Aurora Tank - Diamond assays produce more high-grade gold
Filed with ASX · · 16 pages · English
(i) Geotechnical: design of optimal pit walls; (ii) Bulk density measurements: required for resource estimation and scoping/feasibility studies; (iii) Bulk samples to enable final phase metallurgical testing. In December 2021, detailed structural logging of the core was carried out, along with multiple geotechnical analyses, prior to core cutting and being sent for assaying. Assays have now arrive
Story so far
Earlier from Marmota
- Aurora Tank Gold - Drilling has commenced
- Aurora Tank Gold - Drillers have arrived
- Aurora Tank Gold - 2022 Drilling to Commence
- First BLEG analysis yields gold grades of 200 g/t
- Archive search reveals more than 40 untested gold anomalies
Later from Marmota
- Major Rare Earth discovery along MEU tenement boundary
- Response to ASX Price and Volume Query
- Aurora Tank Gold - Drilling program expanded
- Aurora Tank Gold - First Pit Wall Design
- Aurora Tank Gold - Drilling Completed
Follow Marmota into a list and get an email when it puts out news.
Follow Marmota