Aurora Tank - New assays yield results up to 34 g/t gold
Filed with ASX · · 17 pages · English
Marmota is very pleased to report 1m assay intervals from the 4m composite samples from the September 2016 drilling program at its 100%-owned Aurora Tank prospect. Initial 4m composite results were reported to the ASX on 25 October 2016. The new assay results based on 1m samples feature: • Significantly higher grades of up to 34 g/t gold over 1 metre (27m from surface) • Assays of over 1m at 1 g/t
In the deck
Story so far
Earlier from Marmota
- Gawler Craton Gold Project New Land Added
- September 2016 Quarterly Report
- Aurora Tank - Significant Gold Intersected
- Aurora Tank Gold Project Drilling Completed
- Aurora Tank Gold Project Drilling Commenced
Later from Marmota
- Aurora Tank Gold - Drilling Update
- Champion Copper - Drilling Program Access Granted
- Appointment of MD
- Aurora Tank More Significant Gold From Phase 2 Drilling
- Champion Copper - Program Commences
Follow Marmota into a list and get an email when it puts out news.
Follow Marmota