Klondex Updates Progress on Permitting for Underground Development
VANCOUVER, BRITISH COLUMBIA, September 14 /CNW/ - Klondex Mines Ltd. (TSX: KDX) reviewed progress from the Phase 6 drilling program at its 100%-owned Fire Creek property in the Battle Mountain-Eureka Trend in Northern Nevada. The goal of the drilling program is to add to the existing mineral resource base and find new zones of significant gold mineralization at the Fire Creek property. These goals are being accomplished utilizing:
1. "Extension" drilling in the boiling zone of the Main and Far North resource area, and
2. "Exploration" drilling of potential mineralization targets identified by an induced polarization (IP) survey conducted last year.
All thirteen Phase 6 "extension" holes have contributed valuable information regarding the structural control and continuity of the Main Zone and Far North Zone veining and are expected to increase both the tonnage and grade from the previously announced NI 43-101 compliant indicated resource at Fire Creek of 1,054,738 ounces of gold in 1,636,555 tonnes (19.88 grams per ton "gpt"). The Company has also completed eleven "exploration" holes to test IP anomalies. While these holes have not encountered new economic intercepts, several have reported anomalous gold values and a few are considered highly encouraging.
Commenting on the Company's progress, Robert Sibthorpe, Technical Director, commented, "Our Phase 6 drilling program progresses well and ahead of schedule, with results that will certainly enable Klondex to expand its indicated mineral resource in our next formal resource update. We believe our investment in exploration this year, estimated at approximately $3.3 million CDN, is delivering a very attractive return on investment to our shareholders in terms of driving an increase in our gold and silver resource and the inherent value of our company.
"On the permitting front, we are making good progress with several agencies, however some unavoidable regulatory delays have required that we extend our timelines for approvals and the commencement of underground development by a few months. In the interim, we continue to develop our underground plans, and our dialogue and negotiations with several potential mining contractors continue, as do our conversations with potential milling partners. While regulatory delay is unfortunate but not unusual during this very active period in the industry, we are making good use of the extra time to advance our planning."
As previously announced, Fire Creek's current Plan of Operations is being amended to include up to 3,000 meters of underground workings to permit access to the Main Zone on two levels. The permitting and contractor selection processes associated with the Main Zone underground program are progressing, though behind the company's original schedule. Final permits are now anticipated by year-end 2007 or early 2008 with development work commencing immediately thereafter. The underground workings will facilitate in-fill drilling to further improve knowledge regarding grade and vein continuity.
Klondex has made application for designation as a "Small Scale Facility" as defined by Nevada Regulation NAC 445A.377, allowing for the extraction and processing in the Main Zone of a series of bulk samples of not more than 33,180 metric tonnes of ore per year and no more than 109,090 metric tonnes in total. Based on the Company's NI 43-101 compliant resource estimate, the weighted average grade of the target areas for the bulk sample is 67 grams of gold per tonne.
Based on preliminary estimates developed in-house for permitting, underground access, exploration, drilling, mining and other costs, Klondex believes it could generate a substantial operating profit during a three-to-four year underground development/bulk sampling program, assuming no unforeseen circumstances.
PHASE 6 DRILLING RESULTS TO DATE
A plan map setting out hole locations is available on the Company's website at http://www.klondexmines.com/s/News.asp
Fire Creek Resource Zone
The gold mineralization in the Main Area is in a swarm of epithermal low-sulfidation quartz-carbonate veins striking NNW within a corridor about 300 meters wide and about 1 kilometer in length. There are at least 12 veins carrying significant gold values in the Main and Far North Zones. The individual veins are usually 100-400 meters in length. Important gold values are generally restricted in a vertical sense to a "boiling zone" between 1750 to 1500 meters above sea level. Thirteen new holes have been drilled during Phase 6 to test the large gaps between or beyond drill intercepts used in the calculation of the September 2006 resource estimate in an effort to increase the overall indicated mineral resource while staying within its given restrictions.
From north to south, these holes produced the following results:
SECTION 800N: Hole FC0727 tested the 100 meter gap between FC0525 (13.2gpt/9.8m) and FC0612 (34.1/3.2 m) and reported intervals of 7.8 gpt over 6.1 meters and 29.5 gpt over 1.52 meters in the Far North Zone.
SECTION 400N: Hole FC 0709 tested the high grade Vein Set 7 through 4 at the bottom of the "boiling zone." As it approached Vein 7 from the west, a low grade interval (1.3 gpt over 13 meters) was reported followed by 1.5 meters of 42.5 gpt and at the projection of Vein 4 a 0.3 meter sample assayed 98.5 gpt. These veins are linked to the strong gold values on Section 350N.
SECTION 250N: Hole 0706 reported no significant values on the down dip extension of Vein 3 on this section.
SECTION 200N: Hole FC0705 tested the 120 meter gap between intercepts on Vein 3 in holes FC0408 (14.2 gpt/2.1m) and FC0416 (5.6gpt/3.66m). It returned a broad zone of 1.7 gpt over 13.7 meters, indicating that the vein may have entered a porous host rock. Higher up the hole, between projections of Vein 5 and 6, an interval of 13.0 gpt over 3.05 meters was recorded.
SECTION 150N: Hole FC0704 (previously reported) had an intercept of 11.1 gpt over 5 meters. Hole FC0710 was collared on top of the Main Zone to test IP anomaly "0" to the west and thus did not impact the main Zone resource. It produced sub-ore intercepts, possibly representing the new vein at IP anomaly "0".
SECTION 100N: Hole FC0703 targeted the down dip extensions of the high-grade intercept in FC0621 on Vein 3. FC0703 returned an intercept of 10.5 gpt gold and 160 gpt silver over 2.1m, 50 meters deeper. Hole FC0711 (previously reported) was drilled westward, directed at IP anomaly "0" outside of the Main Zone. As it passed through the siliceous cap rock over the Main Zone it intersected 11.3 gpt over 3.05 meters in the RC portion of the hole about 50 meters below surface. FC0711 also returned an intercept of 6 gpt over 3 meters which could represent the IP "0" anomaly, a new vein some 100 meters west of the current Main Zone boundary.
Fire Creek Drill Hole Status 2007; Phase 6 through August 2007
----------------------------------------------------------------------
Section Status Hole(number sign) Azim Angle TD Area From To
Feet Feet Feet
----------------------------------------------------------------------
800N New FC0727 75 -45 1293 Far North 920 940
and 975 980
----------------------------------------------------------------------
400N New FC0709 75 -45 1709 Main 1255 1260
and 1402 1403
----------------------------------------------------------------------
No economic
250N New FC0706 75 -47 1202 Main intervals
----------------------------------------------------------------------
200N New FC0705 75 -49 1205 Main 230 240
and 845 890
----------------------------------------------------------------------
150N New FC0704 75 -45 1292 Main 935 951
No economic
150N New FC0710 255 -45 1409 East Main intervals
----------------------------------------------------------------------
100N New FC0703 75 -47 1188 Main 998 1005
100N PR FC0711 255 -45 1400 West Main 220 230
and 1115 1125
----------------------------------------------------------------------
50N PR FC0702 75 -51 1181 Main 1077.7 1115
50N New FC0708 85 -45 900 East Main 590 625
----------------------------------------------------------------------
100S PR FC0701 88 -45 905 Main 465 470
100S New FC0734 87 -44 1022 Main 515 535
100S New FC0735 87 -70 1000 Main 605 717.5
----------------------------------------------------------------------
New FC0714 75 -64 1300 IP Anomaly 4 729 732
No economic
New FC0717 75 -58 1480 IP Anomaly 4 intervals
----------------------------------------------------------------------
No economic
New FC0719 75 -45 1303 IP Anomaly 1 intervals
New FC0720 75 -45 1750 IP Anomaly 1 970 1115
New FC0722 75 -45 1580 IP Anomaly 1 980 1050
----------------------------------------------------------------------
No economic
New FC0728 75 -45 1300 IP Anomaly 2 intervals
No economic
New FC0729 75 -45 1300 IP Anomaly 2 intervals
----------------------------------------------------------------------
No economic
New FC0732 75 -45 1489 IP Anomaly 10 intervals
No economic
New FC0733 75 -45 1499 IP Anomaly 10 intervals
----------------------------------------------------------------------
Fire Creek Drill Hole Status 2007; Phase 6 through August 2007
----------------------------------------------------------------------
Section Status Hole(number sign) Interval Interval Au Ag
Feet (1) Meters (1) gpt gpt
----------------------------------------------------------------------
800N New FC0727 20 6.10 7.80 12.90
5 1.52 29.50 5.40
----------------------------------------------------------------------
400N New FC0709 5 1.52 42.50 10.10
1 0.30 98.50 43.80
----------------------------------------------------------------------
No
economic
250N New FC0706 intervals
----------------------------------------------------------------------
200N New FC0705 10 3.05 13.00 10.30
45 13.72 1.70 4.20
----------------------------------------------------------------------
150N New FC0704 16 4.88 11.10 4.87
No
economic
150N New FC0710 intervals
----------------------------------------------------------------------
100N New FC0703 7 2.13 10.50 160.70
100N PR FC0711 10 3.05 11.30 9.00
10 3.05 6.30 22.30
----------------------------------------------------------------------
50N PR FC0702 37.3 11.37 21.73 11.40
50N New FC0708 35 10.67 3.13 9.07
----------------------------------------------------------------------
100S PR FC0701 5 1.52 25.30 11.10
100S New FC0734 20 6.10 5.20 3.90
100S New FC0735 112.5 34.30 1.60 7.20
----------------------------------------------------------------------
New FC0714 3 0.91 3.70 84.10
No
economic
New FC0717 intervals
----------------------------------------------------------------------
No
economic
New FC0719 intervals
New FC0720 145 44.21 1.60 2.10
New FC0722 70 21.34 1.20 0.00
----------------------------------------------------------------------
No
economic
New FC0728 intervals
No
economic
New FC0729 intervals
----------------------------------------------------------------------
No
economic
New FC0732 intervals
No
economic
New FC0733 intervals
----------------------------------------------------------------------
PR (equal sign) Previously reported holes
New (equal sign) New holes
(1) True width (equal sign) approximately 70-80% interval width
SECTION 050N: Hole FC0702 (previously reported) targeted the down dip extension of the high grade intercept from FC0619 on Vein 2 and returned 21.7 gpt over 11.4 meters. Hole FC0708 filled the gap between FC90143 (5.9 gpt/7.3m) and FC0507 (12.5gpt/2.44m) on Vein 2 and returned 3.1 gpt over 9.1 meters.
Section 100S: Hole FC0701 (previously reported) intersected 1.5 meters of 26 gpt gold about 180 meters below surface. It occurs on Vein 3 and represents the southernmost economic intercept drilled to date at Fire Creek. This hole was offset with FC0734 which returned 5.2 gpt over 6.1 meters at the same depth but 30 meters to the east. Hole FC0735 was drilled beneath these 2 holes and returned a broad intercept of 1.6 gpt over 34 meters, some 75 meters deeper. There has been very limited drilling on this Vein further to the south and additional holes have been scheduled.
Exploration Holes:
Assay results have been received for an additional nine holes, which were directed at IP anomalies outside of the Main and Far North Resource Zone. Although no economic intercepts were reported in these holes, several IP anomalies reported anomalous gold values and a few are considered highly encouraging. For instance, drill holes FC0732 and FC0733, which tested IP anomaly 10, both contained +1.5 g/t gold intercepts but below favorable host rocks. Testing of this gold-bearing structure within rocks favorable for veining higher in the section has been scheduled.
As of August 31, 2007, Klondex had 22,836,173 shares issued with and cash of approximately $7.1 million CDN invested in Canadian treasury notes and in guaranteed bank accounts. The Company has no exposure to any derivatives, futures, hedges or related risks.
Richard Kern (P.Geo) of Reno, Nevada, is the Company's qualified person on the project as required under NI 43-101 and has reviewed the technical information contained in this press release.
Klondex has in place a rigorous QA/QC program consistent with National Instrument 43-101 and using best industry practice. ALS Chemex Labs of Reno, Nevada and SGS Minerals services, Toronto responsible for all the Klondex Mine's assaying.
About Klondex Mines Ltd.:
Klondex (TSX: KDX) is a gold exploration company focused on the development and expansion of its high-grade Fire Creek deposit in Nevada. Klondex has identified an Indicated Mineral Resource of over 1,000,000 ounces of gold at Fire Creek and has filed for permits to begin bulk sampling of up to 120,000 tons ore. Fire Creek is located in the Battle Mountain-Eureka Trend in the Northern Nevada Rift, in North Central Nevada, an area of prolific gold production. Klondex currently has two drill rigs working to expand its resource at Fire Creek. The Company was founded over 30 years ago, and its property portfolio contains four other gold exploration projects, all in Nevada. For more information, please visit www.klondexmines.com.
ON BEHALF OF KLONDEX MINES LTD. "William J. Solloway" "Robert Sibthorpe" President Technical Director