SAGUENAY, QC, June 12, 2014 /CNW/ - Arianne Phosphate (the "Company" or "Arianne") (TSX VENTURE: DAN) (FRANKFURT: JE9N) (OTCBB: DRRSF), a development-stage phosphate company advancing the Lac à Paul Project in Quebec, is pleased to report that the latest results from its exploration drilling program, on the western extension of the Paul Zone, has met with success, extending the zone an additional 1.1 km along the strike.  When added to the previously defined Paul Zone (released 23 October 2012, with a strike length of 2.7 km), this latter is now recognised on a 3.8 km strike length. Further, the Company also completed its first stage of drilling at its TraMan Zone showing very promising initial results.

Based on the potential targets highlighted through an airborne magnetic survey, Arianne drill tested an area west of the current Paul Zone.  All drill holes intersected mineralization and numerous holes returning results of higher than 7% P2O5 (see table below), extending the Paul Zone an additional 1.1 km strike length.  As shown in the diagram(s) below, this western extension is directly adjacent to the Paul deposit which is currently capable of a 26 years life of mine, as defined in the Company's BFS (released 24 October 2013).  Arianne, over the coming weeks, will perform the required modelling work to more specifically estimate these new resources in the western extension of the Paul Zone.

"We are very pleased with the results from our winter 2014 drilling program" stated Brian Kenny, Chief Executive Officer of Arianne.  "These results, taken in conjunction with the earlier potential targets (see the press release of May 15, 2014) are certainly showing the capability to increase the size of the asset.  Given that the mineralised intersections are near-surface and continuous to the Paul Zone, we are confident that additional definition drilling should enable us to upgrade to a resource level and incorporate this into our projected mining plan. Already one of the largest green field phosphate deposits in the world, these results along with the initial drilling results on TraMan continue to move us towards our goal of finding additional phosphate mineralisation. Arianne's exploration works continue to show the district-sized scale of the asset. This is a positive finding in pursuing the development of our target to obtain a mineral resource to support mining operations for fifty (50) years."(1)

(1)The 50 years target is conceptual in nature, that there has been insufficient exploration to define a mineral resource to that size and that it is uncertain if further exploration will result in the target being delineated as a mineral resource. The 50 years target is based on 472 Mt in reserve and other resources on the project (released 24 October 2013) and the other potential targets (released 15 May 2014).

Paul Zone

The drilling program on the western extension of the Paul Zone, totalling 2 854 metres in 16 holes (PAU-14-154 to PAU-14-169), was designed to test the western extension on the Paul Zone and the aeromagnetic anomaly associated with this sector. A total of nine (9) sections spaced between 100 to 200 meters have been drilled on 1.1 km along the anomaly.

These are 1 020 samples (including QA/QC procedures) which were sent to ALS Chemex Inc. from Val d'Or to be analysed for major elements by the ME-XRF06 method. The table below shows the intersections obtained along the drill holes (true width are roughly 75 % of the intersection length) on the western extension of the Paul Zone, with all analytical results obtained. Overburden is around 3 vertical meters depth.

Drill Holes Intersections on western extension of Paul Zone

Drill HoleFrom (m)To(m)Length along the
drill hole (m.)
P2O5 (%)
PAU-14-1546.00117.00111.005.73
including69.00117.0048.007.44
and91.80117.0025.209.68
and138.00198.0060.004.89
including183.60198.0014.409.85
PAU-14-155102.00115.0013.006.39
and154.00173.4019.406.90
and202.80216.0013.205.75
and263.20288.3025.106.88
PAU-14-1569.3061.2051.908.75
PAU-14-1574.00142.30138.306.67
including49.40142.3092.908.03
PAU-14-15887.00232.20145.204.80
including120.10160.8040.705.41
including177.00232.2055.205.01
PAU-14-15966.00138.0072.004.18
including66.0090.0024.004.50
and128.00138.0010.006.40
PAU-14-16033.3563.2529.905.27
including33.3545.0011.657.64
PAU-14-1616.0098.6092.609.57
including36.0098.6062.6011.28
PAU-14-1626.3046.0039.708.26
PAU-14-16330.00134.00104.005.14
including102.70134.0031.309.19
PAU-14-16439.00180.40141.405.58
including96.00180.4084.406.77
including137.90180.4042.508.26
PAU-14-16542.00132.6090.605.47
including64.0093.0029.006.06
including115.40132.6017.206.13
PAU-14-16624.00106.9082.906.70
including69.80106.9037.109.46
PAU-14-1674.2081.0076.806.30
including46.5081.0034.507.80
PAU-14-1683.0069.2066.2010.20
PAU-14-169300101.8098.807.10
including34.8093.0058.208.36

Coordinates and technical data of the drill holes are shown in the table below. Note that the collars are not still accurately surveyed.

Coordinates & Technical Data of 2014 Drill Holes on western extension of Paul Zone

Drill HoleUTM_E
Nad 83
UTM_N
Nad 83
AzimuthDipLength
(m)
Number
of samples
Cross section /
Meterage (m)
PAU-14-1573733255529687340⁰- 45⁰22983S16W / 652
PAU-14-1583733215529532360⁰- 68⁰28586
PAU-14-1593733215529532360⁰- 45⁰13843
PAU-14-1543730985529612360⁰- 65⁰24098S18W / 669
PAU-14-1553731345529521360⁰- 65⁰300111
PAU-14-1563731285529733360⁰- 65⁰12951
PAU-14-1603729455529652360⁰- 55⁰21063S20W / 210
PAU-14-1693727265529721360⁰- 60⁰14155S22W / 141
PAU-14-1623726395529764360⁰- 60⁰9334S23W / 261
PAU-14-1633726205529687360⁰- 60⁰16867
PAU-14-1613725335529751360⁰- 60⁰13250S24W / 372
PAU-14-1643725315529678360⁰- 60⁰24079
PAU-14-1653724375529696360⁰- 60⁰16260S25W / 276
PAU-14-1683724405529783360⁰- 65⁰11444
PAU-14-1663723215529706360⁰- 60⁰16856S26W / 168
PAU-14-1673722225529738360⁰- 50⁰10540S27W / 105

TraMan Zone

The drilling program on TraMan Zone, totalling 4 165 metres in 18 holes (TRM-14-01 to TRM-14-18), was designed to test the aeromagnetic anomaly associated with this sector where surface grab samples gave significant results in P2O5. A total of seven (7) sections spaced between 200 to 400 meters have been drilled on 1.5 km along the anomaly. This sector is a continuity of the Traverse Zone (magnetic anomaly recognised over a 2 km length) where similar results were obtained by drilling (see press release of May 08, 2012).

These are 1 571 samples (including QA/QC procedures) which were sent to ALS Chemex Inc. from Val d'Or to be analysed for major elements by the ME-XRF06 method. The table below shows the intersections obtained along the holes drilled (true widths are roughly 75 % of the intersection lengths) on the TraMan Zone with all analytical results. Overburden is around 3 to 4 vertical meters depth.

Drill Holes Intersections on TraMan Zone

Drill HoleFrom (m)To(m)Length along the
drill hole (m.)
P2O5 (%)
TRM-14-01143.60225.6082.004.48
including154.00200.7046.705.04
TRM-14-026.0040.1034.105.05
and153.00172.4019.405.64
TRM-14-0364.80199.50134.705.00
TRM-14-0464.00104.0040.005.00
and124.70167.342.605.04
TRM-14-05121.00159.2038.206.53
and209.70233.2023.504.22
TRM-14-0629.0098.9069.907.26
including29.0076.7047.708.45
including65.5076.7011.2011.60
TRM-14-073.00125.90122.905.71
TRM-14-083.0085.8082.806.00
TRM-14-0965.10121.3056.204.84
including65.10110.945.805.30
and158.50176.6018.104.16
TRM-14-1039.00115.0076.005.72
and150.40187.5037.104.71
and219.00235.5016.505.78
TRM-14-1163.00105.1042.106.13
and127.10156.6029.504.92
and193.90216.0022.104.96
TRM-14-123.6037.2033.604.61
and114.50153.1038.604.55
and181.50195.0013.504.93
and208.20221.7013.503.81
TRM-14-134.6013.909.306.11
and27.0046.2019.204.98
and68.9098.3029.406.61
and107.60116.008.404.48
and169.20184.8015.605.13
and201.00251.5050.505.58
TRM-14-1434.7059.3024.605.48
and73.5093.3019.804.04
and101.90109.307.405.25
TRM-14-154.5070.4065.904.09
including5.2035.1029.905.49
TRM-14-1617.00101.2084.204.18
including17.0049.2032.205.18
and177.00197.0020.004.28
TRM-14-1746.80103.5056.704.77
and133.40162.9029.505.11
and174.00294.00120.005.23
TRM-14-183.0055.5052.505.54
and130.20155.7025.504.49

"We will be performing the required modelling on the results from the Traman zone to determine the size of this additional potential. Combined with the mineralised potential of the Traverse Zone (see press release of May 08, 2012 and table below), that is located just beside TraMan (see figure attached), this sector becomes very attractive for the Lac à Paul Project." stated Brian Kenny.

Coordinates and technical data of the drill holes are shown in the table below. Note that the collars are not still accurately surveyed.

Coordinates & Technical Data of Drill Holes on TraMan Zone

Drill HoleUTM_E
Nad 83
UTM_N
Nad 83
AzimuthDipLength
(m)
Number of
Samples
Cross Section /
Meterage (m)
TRM-14-013777415521745315⁰- 65⁰22691S6E / 667
TRM-14-023776265521909315⁰- 65⁰19875
TRM-14-033777005521808315⁰- 50⁰24396
TRM-14-043775555521680315⁰- 50⁰21076S4E / 618
TRM-14-053774745521763315⁰- 50⁰25580
TRM-14-063778195521341315⁰- 50⁰15360
TRM-14-073772085521429315⁰- 50⁰20784S0 BL / 573
TRM-14-083771735521511315⁰- 50⁰14460
TRM-14-093772945521393315⁰- 50⁰22286
TRM-14-103771205521284315⁰- 50⁰24099S2W / 411
TRM-14-183770445521339315⁰- 50⁰17164
TRM-14-113769435521122315⁰- 50⁰24496S4W / 493
TRM-14-123769115521201315⁰- 50⁰249103
TRM-14-133767615520922315⁰- 50⁰363137S7W / 884
TRM-14-143766465521051315⁰- 50⁰25588
TRM-14-153767295521015315⁰- 50⁰26674
TRM-14-163766755520703315⁰- 50⁰21985S9W / 519
TRM-14-173765475520856315⁰- 50⁰300117

Note that the interpretation of all results and drill sections of this drilling campaign will be done by Arianne and will assess the estimation of resource in these two sectors as soon as possible.

Traverse Zone

Drill Holes Intersections on Traverse Zone (2011)

Drill HoleFrom (m)To(m)Length along the
drill hole (m.)
P2O5 (%)
TRA-11-013.1094.9091.806.61
TRA-11-0266.90107.7040.806.72
TRA-11-033.40135.00131.604.90
including3.4045.0041.605.03
and49.8572.8022.955.51
and87.00131.0044.005.57
TRA-11-042.5046.4043.905.49
and100.10132.0031.904.87
TRA-11-053.20131.3128.105.12
including3.2067.1063.906.66
and90.30131.3041.005.46
TRA-11-063.80177.00173.206.39

Coordinates & Technical Data of Drill Holes on Traverse Zone

Drill HoleUTM_E
Nad 83
UTM_N Nad
83
ElevationAzimuthDipLength (m)Number of
samples
Cross section /
Meterage (m)
TRA-11-033746905520761454360-9013553S1 / 101
TRA-11-043746935520761454360-4513848
TRA-11-013748195520678443360-7019556S2 / 98
TRA-11-023748135520758449360-7014442
TRA-11-063750075520653440360-4517774S3 / 74
TRA-11-053751865520690454360-9016568S4 / 68

Mr. Daniel Boulianne, P.Geo., Qualified Person as per NI 43-101, has approved this press release.

About Arianne Phosphate

Arianne Phosphate ("Arianne Phosphate Inc.") (www.arianne-inc.com) is developing the Lac à Paul phosphate deposits located approximately 200 km north of the Saguenay/Lac St. Jean area of Quebec, Canada. These deposits will produce a high quality igneous apatite concentrate grading 38.6% P2O5 (released 24 October 2013) with little or no contaminants. The Company has 87.1 million shares outstanding.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Follow Arianne on:

Facebook: http://www.facebook.com/pages/Arianne-Resources-Inc/113071105425184
Twitter: http://twitter.com/arianne_dan
YouTube: http://www.youtube.com/user/ArianneResources
Flickr: http://www.flickr.com/photos/arianneresources
Resource Investing News: http://resourceinvestingnews.com/?s=Arianne

Forward Looking Statements and Information

This news release contains "forward-looking statements" and "forward-looking information" within the meaning of applicable securities regulations in Canada and the United States (collectively, "forward-looking information"). The forward-looking information contained in this news release is made as of the date of this news release. Except as required under applicable securities legislation, the Company does not intend, and does not assume any obligation, to update this forward-looking information. Forward-looking information includes, but is not limited to, statements with respect to estimated mineral resources, anticipated effect of the completed drill results on the Project, and timing and expectations of future work programs. Often, but not always, forward-looking information can be identified by the use of words such as "plans", "expects, "is expected", "budget", "scheduled", "estimates", forecasts", "intends", "anticipates", or "believes", or the negatives thereof or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might", or "will" be taken, occur or be achieved. Any forward-looking statement speaks only as of the date on which it is made and except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement.

SOURCE Arianne Phosphate Inc.

Photo_Asset_2

Photo_Asset_3

Image with caption: "Magnetic geophysical survey showing magnetic anomalies associated with mineralised zones. (CNW Group/Arianne Phosphate Inc.)". Image available at: http://photos.newswire.ca/images/download/20140612_C9661_PHOTO_EN_41338.jpg

Image with caption: "Location of the potential target and zones. Black dotted contours represent sectors of existing mineral resources. (CNW Group/Arianne Phosphate Inc.)". Image available at: http://photos.newswire.ca/images/download/20140612_C9661_PHOTO_EN_41339.jpg

Image with caption: "Magnetic geophysical survey showing magnetic anomalies associated to Traverse and TraMan Zones. (CNW Group/Arianne Phosphate Inc.)". Image available at: http://photos.newswire.ca/images/download/20140612_C9661_PHOTO_EN_41340.jpg

Contact Information:
Source: Brian Kenny, CEO Tel: 514-699-7436  [email protected]
Info:  Derek Lindsay, CFO Tel: 514-594-2372  [email protected]

Copyright CNW Group 2014

View original source (CNW)Arianne Phosphate Inc. on 6ix

Story so far

Earlier from Arianne Phosphate

Later from Arianne Phosphate

All Arianne Phosphate news releases