Expanded Drilling Program at Firetower Gold-Tungsten Project
Filed with ASX · · 8 pages · English and French
Summary by 6ix AI
Flynn Gold Ltd has announced an expanded drilling program at its Firetower Gold-Tungsten Project in Tasmania, increasing the number of planned drill holes from three to ten. The program aims to explore depth extensions of high-grade mineralization and collect core samples for metallurgical testing. Results from this drilling will support the delivery of a maiden Mineral Resource Estimate for the project.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
Earlier from Flynn Gold
- Flynn Completes Sale of WA Projects
- March 2026 Quarterly Activities Report and Appendix 5B
- Flynn Ramps Up Gold Exploration at Golden Ridge, NE Tasmania
- High-Grade Silver in First Hole at Silver King Mine Tasmania
- More Firetower Shallow High-Grade Gold-Tungsten Intercepts
Later from Flynn Gold
- Drilling Confirms Strike-Extensive Silver System
- First Firetower Drill Hole Extends High-Grade Gold-Tungsten
- Key Mining Lease Application Registered for Golden Ridge
- Study to Unlock New Firetower Gold-Tungsten-Copper Targets
- June 2026 Quarterly Activities Report and Appendix 5B
Follow Flynn Gold into a list and get an email when it puts out news.
Follow Flynn Gold