In c3644 sent today at 08:45e an error occurred in the first table under
the heading "RA-10-05: Location: NAD 83 - 615000E / 5190200N." The third
column, first line should read "45.6" instead of "63.5". Full
corrected copy follows.
Randsburg Announces Final 2005 Titan Drill Results Showing Large
Intercepts of Iron/Titanium and Vanadium
- 64 Metre Drill Intercept of 75.47% Iron Oxide/Titanium Dioxide/Vanadium
- 2035 Metres of Mineralization in Six Drill Holes
- NI 43-101 Report in Process to Define a Resource Estimate
Trading Symbol: RGZ.V
TORONTO, March 3 /CNW/ - Randsburg International Gold Corporation
(TSX-V: RGZ) announced today assay results from 2035 metres of drill
intersections of iron, titanium and vanadium from six drill holes during
Phase 2 of a Stage 2 drill program at its 100%-owned Titan Project.
The Company has a report in process to comply with National Instrument
Policy 43-101. The purpose of the 43-101 report is to define a resource
estimate for the property. The Company expects the report to be completed by
the end of April.
The three new drill holes being reported today are drill holes twenty
(RA-20-05), twenty-one (RA-21-05) and twenty-two (RA-22-05). The deepening of
holes ten (RA-10-5), eleven (RA-11-05) and twelve (RA-12-05) is also being
reported today. The Titan Project is an advanced exploration project located
in Flett and Angus Townships, Ontario. Several of the holes ended in heavy
mineralization. All of the above holes were drilled vertically with the
exception of hole RA-20-5 which was drilled at -80 degrees.
The Titan Project comprises 2150 contiguous hectares (5370 acres) of
8 claims (123 units) and 17 patents. Flett and Angus Townships are located
120 kilometres northeast of Sudbury, Ontario and 50 kilometres north of the
City of North Bay.
A map showing the drill hole locations is located at
www.agoracom.com/IR/Randsburg. The following is a summary of assay results:
<<
-------------------------------------------------------------------------
RA-10-05: Location: NAD 83 - 615000E / 5190200N
---------
Drill hole RA-10-05 is on the same location as RA-05-04 and RA-01-04
drilled in 2004 but drilled vertically whereas the holes drilled in 2004 are
at -45 degrees to the east and west. Significantly higher values of
mineralization occurred in two zones: in the middle of the hole between
176 metres and 234 metres with titanium dioxide averaging 18.23 percent and
iron oxide averaging 57.6 percent and toward the bottom with titanium dioxide
averaging 18.58 percent and iron oxide averaging 56.6 percent. The hole ended
in strong 18.0+% titanium dioxide. The host is olivine gabbro / troctolite.
TiO(2)%
Intersection Thickness Fe(2)O(3)% (titanium V%
(metres) (metres) (iron oxide) dioxide) (vanadium)
-------------------------------------------------------------------------
3-414 411 45.6 13.76 0.22
Range 18.3-62.9 1.9-20.6 0.03-0.36
Including: 176 to 234 58 57.6 18.23 0.29
Including: 350 to 414 64 56.6 18.58 0.28
-------------------------------------------------------------------------
RA-11-05: Location: NAD 83 - 614950E / 5190150N
---------
Drill hole RA-11-05 is located in the western portion of the drill
program toward the area of previously reported historical drilling. The entire
hole contains significant iron - titanium mineralization in the host, olivine
gabbro, with mineralization persistent at 440 metres.
3-440 437 45.6 14.17 0.22
Range 15.0-65.5 1.4-20.6 0.01-0.38
-------------------------------------------------------------------------
RA-12-05: Location: NAD 83 - 615050E / 5190150N
---------
The hole is 50 metres east of RA-06-04, which contains 387 metres of
10.2% titanium dioxide and is located at the eastern extremity of the current
drill program.
2-416 414 30.3 7.85 0.12
Range: 15.12-61.15 1.08-20.0 0.01-0.30
-------------------------------------------------------------------------
RA-20-05: Location: NAD 83 - 614980E / 5190050N
---------
The hole is located in the south-western portion of the steeply plunging
mineralized body. It was drilled towards the east at -80 degrees. Adjacent
holes, such as RA-05-11 and RA-08-05 are well mineralized. Hole RA-04-4,
located to the south, is less mineralized than hole 20.
TiO(2)%
Intersection Thickness Fe(2)O(3)% (titanium V%
(metres) (metres) (iron oxide) dioxide) (vanadium)
-------------------------------------------------------------------------
1.0-278 277 24.9 6.74 0.09
Range: 10.3-41.2 0.84-12.05 0.01-0.19
-------------------------------------------------------------------------
RA-21-05: Location: NAD 83 - 614982E / 5190306N
---------
The hole is located in the northern portion of the mineralized body.
3.0-200 197 44.86 13.65 0.23
Range: 14.9-60.5 2.29-19.35 0.03-0.34
Including 3.0-144 141 51.22 16.01 0.27
-------------------------------------------------------------------------
RA 22-05: Location: NAD 83 - 614900E / 5190150N
---------
The hole is located in the west-central portion of the mineralized body.
Adjacent holes RA-11-05, RA-09-05 and RA-08-05 are also consistently
mineralized. The mineralization is open at depth.
3.0-302 299 45.13 14.26 0.21
Range: 8.8-67.7 0.52-22.5 0.01-0.35
-------------------------------------------------------------------------
The Company has completed a winter drilling program of an additional
eight drill holes totalling 1651 metres. Assay results for these holes will be
released when available.
"Management is extremely pleased by the consistency of grade and strong
results received to date and very encouraged by the enhanced prospects for the
Titan project going forward," said Mr Michael Opara, Randsburg President and
CEO.
The Titan Project is being conducted under the supervision of Ken
Germundson, Ph.D, Professional Geoscientist, the Company's Qualified Person
under the meaning of National Instrument 43-101. The drill logs, cores and
assay results have been reviewed and verified by Dr. Germundson. Dr.
Germundson has reviewed and approved the contents of this news release.
ABOUT RANDSBURG INTERNATIONAL GOLD CORPORATION
----------------------------------------------
Randsburg International Gold Corporation is a Canadian exploration
company listed on the TSX Venture Exchange (Symbol TSX-V:RGZ). The Company is
engaged in exploring for diamonds, titanium, iron, precious and base metals,
and platinum group metals (PGMs) in Brazil, Canada and Nevada. The Company has
three active exploration projects:
1. Victory Strike diamond project in Brazil - 85% owned
2. Titan Project (iron-titanium-vanadium) in Northern Ontario - 100%
owned
3. Elephant Gold and Silver Project, Nevada - 50% owned
To find out more about Randsburg International Gold Corporation
(TSX-V: RGZ), visit our website at www.randsburgdiamonds.com
Investor Relations:
For all Randsburg investor relations needs, investors are asked to visit
the Randsburg IR Hub at http://www.agoracom.com/IR/Randsburg where they can
post questions and receive answers within the same day, or simply review
questions and answers posted by other investors. Alternatively, investors are
able to e-mail all questions and correspondence to RGZ(at)agoracom.com where
they can also request addition to the investor e-mail list to receive all
future press releases and updates in real time.
FORWARD-LOOKING STATEMENTS: Except for statements of historical fact, all
statements in this news release - including, without limitation, statements
regarding forecasts, plans and objectives of Randsburg International Gold
Corp. - are forward-looking statements that involve various risks and
uncertainties. There can be no assurance that such statements will prove to be
accurate; actual results and future events could differ materially from those
anticipated in such statements.
The TSX Venture Exchange does not accept responsibility for the adequacy
or accuracy of this release.
Copyright, 2006 Randsburg International Gold Corporation. This news
release can be reproduced and retransmitted in whole, with no changes
permitted, and providing it is supplied and made available without charge to
the end reader.
>>
/C O R R E C T I O N from source - Randsburg International Gold Corporation/
Randsburg International Gold Corp on 6ix
Earlier from Randsburg International Gold
- Randsburg Announces Final 2005 Titan Drill Results Showing Large Intercepts of Iron/Titanium and Vanadium
- Randsburg Completes Private Placement For Gross Proceeds of $600,000
- Randsburg announces deep core drilling for diamonds to begin next week at Victory Strike, Brazil
- Randsburg Announces Titan Drill Results - 22 Metre Drill Intercept of 79.23%
- Randsburg announces over 70 aeromagnetic targets discovered on Victory Strike project in Brazil - 15 of 30 tested contain microdiamonds - substantially expands size of Victory Strike claim holdings - deep core drilling to commence January 2006
Later from Randsburg International Gold
- Randsburg announces discovery of two diamond-bearing kimberlites at Victory Strike - Dramatically expands size of claim holdings - Sulphides confirmed at Target Zelia447
- Randsburg announces 58 million tonne iron-titanium-vanadium preliminary resource estimate for Titan deposit
- Randsburg announces Elephant joint venture update
- Randsburg Announces Discovery of Another Diamond-Bearing Kimberlite at Victory Strike - Four Additional Kimberlites Discovered
- Randsburg announces site for mini-bulk plant at Victory Strike; Hard rock core processing set to begin
Follow Randsburg International Gold into a list and get an email when it puts out news.
Follow Randsburg International Gold