment replacement, mill relines, Ball Mill 6 electrical works, crusher rehabilitation, and the completion of remaining water and flotation scopes.

Mobile fleet preservation and maintenance continued in line with OEM recommendations and established maintenance strategies, including the reactivation of certain equipment required to support the reclamation of the stockpiles. As of the third quarter of 2026, 18 of 36 ultra class trucks have been re-commissioned for operations. The ancillary fleet required for a one-train operation was also fully recommissioned.

Under the P&SM plan, the Company continues to maintain environmental stability and ensure compliance with commitments outlined in the Environmental and Social Impact Assessments ("ESIA"). Key ongoing activities include cleaning and maintenance of sediment ponds, surface water management, and erosion control. Environmental systems have remained stable while field activity increased with processing. Compliance with environmental permits and commitments under the P&SM plan was maintained through routine monitoring, water management, sediment control, tailings management, and

ongoing regulatory engagement. Follow-up to the Government's SGS Comprehensive Audit progressed from assessment into corrective-action implementation. Environmental actions were incorporated into the compliance tracking process, with field work focused on reforestation maintenance, compensatory reforestation verification and protected-flora translocation, supported by improved evidence management, traceability, and georeferencing.

Tailings Management Facility activities progressed in parallel with the plant commissioning.

Cobre Panamá's power plant has demonstrated continuous and reliable operation. At the end of the third quarter, both generating units have demonstrated reliable operation, meeting the power demands of the site with excess energy sold to the national grid.

Outlook

Following the successful commencement of stockpiled ore processing during the second quarter, the Company's focus has shifted towards stabilizing the additional processing configuration and executing the remaining refurbishment and maintenance program required for sustainable two-train operation. With the power station fully recommissioned, incremental power plant costs are now being partially offset by the sale of excess power to support the national grid.

Environmental stewardship remains a core priority. All processing activities will continue to be conducted in accordance with the approved P&SM plan, applicable permits, and environmental commitments, while maintaining close coordination with the GOP. The Company remains ready to engage constructively with the GOP with the objective of achieving a fair and durable resolution for all stakeholders of Cobre Panamá.

The total stockpile was estimated at approximately 38 million tonnes of mineralized ore at varying grades, containing approximately 70,000 tonnes of recoverable copper, sufficient to support the Processing Program until mid-2027. Copper and gold production from the processing of stockpiled ore at Cobre Panamá is expected to be 30,000 - 40,000 tonnes and 10,000 - 15,000 ounces, respectively, in 2026.

The processing of stockpiled ore will be carried out in close coordination with the GOP and in strict compliance with the approved P&SM plan. The required spend is estimated at approximately $200 million, including plant and equipment recommissioning, warehouse inventory replenishment, and sustaining capital1. Costs are currently estimated at approximately $90 - $100 million for commissioning, $10 - $20 million for inventory, and $70 - $80 million in sustaining capital1. As of the third quarter of 2026, cash outflows in relation to these costs is approximately $80 million.

Guelb Moghrein

Three months ended

September 30

Nine months ended September 30

2026

2025

2026

2025

Copper production (tonnes)

1,071

3,508

6,012

12,547

Copper sales (tonnes)

1,621

4,085

6,665

13,084

Gold production (ounces)

16,050

7,832

30,082

26,522

Gold sales (ounces)

12,088

7,575

23,844

25,287

Magnetite concentrate production (WMT)1

85,799

124,131

402,711

464,318

Magnetite concentrate sales (WMT)1

128,676

136,475

398,787

503,663

Gold all-in sustaining cost (AISC) (per oz)2

$1,504

$-

$1,504

$-

Financial results ($ millions)

Sales revenues

86

75

233

243

Gross profit

35

25

90

72

EBITDA2

36

29

93

88

1 Magnetite concentrate production and sales volumes are measured in wet metric tonnes ("WMT").

2 All-in sustaining costs (AISC) is a non-GAAP ratio, and EBITDA is a non-GAAP financial measure. These measures do not have a standardized meaning under IFRS and might not be comparable to similar measures disclosed by other issuers. See "Regulatory Disclosures" for further information.

Three and Nine Months

1Sustaining capital is a non-GAAP financial measure, which does not have standardized meanings prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See "Regulatory Disclosures".

Copper production for the three and nine months ended September 30, 2026, was 69% and 52% lower, respectively, compared to the same periods of 2025, primarily due to lower grade, throughput and recovery as the mine began processing stockpiled ore. Throughput was negatively impacted by a higher proportion of competent ore from subgrade stockpiles during the processing of sulphide ore and unplanned plant downtime following the transition to processing oxide material. Copper recovery was lower due to the processing of oxide ore.

Gold production for the three and nine months ended September 30, 2026, was 105% and 13% higher, respectively, compared to the same periods of 2025, due to higher recovery and feed grade from oxide ore.

Magnetite production for the three and nine months ended September 30, 2026, was 31% and 13% lower, respectively, compared to the same periods of 2025, primarily due to reduced magnetite grade in oxide ore.

Sales revenues for the three months ended September 30, 2026, were 15% higher compared to the same period of 2025 due to higher gold sales volumes and higher realized metal prices1.

Sales revenues for the nine months ended September 30, 2026, were 4% lower compared to the same period of 2025 due to lower copper and magnetite sales volumes despite higher realized metal prices1.

Gross profit for the three and nine months ended September 30, 2026, was $10 million and $18 million higher, respectively, than the same periods of 2025, attributable to higher sales revenues and lower costs of sales.

Outlook

Production guidance for 2026 is approximately 7,000 tonnes of copper. Production guidance has increased to 45,000 -50,000 ounces of gold to reflect performance-to-date. Magnetite concentrate production is expected to reach 450,000 WMT.

Gold production includes output from reprocessed tailings through the CIL plant and ore stockpiles treated via the flotation circuit. The operation has transitioned to processing oxide material blend with some sulphide ore to produce a copper-gold concentrate.

Water supply remains stable. Sections of the freshwater pipeline are being replaced or redeployed with improved sealing to reduce leakage and enhance delivery efficiency. Project completion is targeted for early 2027. The freshwater column seal enhancement project will resume in November after a major shutdown in October.

Ravensthorpe

Ravensthorpe was placed into C&M in May 2024, with production halted and operating guidance suspended. During the quarter, C&M activities remained focused on preserving asset integrity and maintaining restart readiness through the execution of preventative maintenance programs. Major equipment continued to be operated and monitored in accordance with preservation plans to support long-term reliability and asset value.

Environmental approvals associated with Shoemaker Levy Stage 2 continued to progress during the quarter. Ecological surveys and dieback assessments supporting the revised offset strategy were completed and submitted to relevant regulatory authorities. Progress on the Shoemaker Levy Stage 2 approval remains linked to the Tailings Storage Facility 3 approval process, which continues to advance through regulatory assessment.

C&M costs averaged $2 million per month during the quarter and are expected to remain broadly consistent. The Company also continued to support its workforce and regional communities while preserving the asset for future optionality.

1 Realized metal prices is a non-GAAP ratio, which does not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See "Regulatory Disclosures".

‌DEVELOPMENT PROJECTS Greenfield Projects Taca Taca

Taca Taca, located in the Salta province of Argentina, is the most advanced of the Company's greenfield projects and is one of the largest, highest-quality copper projects globally. It will consist of an open-pit copper mine with an initial processing capacity of 40 million tonnes per annum ("Mtpa") with an optional expansion to 60 Mtpa commencing in the fifth year of operation.

An updated Technical Report NI 43-101 was filed on February 19, 2026, indicating average annual copper production is expected to be 291kt in the first ten years of operation (with peak annual production of 323kt) and life-of-mine ("LOM") annual copper production of approximately 209kt. Average annual gold production is expected to be 133koz in the first ten years of operation (with peak annual production of 171koz) and LOM annual gold production of approximately 96koz. With an initial mine life of 35 years and a large resource base, Taca Taca has the potential to be a long-life asset.

The Company continues to work constructively with the provincial authorities, and approval of the Mine ESIA is expected in 2026, following completion of the public consultation process scheduled for November. Regarding the 40 kilometre access road to site, the Company is preparing the feasibility package for submission to the authorities for assessment including field and technical studies.

During the second quarter of 2026, additional technical studies and a trace review were commissioned for the 345kV powerline ESIA.

Community engagement and informative meetings continued throughout the third quarter of 2026 in Tolar Grande alongside support for community programs and initiatives in the areas of health, education and culture with this and other communities in La Puna. The Company continues to advance the co-design and implementation of community development programs focusing on local suppliers' development and employment opportunities.

The Company has established a Community Embassy in Tolar Grande to further strengthen engagement with local communities. The office was officially inaugurated in May 2026 with the participation of the Provincial Mining Secretariat, Tolar Grande's Mayor, community leaders and members, and local suppliers.

In April, the Water Resources Secretariat issued the hydrological feasibility certificate, permitting sufficient water to support the first stage of the project. The certificate will be converted into a water concession post ESIA approval.

On July 8, 2024, the Government of Argentina's President Javier Milei enacted the "Law of Grounds and Starting Points for the Freedom of Argentines", which includes a new incentive regime for large investments ("RIGI") with a two-year window to apply starting on the same date. The deadline for RIGI applications was extended by 12 months to July 8, 2027. The legislation provides unrestricted foreign exchange access and a specific tax and customs regime, focusing on predictability, stability, and legal certainty across various sectors, including mining. On September 19, 2024, Salta province formally adhered to the regime, extending its benefits to include local tax stability. The Company is finalizing its Argentina Incentive Regime for Large Investments ("RIGI") application with an intention to submit it after receiving ESIA approval and water use concessions.

Pursuant to the collaboration agreement with the International Finance Corporation ("IFC"), environmental and social studies are being undertaken by international and local consultants to align the Taca Taca project with IFC Performance Standards and international best practices.

La Granja

In 2023, the Company finalized an agreement with Rio Tinto to progress the La Granja copper project in northern Peru. La Granja is one of the largest undeveloped copper resources in the world. La Granja is located in the district of Querocoto in the northern region of Cajamarca, Peru, approximately 90 kilometres north-east of Chiclayo, at an altitude of between 2,000 and 2,800 metres.

An updated NI 43-101 Technical Report on Resources was filed in May 2026 with a Mineral Resource of approximately 4.8 billion tonnes of Measured and Indicated Resources at 0.48% copper, comprising 23.0 million tonnes of contained copper, 600 million ounces of silver and 6.7 million ounces of gold. La Granja comprises a large-scale copper porphyry-skarn-epithermal system that is amenable to conventional large-scale open pit mining using drill and blast and load and haul

operations. The Company's geological work to date demonstrates that a significant portion of the arsenic is structurally controlled and associated with high copper grades, lending itself to a conventional flotation flow sheet in the process plant. It is expected that arsenic can be managed by segregation, blending and through commercial offtake arrangements.

The project continues to progress as planned. The engineering study is well advanced, and community engagement, baseline environmental program, and resettlement planning activities have commenced in support of permitting activities. The Terms of Reference for the ESIA were filed with the relevant authorities in June 2026. During the quarter, the Company responded to observations received as part of the regulatory approval process. Approval of the Terms of Reference remains pending. Positive and mutually beneficial community relations and local community participation in project-support activities have been established, with a focus on capacity building and awareness raising, and continue to be strengthened. The Company established a community information office in the regional centre of Querocoto in mid-2025 and established a Minera La Granja office in Chiclayo in the first quarter of 2026, with relocation of personnel from the Company's Peru office, in Lima, substantially completed. Ongoing engagement with local, regional, and national authorities has indicated strong support for the project at all levels of government. Discussions of possible project development pathways with key stakeholders remain ongoing following Presidential and Congressional elections and continue as stakeholders prepare for regional and municipal elections scheduled for October 2026.

A Technical Report on Reserves is expected to be filed in 2027. High-level project layout options together with associated infrastructure requirements and logistical routes have been developed and assessed and preferred layout options have been identified. Evaluation of the preferred layout options and associated infrastructure requirements continued during the quarter and remains focused on advancing engineering definition while maintaining flexibility for stakeholder and permitting considerations.

Haquira

Haquira is located in the Apurímac region of Peru and is a longer-dated greenfield project for the Company. Land access agreements were reached with three local communities during the second quarter of 2023. This enabled a drilling campaign to start at the Haquira East deposit in September 2023 and approximately 14,000 metres were drilled until completion of the planned program at the end of July 2024. During the period, drilling at Haquira returned encouraging intercepts on the northerly margin of the Haquira East resource.

Following the signing of a new land access agreement with a fourth community, a short drilling campaign was also carried out at the Cristo de los Andes satellite deposit in the third quarter of 2024.

The third amendment of the current exploration permit was filed by the Company in November 2023. Following a successful public participation workshop with the local communities as required by applicable law, the permit was approved by the Ministry of Energy and Mines in early February 2025. This amendment extends the term of the permit for seven years, allowing for further drilling in the future as necessary.

The Company negotiated and renewed 2 year access agreements with three communities at Haquira East between March and August 2026. It is also engaging with two communities at Haquira West on land access with the objective of expanding the drilling program into that deposit and other targets within the project area.

‌EXPLORATION

The Company's broader global exploration program is focused on identifying high-quality porphyry and sediment-hosted copper deposits in prospective belts around the world. The Company is engaged in the assessment and early-stage exploration of a number of properties globally, particularly in the Central African copper belt and the Andean porphyry belt. More specific targets are being pursued in other jurisdictions including New Mexico, USA, and Kazakhstan.

Near-mine exploration programs are focused on satellite targets around the Kansanshi and Trident operations in Zambia. At Sentinel, a systematic brownfields exploration program is in progress. It is planned to complete around 10,000 metres of drilling testing four targets by the end of the dry season. The Kansanshi brownfields program is also building momentum with several new properties recently added to the portfolio and diamond drilling underway.

In Kazakhstan, the Company has now established six exploration project areas with three focused on porphyry copper-gold targets and a further three in the Chu-Sarysu basin, which is host to substantial sediment-hosted copper deposits such as Zhezkazgan. Diamond drilling is currently in progress on targets on the north-east margin of Chu-Sarysu.

‌SUMMARY FINANCIAL RESULTS

Three months ended

September 30

Nine months ended September 30

2026

2025

2026

2025

Sales revenues

2,086

1,346

5,012

3,762

Gross profit (loss)

Cobre Panamá

13

128

(58)

163

Kansanshi

260

117

722

498

Trident

377

79

806

280

Corporate & other

28

36

(217)

101

Total gross profit

678

360

1,253

1,042

Exploration

(5)

(7)

(18)

(19)

General and administrative

(45)

(40)

(133)

(122)

Gain on disposal of group companies

-

-

271

-

Other expense

(79)

(90)

(244)

(243)

Operating profit

549

223

1,129

658

Net finance expense1

(180)

(176)

(529)

(508)

Loss on redemption of debt

-

(25)

(90)

(37)

Adjustment for expected phasing of Zambian VAT

16

8

47

39

Income tax expense

(218)

(108)

(561)

(322)

Net earnings (loss)

167

(78)

(4)

(170)

Net earnings (loss) attributable to:

Non-controlling interests

(40)

(30)

(151)

(117)

Shareholders of the Company

207

(48)

147

(53)

Adjusted earnings (loss)2

244

(16)

(9)

3

Earnings (Loss) per share

Basic

$0.25

($0.06)

$0.18

($0.06)

Diluted

$0.25

($0.06)

$0.18

($0.06)

Adjusted2

$0.29

($0.02)

($0.01)

$-

Basic weighted average number of shares (in 000's)

833,198

832,319

832,796

832,213

1 Net finance expense comprises finance income and finance costs.

2 Adjusted earnings (loss) is a non-GAAP financial measure and adjusted earnings (loss) per share is a non-GAAP ratio. Such measures do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See "Regulatory Disclosures".

Sales Revenues THIRD QUARTER

QUARTERLY REVENUE BY COMMODITY QUARTERLY REVENUE BY OPERATION

2,086

177

1,698

34

126

1,144

160

51

203

245

476

911

492

135

888

84

2,086

1,346

$ Millions

$ Millions

42

1,346

Q3 2025 Q3 2026 Q3 2025 Q3 2026

Copper Gold Nickel Other Kansanshi Trident Cobre Panamá Hedge gain (loss) Other

Sales revenues for the third quarter of 2026 totalled $2,086 million, representing a 55% increase of $740 million compared to the same period in 2025, driven by higher realized prices1, and higher nickel sales volumes. This was partially offset by lower copper and gold sales volumes. Sales from Cobre Panamá of $203 million in the three months ended September 30, 2026, compared to sales of $245 million in the three months ended September 30, 2025.

Copper sales revenues excluding Cobre Panamá for the third quarter of 2026 of $1,507 million were 64%, or $589 million, higher than the same quarter of 2025, reflecting higher net realized copper price1, and a 2% increase in copper sales volumes.

The net realized price1 for copper of $6.36 per lb for the third quarter of 2026 was 48% higher than the same quarter of 2025.

Gold sales revenues excluding Cobre Panamá for the third quarter of 2026 of $152 million were 36% or $40 million, higher than the same quarter of 2025, attributable to a 23% increase in the net realized gold price1, and a 14% increase in gold sales volumes. Gold sales revenues include $51 million for the cost of refined-backed credits.

Nickel sales revenues of $177 million for the third quarter of 2026 were 421%, or $143 million, higher than the same quarter of 2025, driven by an 11kt increase in nickel sales volumes and marginally higher net realized nickel prices1.

1 Realized metal price is a non-GAAP ratio, which does not have a standardized meaning under IFRS and might not be comparable to similar financial measures disclosed by other issuers. See "Regulatory Disclosures" for further information.

NINE MONTHS

YEAR-TO-DATE REVENUE BY COMMODITY YEAR-TO-DATE REVENUE BY OPERATION

5,012

5,012

3,118

384

145

115

4,035

433

98

446

334

1,576

1

1,465

386

2,530

203

(308)

2,311

276

3,762

$ Millions

$ Millions

3,762

September 30, 2025 September 30, 2026 September 30, 2025 September 30, 2026

Copper Gold Nickel Other Cobre Panamá Kansanshi Trident Hedge gain (loss) Other

Sales revenues for the nine months ended September 30, 2026, totalled $5,012 million, representing a 33%, or $1,250 million, increase compared to the same period of 2025, driven by higher realized prices1 and higher nickel sales volumes, partially offset by lower copper and gold sales volumes. Sales from Cobre Panamá of $203 million in the nine months ended September 30, 2026, compared to sales of $334 million in the nine months ended September 30, 2025.

The net realized price1 for copper of $5.64 per lb for the first nine months of 2026, was 33% higher than the same period in 2025. This compares to an increase of 41% in the average LME price of copper for the same period to $6.09 per lb. Copper sales revenues include a $287 million loss on the copper sales hedge program.

Copper sales revenues excluding Cobre Panamá for the nine months ended September 30, 2026, of $3,844 million were 37%, or $1,029 million, higher than the comparable period of 2025, driven by a 33% increase in the net realized copper price1, offset by a 3% decrease in copper sales volumes.

Gold sales revenues excluding Cobre Panamá for the first nine months of 2026 of $425 million were 18%, or $65 million, higher than the comparable period in 2025, attributable to 36% higher net realized gold prices1 and offset by a 9% decrease in gold sales volumes. Gold sales revenues include $122 million for the cost of refined-backed credits.

Nickel sales revenues of $446 million were 208%, or $301 million, higher than the same period of 2025, due to higher nickel sales at Enterprise and a 13% increase in the net realized nickel price1 to $7.36 per lb compared to the same period in 2025.

1 Realized metal price is a non-GAAP ratio, which does not have a standardized meaning under IFRS and might not be comparable to similar financial measures disclosed by other issuers. See "Regulatory Disclosures" for further information.

Three months ended

September 30

Nine months ended September 30

Copper selling price (per lb)

2026

2025

2026

2025

Average LME cash price

$6.40

$4.44

$6.09

$4.33

Realized copper price1

$6.37

$4.38

$5.67

$4.31

Treatment/refining charges ("TC/RC") (per lb)

$-

($0.04)

($0.02)

($0.04)

Freight charges (per lb)

($0.01)

($0.04)

($0.01)

($0.02)

Net realized copper price1

$6.36

$4.30

$5.64

$4.25

Three months ended

September 30

Nine months ended September 30

Gold selling price (per oz)

2026

2025

2026

2025

Average LBMA cash price

$4,258

$3,455

$4,544

$3,201

Net realized gold price1,2

$4,125

$3,358

$4,246

$3,131

Three months ended

September 30

Nine months ended September 30

Nickel selling price (per payable lb)

2026

2025

2026

2025

Average LME cash price

$7.52

$6.81

$7.86

$6.92

Realized nickel price1

$7.51

$6.85

$7.84

$6.90

Treatment/refining charges ("TC/RC") (per lb)

($0.61)

$0.01

($0.48)

($0.40)

Net realized nickel price1

$6.90

$6.86

$7.36

$6.50

1 Realized metal prices are a non-GAAP ratio which does not have a standardized meaning under IFRS and might not be comparable to similar financial measures disclosed by other issuers. See "Regulatory Disclosures" for further information.

2 Excludes gold revenues recognized under the stream arrangements.

3 Realized Copper price includes hedge losses of nil for the three months ended September 30, 2026, and $287 million, for the nine months ended September 30, 2026.

Given the volatility in commodity prices, significant variances may arise between average market price and net realized prices due to the timing of sales during the period.

Gross Profit Third Quarter

Gross profit in Q3 2025

360

Gross profit in Q3 2025 (Excl. Cobre Panamá)

232

Higher net realized prices1

497

Higher sales volumes and change in sales mix

115

Higher by-product contribution

33

Higher cash costs1

(130)

Higher royalty expense

(43)

Higher depreciation

(18)

Negative impact of foreign exchange on operating costs

(21)

Gross profit in Q3 2026 (Excl. Cobre Panamá)

665

Gross profit in Q3 20262

678

1 Realized metal price and C1 cash costs (C1) are non-GAAP ratios, which do not have a standardized meaning under IFRS and might not be comparable to similar financial measures disclosed by other issuers. See "Regulatory Disclosures" for further information.

2 Gross profit is reconciled to EBITDA by including exploration costs of $5 million, general and administrative costs of $45 million, care and maintenance costs of

$5 million, share of loss in joint venture of $17 million, and adding back depreciation of $233 million and other expense of $5 million (a reconciliation of EBITDA is included in "Regulatory Disclosures").

QUARTERLY GROSS PROFIT BY OPERATION

678

128

117

79

38

260

13

377

28

$ Millions

360

(2)

Q3 2025 Q3 2026

Cobre Panamá Kansanshi Trident Hedge gain (loss) Other

Gross profit for the third quarter of 2026 was $678 million, an increase of $318 million, or 88%, from the same quarter in 2025, driven by higher net realized prices1 and higher nickel sales volumes at Enterprise. Total sales revenues from Cobre Panamá for the third quarter of 2026 were $203 million, contributing a total of $13 million to gross profit. Comparatively, sales revenues from Cobre Panamá for the third quarter of 2025 of $245 million, contributing $128 million to gross profit, resulted from the concentrate shipment following the approval of the P&SM plan by the GOP.

Gross profit excluding Cobre Panamá was $665 million, an increase of $433 million, or 187%, from the same period in 2025. Higher net realized prices1,higher sales volumes and higher by-product contributions more than offsets the impact of higher cash costs1, including the effect of a stronger Zambian kwacha, increased royalty and depreciation expenses.

Nine Months

Gross profit first nine months 2025

1,042

Gross profit in 2025 (Excl. Cobre Panamá)

879

Higher net realized prices1

1,292

Movement in hedge program

(309)

Higher sales volumes and change in sales mix

106

Lower by-product contribution

(20)

Higher cash costs1

(317)

Higher royalty expense

(166)

Higher depreciation

(75)

Negative impact of foreign exchange on operating costs

(79)

Gross profit in 2026 (Excl. Cobre Panamá)

1,311

Gross profit first nine months 20262

1,253

1 Realized metal price and C1 cash cost (C1) are a non-GAAP ratios which do not have a standardized meaning under IFRS and might not be comparable to similar financial measures disclosed by other issuers. See "Regulatory Disclosures" for further information.

2 Gross profit is reconciled to EBITDA by including exploration costs of $18 million, general and administrative costs of $133 million, care and maintenance costs of

$127 million, share of loss in joint venture of $65 million, and adding back depreciation of $647 million and other income of $13 million (a reconciliation of EBITDA is included in "Regulatory Disclosures").

YEAR-TO-DATE GROSS PROFIT BY OPERATION

1,253

163

498

(58)

722

806

91

100

1

280

$ Millions

1,042

(308)

September 30, 2025 September 30, 2026

Cobre Panamá Kansanshi Trident Hedge gain (loss) Other

Gross profit for the first nine months of 2026 was $1,253 million, an increase of $211 million, or 20%, from the same period in 2025. Total revenues from Cobre Panamá for the first nine months of 2026 were $203 million, with a negative contribution to gross profit of $58 million. Comparatively, sales revenues from Cobre Panamá for the nine months of 2025 of $334 million, contributing $163 million to gross profit, resulted from the concentrate shipment following the approval of the P&SM plan by the GOP.

Gross profit excluding Cobre Panamá of $1,311 million an increase of $432 million, or 49%, from the same period in 2025. Higher realized prices1 and higher sales volumes more than offset higher cash costs¹, including the effect of a stronger Zambian kwacha, increased royalty and depreciation expenses, and lower contributions from by-products.

1 Realized metal price and C1 cash costs (C1) are non-GAAP ratios, which do not have a standardized meaning under IFRS and might not be comparable to similar financial measures disclosed by other issuers. See "Regulatory Disclosures" for further information.

Net Earnings (Loss) Third Quarter

Net earnings attributable to shareholders of the Company for the third quarter of 2026 was $207 million, a $255 million increase compared to loss of $48 million in the same quarter of 2025. Gross profit for the third quarter of 2026 was $678 million, an increase of $318 million, or 88%, from the same quarter in 2025. Sales from Cobre Panamá of $203 million in the three months ended September 30, 2026, compared to sales of $245 million in the three months ended September 30, 2025.

An income tax expense of $218 million was recognized in the third quarter of 2026, compared with a $108 million income tax expense recognized in the same quarter of 2025, reflecting applicable statutory tax rates that range from 20% to 30% for the Company's operations. A significant proportion of the Company's interest expense is incurred in jurisdictions where no tax credit is recognized. The effective tax rate excluding Cobre Panamá and share of joint venture, Ravensthorpe, interest expense, and one-off adjustments for the quarter ended September 30, 2026, was 34%.

Net finance expense of $180 million was $4 million higher than the same quarter of 2025. Net finance expense consists of interest on debt of $136 million, accretion of deferred revenue of $34 million, related party finance cost of $26 million, and accretion on restoration provision of $6 million, offset by finance income of $25 million.

Other expense of $79 million includes $31 million in foreign exchange loss, a $17 million share of loss in KPMC and $24 million of commissioning costs at Cobre Panamá.

Basic earnings per share was $0.25 during the quarter, compared to $0.06 loss per share in the same quarter of 2025.

Nine Months

Net earnings attributable to shareholders of the Company of $147 million for the first nine months of 2026 was $200 million favourable compared to loss of $53 million in same period in 2025. It includes a $271 million gain on disposal of group companies and $90 million of loss on redemption of debt, and commissioning costs of $66 million at Cobre Panamá. Gross profit for the first nine months of 2026 was $1,253 million, an increase of $211 million, or 20%, from the same period in 2025. Sales from Cobre Panamá of $203 million in the nine months ended September 30, 2026, compared to sales of $334 million in the nine months ended September 30, 2025. Sales revenue from Cobre Panamá for the nine months of 2025 of $334 million resulted from the concentrate shipment following the approval of the P&SM plan by the GOP.

Net finance expense of $529 million was $21 million higher than the same period of 2025. Net finance expense principally consisted of interest on debt of $385 million, accretion of deferred revenue of $107 million, related party finance cost of $76 million, and accretion on restoration provision of $18 million, offset by finance income of $72 million.

Other expense of $244 million consists of C&M costs of $127 million, $40 million lower than the same period of 2025, and a

$65 million share of loss in KPMC, compared to the $69 million loss recognized in the same period of 2025, offset by a $19 million gain in foreign exchange. A credit of $47 million reflecting the expected phasing of the Zambian VAT was recognized during the first nine months of 2026.

An income tax expense of $561 million was recognized in the first nine months of 2026, compared to a $322 million expense recognized in the same period in 2025, reflecting applicable statutory tax rates that range from 20% to 30% for the Company's operations. No tax credits have been recognized with respect to net losses of $308 million realized under the Company's sales hedge program, nor with respect to losses on redemption of $90 million. The effective tax rate excluding Cobre Panamá and share of joint venture, Ravensthorpe, interest expense and one-off adjustments for the nine months ended September 30, 2026, was 35%.

Basic earnings per share was $0.18 during the first nine months of 2026, compared to a loss per share of $0.06 in the same period of 2025.

Adjusted Earnings (Loss)1 THIRD QUARTER

QUARTERLY ADJUSTED EARNINGS (LOSS)1 QUARTERLY ADJUSTED EARNINGS (LOSS) PER SHARE2

244

45

79

19

(157)

(2)

(10)

(146)

160

240

$ Millions

$ per share

$0.29

$0.02

$0.01

$(0.02)

$(0.13)

$(0.18)

(16)

Q3 2025 Q3 2026

Q2 2025 Q3 2025 Q4 2025 Q1 2026 Q2 2026 Q3 2026

Cobre Panamá Kansanshi Trident Other Hedge gain (loss)

Adjusted earnings (loss) per share

Adjusted earnings1 of $244 million for the quarter ended September 30, 2026, compares to adjusted loss1 of $16 million in the same period in 2025, representing an increase of $260 million, primarily attributable to $318 million higher gross profit. Adjusted earnings per share2 of $0.29 in the third quarter compares to adjusted loss per share2 of $0.02 in the same quarter of 2025.

The principal items not included in adjusted earnings1 in the quarter are an FX loss of $31 million and $24 million of commissioning costs at Cobre Panamá. Where relevant, adjustments are affected for minority interest and joint venture ownership.

The effective tax rate, on an adjusted basis excluding Cobre Panamá and share of joint venture, Ravensthorpe, interest expense, losses realized under the Company's sales hedge program, and one-off adjustments, for the quarter ended September 30, 2026, was 34%. A reconciliation of adjusted metrics is included in "Regulatory Disclosures".

NINE MONTHS

YEAR-TO-DATE ADJUSTED EARNINGS (LOSS)1 YEAR-TO-DATE ADJUSTED EARNINGS (LOSS) PER SHARE2

(449)

(182)

456

502

1

152

345

3

$ Millions

$ per share

$0.00

$(0.01)

(46)

(308)

(477)

(9)

September 30, 2025 September 30, 2026

Cobre Panamá Kansanshi Trident Other Hedge gain (loss)

September 30, 2025 September 30, 2026

Adjusted earnings per share

Adjusted loss1 of $9 million for the nine months ended September 30, 2026, compares to adjusted earnings1 $3 million in the same period in 2025, representing a $12 million decrease. Adjusted loss per share2 of $0.01 in the first nine months compares to adjusted earnings per share2 of $0.00 in the same period of 2025.

The principal items not included in adjusted loss1 are the gain on disposal of group companies of $271 million, the $90 million loss on redemption of debt, an FX gain of $19 million, $47 million credit adjustment for expected phasing of Zambian VAT and $66 million of commissioning costs at Cobre Panamá. Where relevant, adjustments are affected for minority interest and joint venture ownership.

The effective tax rate for the nine months ended September 30, 2026, on an adjusted basis, excluding Cobre Panamá and share of joint venture, Ravensthorpe, interest expense and one-off adjustments was 35%. A reconciliation of adjusted metrics is included in "Regulatory Disclosures".

‌LIQUIDITY AND CAPITAL RESOURCES

Three months ended

September 30

Nine months ended September 30

2026

2025

2026

2025

Cash flows from operating activities

600

1,195

1,150

2,118

Cash flows used by investing activities

(320)

(301)

(682)

(894)

Cash flows used by financing activities

(268)

(670)

(327)

(1,076)

Exchange losses on cash and cash equivalents

(2)

(1)

(4)

-

Net cash inflow

10

223

137

148

Cash and cash equivalents and bank overdrafts

781

960

781

960

Total assets

25,160

24,827

25,160

24,827

Total current liabilities

2,042

1,841

2,042

1,841

Total long-term liabilities

11,388

11,382

11,388

11,382

Net debt1

5,309

4,751

5,309

4,751

Cash flows from operating activities per share2

$0.72

$1.44

$1.38

$2.55

1 Net debt is a supplementary financial measure, which does not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See "Regulatory Disclosures".

2 Cash flows from (used by) operating activities per share is a non-GAAP ratio and does not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See "Regulatory Disclosures".

THIRD QUARTER

Cash Flows from Operating Activities

Excluding the receipt of $1.0 billion from the Royal Gold streaming arrangement in the third quarter of 2025, cash flows from operating activities for the third quarter of $600 million were $405 million higher than the same quarter of 2025. The increase primarily reflected a $409 million increase in EBITDA1 contribution, and favourable movements in working capital partially offset by increased taxes paid and amortization of deferred revenue.

Cash Flows used by Investing Activities

Cash flows used by investing activities of $320 million mostly comprised of capital expenditures of $332 million, $52 million higher than the same quarter of 2025.

Cash Flows from Financing Activities

Cash flows used by financing activities of $268 million for the third quarter of 2026, including a net outflow of $92 million on total debt, this compares to a net outflow of $510 million for the third quarter of 2025, due to repayments of principal debt and net of proceeds from the issuance of bonds. Interest paid of $151 million was $15 million lower than the combined interest paid of $141 million and capitalized interest of $25 million in the third quarter of 2025.

NINE MONTHS

Cash Flows from Operating Activities

Excluding the receipt of $1.0 billion from the Royal Gold gold streaming arrangement in the third quarter of 2025 and the

$500 million copper prepayment in the second quarter of 2025, cash flows from operating activities for the nine months of

$1,150 million were $532 million higher than the same period of 2025. The increase primarily reflected a $358 million increase in EBITDA1 contribution, and favourable movements in working capital partially offset by increased taxes paid and amortization of deferred revenue.

Cash Flows used by Investing Activities

Cash flows used by investing activities of $682 million for the nine months of 2026 were $212 million lower than 2025, and included capital expenditures of $920 million. This was partially offset by proceeds on the disposal of group companies of

$212 million, net of cash disposed of $171 million.

1 EBITDA is a non-GAAP financial measure which does not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial