Peel Mining LimitedASX: PEX

Copper at Wirlong Continues & Mallee Bull Drilling Underway

· Issued by Peel Mining Limited

Filed with ASX · · 20 pages · English

 Further significant zones of copper mineralisation in recent drilling; processing and sampling is continuing with assays pending for four holes (WLDD010 – WWLD013) with visible sulphide mineralisation  Maiden resource drilling ongoing with two diamond rigs  High-grade copper mineralisation at Wirlong Central has been defined from near surface to more than 600m below surface and remains open in

Peel Mining Limited on 6ix

Story so far

Earlier from Peel Mining

Later from Peel Mining

All Peel Mining news releases