Toro Energy LimitedASX: TOE

Assays Grow Toros Dusty Nickel Footprint

· Issued by Toro Energy Limited

Filed with ASX · · 17 pages · English

• Toro is advancing two potential Tier-1 assets in WA – the Wiluna Uranium Project and the Dusty Nickel Project – both with considerable upside and unlocked value. • Geochemical assays confirm diamond drill hole TED55 intersected massive Nickel (Ni) sulphides at the Dimma Ni discovery within Toro’s 100% owned Dusty Nickel Project. o 2.1m of massive Ni-sulphide grading 1.83% Ni, 0.29% copper (Cu) a

Toro Energy Limited on 6ix

Earlier from Toro Energy

Later from Toro Energy

All Toro Energy news releases