Additional High Grade Results from Minim Martap Project
Filed with ASX · · 13 pages · English
Summary by 6ix AI
Canyon Resources Limited has released additional high-grade results from its ongoing drilling campaign at the Minim Martap Bauxite Project in Cameroon, indicating positive outcomes from the second batch of assays on the Beatrice Plateau. Drilling has revealed significant intersections with high alumina content and lower silica levels, with some holes showing mineralization depths greater than previous results. The company is awaiting further assay results from additional plateaux and plans to continue drilling throughout the year.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
Canyon Resources Limited on 6ix
Story so far
Earlier from Canyon Resources
- Revised Presentation
- Quarterly Activities Report
- High Grade Drill Results at Minim Martap
- LiDAR surveyidentifies new bauxite targets
- Rail Assessment Identifies Capacity for Minim Martap Bauxite
Later from Canyon Resources
- Cameroon Government advance Minim Martap rail link
- Further High Grade Results at Minim Martap
- Canyon Raises a Placement of $4.0 M
- Quarterly Cashflow and Activities Report
- Very high grade results from new southern bauxite plateau
Follow Canyon Resources into a list and get an email when it puts out news.
Follow Canyon Resources