Announcement on the 168-Hour Trial Operation of Newly Constructed Coal Power Project
The abstract is for reference only. Please refer to the full text of the announcement on the very day.
Link of Full Text for Reference:
Filed with SSE · · 2 pages · Chinese
The projects include a two-unit facility in Jiangxi Province and another in Anhui Province, both transitioning to commercial operation after the trial.
Written in English by 6ix AI from the company’s Chinese-language filing. How 6ix writes summaries
On 6ix: 6ix.com/news/announcement-on-the-168-hour-trial-operation-of-newly-constructed-coal-power-project
Announcement on the 168-Hour Trial Operation of Newly Constructed Coal Power Project
The abstract is for reference only. Please refer to the full text of the announcement on the very day.
Link of Full Text for Reference:
China Coal Xinji Energy Co Ltd. on 6ix
Follow China Coal Xinji Energy into a list and get an email when it puts out news.
Follow China Coal Xinji Energy