Challenger DFS Pit Optimisation Drilling Complete
Filed with ASX · · 3 pages · English
Summary by 6ix AI
The drilling program included both reverse circulation and diamond drilling to gather geotechnical data and metallurgical samples for further analysis. The company is targeting an initial baseline operation that utilizes historical tailings and near-surface materials to minimize risks and costs associated with underground mining. Barton aims to maximize development options across its various projects while preparing for the restart of its Central Gawler Mill.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
Barton Gold Holdings Limited on 6ix
In the deck
Story so far
Earlier from Barton Gold
- $520,000 Cash R&D Tax Refund Received
- Challenger RC Resource Upgrade Drilling Complete
- Challenger DFS Pit Optimisation Drilling Begins
- Tunkillia Phase 2 Resource Upgrade Drilling Begins
- Barton Distributes $640,000 in JMEI Tax Credits
Later from Barton Gold
- First Challenger Assays Return Grades up to 170g/t Au
- Challenger West Assays Return Grades up to 60 g/t Au
- Dual Rigs Commence Tunkillia Diamond Drilling
- Tolmer Yields 100,000 g/t Silver Trial Gravity Concentrate
- Drilling Targets High-Grade Tolmer Silver Extensions
Follow Barton Gold into a list and get an email when it puts out news.
Follow Barton Gold