Breakaway Dam Follow-Up Targets Defined
Filed with ASX · · 7 pages · English
➢ 12-hole / ~3,160m RC drill program commencing at Breakaway Dam targeting a copper-rich VMS system supported by recent geophysical interpretation. ➢ Planned BDCRC26016 drillhole configured as a multi-plate test of high-priority DHEM conductors, to evaluate potential sulphide thickening within the central portions of the modelled plates. ➢ Drilling designed to test a ~700 m mineralised corridor wi
Catalina Resources Limited on 6ix
Earlier from Catalina Resources
- Central Yilgarn Drilling Supports Gold Mineralisation Model
- Breakaway Dam Follow Up Drilling to Commence
- Breakaway Dam and Evanston Project Updates
- Quarterly Activities/Appendix 5B Cash Flow Report
- Second Central Yilgarn RC Drilling Rig Commences Operations
Later from Catalina Resources
- Catalina Divests NBR and Strengthens Balance Sheet
- Catalina Advances Flamingo Cu Au Exploration Model
- Trading Halt
- 48m at 2.61g/t Au from 15m at Yerilgee WA
- RC Drilling Underway at Cu VMS Breakaway Dam
Follow Catalina Resources into a list and get an email when it puts out news.
Follow Catalina Resources