Hawk Resources Limited has released a press release.
Alderan executes renegotiated option at Detroit Project
Filed with ASX ·
6ix hasn’t read this filing yet.
Story so far
Earlier from Hawk Resources
- High grade oxide gold mineralisation in all Drum drill holes
- AL8 drilling continues to intersect high-grade oxide gold
- Alderan successfully completes maiden drilling at Drum
- Alderan intersects 6.6m @ 2.5g/t Au at Drum
- AL8 drilling at Drum and Mizpah highlights upside potential
Later from Hawk Resources
- Rio Tinto commences Copper Gulch drilling at Frisco Project
- AL8 secures highly prospective area between Drum and Mizpah
- AL8 to advance Detroit Project drilling with $1.3M Placement
- AL8 commences drilling at Mizpah Oxide Gold Deposit
- Alderan completes drilling at Mizpah oxide gold deposit
Follow Hawk Resources into a list and get an email when it puts out news.
Follow Hawk Resources