Approval Received for Pre-works & Trial Mining at San Jose
Filed with ASX · · 8 pages · English
• In keeping with the Mine Restart philosophy of seeking to leverage the advantages of a former producing asset and minimize capex, early works will seek to adapt the existing facilities and in-situ infrastructure required for larger scale mining with a focus on mine access, transportation, electrical installation, drainage and underground safety • Together with the already granted Mining Licences
Story so far
Earlier from Variscan Mines
- AGM Presentation
- Continuation of High Grade Zinc Drill Results at Udias Mine
- September Quarter Activities Report and Appendix 5B
- Further Tranche of $2.5M Placement Completes
- 3D Laser Survey Completed at Udias to Support Drilling
Later from Variscan Mines
- Response to ASX Price Query
- Convertible Loan Note Facility
- Quarterly Activities/Appendix 5B Cash Flow Report
- Status Update - Earn-in to Irish Zinc Assets
- Update on Earn-in & JV Agreement for Irish Zinc Assets
Follow Variscan Mines into a list and get an email when it puts out news.
Follow Variscan Mines