Mitsubishi Heavy Industries, Ltd. · TSE:7011

Mitsubishi Heavy Industries — GHGT-9 9th International Conference on Greenhouse Gas Control Technology (November 2008)

20 slides from Mitsubishi Heavy Industries's conference presentation, Nov 17, 2008

  1. Slide 1: Current Status of MHI's CO2 Recovery Technology and Optimization with a PC Fired Power Plant

    Slide 1: Current Status of MHI's CO2 Recovery Technology and Optimization with a PC Fired Power Plant

    GHGT-9 9TH International Conference on Greenhouse Gas Control Technology Session 2B : Pilot Plant Experience Current Status of MHI’s CO2 Recovery Technology and Optimization of CO2 Recovery Plant with a PC Fired Power Plant TAKUYA HIRATA, Shinya Kishimoto, Masaki Iijima, Tsuyoshi Ohishi, Kazuo Higak

  2. Slide 2: Contents

    Slide 2: Contents

    CONTENTS 1. Introduction 2. MHI’s R&D and Commercial Achievements 3. MHI’s Long Term 10 t/d CO2 Capture Demonstration Tests from a Coal Fired Boiler 4. Phased Approach to Coal Commercialization 5. Process Improvements & Heat Integration 6. Conclusions 2

  3. Slide 3: Introduction

    Slide 3: Introduction

    1.Introduction A) CCS can significantly reduce emissions of atmospheric CO2 B) CCS allows for economic and sustainable energy generation (utilising domestic coal reserves) C) Reducing the energy penalty of the CO2 recovery process is essential – advanced heat & process integration is key D) Based on

  4. Slide 4: MHI's R&D Achievements

    Slide 4: MHI's R&D Achievements

    2. MHI’s R&D Achievements MHI, with Kansai Electric Power Co., has been involved in R&D of post combustion CO2 capture from fossil fuel-fired power stations since 1991 Evolution 2003 2006 2007 2008 1991 Development of Energy Minimizing Solvent / Process Improvement Coal Fired Flue Gas Application PI

  5. Slide 5: MHI's Commercial Achievements

    Slide 5: MHI's Commercial Achievements

    2. MHI’s Commercial Achievements 9 MHI has 4 commercially operating PCC plants and another 4 under construction (TOTAL of 8 plants up to 450 tpd) 9 MHI has gained considerable experience and know how of PCC for natural gas fired flue gas 9 The know how developed from the above will achieve large sca

  6. Slide 6: Demonstration Tests from a Coal Fired Boiler: Process Flow

    Slide 6: Demonstration Tests from a Coal Fired Boiler: Process Flow

    3. MHI’s Long Term 10 t/d CO2 Capture Demonstration Tests from a Coal Fired Boiler Process Flow for coal fired flue gas MHI Coal Fired Flue Gas Testing Flue Gas z Confirm long-term stable operation Outlet z Verification of the influences of the CO2 Purity 99.9 % impurities such as dust, SOx & NOx z

  7. Slide 7: Outline of the Demonstration Plant

    Slide 7: Outline of the Demonstration Plant

    3. MHI’s Long Term 10 t/d CO2 Capture Demonstration Tests from a Coal Fired Boiler Outline of the Demonstration Plant Plant Outline Solvent : KS-1 Capacity : 10 T/D Feed Gas : Coal Fired Boiler (14.1 v% CO2) Start-up : July 2006 Location : Nagasaki, Japan NOTE* Project funding support from RITE (50%

  8. Slide 8: Outline of the Demonstration Plant: Operation Time-line and Results

    Slide 8: Outline of the Demonstration Plant: Operation Time-line and Results

    3. MHI’s Long Term 10 t/d CO2 Capture Demonstration Tests from a Coal Fired Boiler Outline of the Demonstration Plant (1) Operation time-line (1) Jul 07 to Feb 08 = 4,028 hrs (2) 2008 = 1,000 hrs (3) Total = 5,028 hrs (2) Operation results (Availability 99%) Operation period of >5,000 hrs with stabl

  9. Slide 9: Efficiency and Capacity of CO2 Recovery

    Slide 9: Efficiency and Capacity of CO2 Recovery

    3. MHI’s Long Term 10 t/d CO2 Capture Demonstration Tests from a Coal Fired Boiler Efficiency and capacity of CO2 recovery (1) CO2 recovery efficiency > 90% (2) CO2 recovery capacity exceeded our expectations following >5,000hrs of demonstration operation 9

  10. Slide 10: Heat Consumption & Product Quality

    Slide 10: Heat Consumption & Product Quality

    3. MHI’s Long Term 10 t/d CO2 Capture Demonstration Tests from a Coal Fired Boiler Heat consumption & Product Quality Specific heat consumption required for CO2 Recovery Approx. 750 kcal/kg-CO2 (730-820 kcal/kg-CO2) ‹ Higher performance than that for natural-gas-fired boiler case ‹ Improved process

  11. Slide 11: Influence of Dust in the Flue Gas

    Slide 11: Influence of Dust in the Flue Gas

    3. MHI’s Long Term 10 t/d CO2 Capture Demonstration Tests from a Coal Fired Boiler Influence of dust in the flue gas z Flue Gas Cooler dust removal efficiency: 40 to 50% z Absorber dust removal efficiency: 40 to 60% z A filtration system maintains dust at low levels: =<10mg/kg z Influence of dust: n

  12. Slide 12: Influences of SOx & NOx

    Slide 12: Influences of SOx & NOx

    3. MHI’s Long Term 10 t/d CO2 Capture Demonstration Tests from a Coal Fired Boiler Influences of SOx & NOx (1) SOx z The SOx removal efficiency in deep FGD section: >=98% z Almost all of the SOx at the outlet of the flue gas cooler was accumulated in the solvent as heat-stable salts (HSS) z The HSS

  13. Slide 13: Solvent Loss

    Slide 13: Solvent Loss

    3. MHI’s Long Term 10 t/d CO2 Capture Demonstration Tests from a Coal Fired Boiler Solvent loss ‹Verification method Determine the level of solvent loss via analysis of the solvent content throughout test period ‹Test result z The recorded solvent loss was close to the expected value z Confirmation

  14. Slide 14: Conclusion

    Slide 14: Conclusion

    3. MHI’s Long Term 10 t/d CO2 Capture Demonstration Tests from a Coal Fired Boiler Conclusion ‹The demonstration operation of > 5,000 hrs was achieved at a commercial coal-fired power station in southern Japan ‹The respective behavior and impact of dust, SOx and NOx on the PCC process were confirmed

  15. Slide 15: Phased Approach to Commercialization for Coal Application

    Slide 15: Phased Approach to Commercialization for Coal Application

    4. Phased approach to commercialization for Coal application Next Step (1) Experience at larger scale with coal fired flue gas PCC Demo (2) Improved integration of the CO2 recovery system EU/US with the flue gas pre-treatment components (3) Optimisation of removal methods for impurities accumulating

  16. Slide 16: MHI's Experience and Capability in a CCS Project

    Slide 16: MHI's Experience and Capability in a CCS Project

    5. Process Improvements & Heat Integration MHI’s Experience and Capability in a CCS Project Steam Turbine CO2 CO2 CO2 Boiler SCR EP FGD Capture Compression Transport NOx Dust SOx CO2 ‹Centrifugal Compressors ‹Coal Fired Power Station ‹FGD ‹CO2 Capture Plant ABSORBER S T R IP P E R COOLER DCFS MHI Fu

  17. Slide 17: Energy Saving Process + Heat Integration 3 Concepts

    Slide 17: Energy Saving Process + Heat Integration 3 Concepts

    5. Process Improvements & Heat Integration Energy Saving Process + Heat Integration 3 Concepts LP-2 Turbine LP-1 HP-IP Turbine Turbine Heat Stack Extractor Boiler EP FGD Condenser *A AH Regenerator Reboiler Condenser *B Dea Heat Integration 1 CO2 Compressor CP GC LP Heater HP Heater Inter-cooler by

  18. Slide 18: MHI Heat Integration Study Result

    Slide 18: MHI Heat Integration Study Result

    5. Process Improvements & Heat Integration MHI Heat Integration Study Result (1) The net loss reduced to ~22% of the gross output by the addition of PCC (2) With additional heat integration we can decrease the total energy penalty to ~20% of the gross output Gross output :1,070MW Fuel :Bituminous Po

  19. Slide 19: Conclusions

    Slide 19: Conclusions

    6. Conclusions A) MHI has an extensive PCC R&D History - >18 years B) MHI has multiple commercial delivery of PCC plants (up to 450 t/d scale) C) CO2 capture was successfully demonstrated on coal fired flue gas using a 10 t/d test plant located in southern Japan D) Medium scale demonstration of PCC

  20. Slide 20: Thank You

    Slide 20: Thank You

    THANK YOU COME AND MEET THE MHI TEAM AT THE Technology Exhibit in BOOTH 20 Poster Presentation A 17 Nov.17 16:30 – 17:30 and Nov.18 07:30 – 08:30 Calculation method for predicting thermal energy required for CO2 Recovery by Y.Yagi Kansai Electric Power Co. 20