Pepco Holdings Inc

Pepco — Barclays Capital CEO Energy-Power Conference 2010

23 slides from Pepco's conference presentation, Sep 14, 2010

  1. Slide 1: Barclays Capital CEO Energy-Power Conference

    Slide 1: Barclays Capital CEO Energy-Power Conference

    Barclays Capital CEO Energy-Power Conference NEW YORK • SEPTEMBER 15 – 16, 2010

  2. Slide 2: Safe Harbor Statement

    Slide 2: Safe Harbor Statement

    Safe Harbor Statement Some of the statements contained in today’s presentation are forward-looking statements within the meaning of Section 21E of the Securities Exchange Act of 1934, as amended, and are subject to the safe harbor created by the Private Securities Litigation Reform Act of 1995. Thes

  3. Slide 3: PHI's Strategic Repositioning

    Slide 3: PHI's Strategic Repositioning

    PHI’s Strategic Repositioning • We have been repositioning PHI over the last year Forecast Business Mix Based on – Wind-down of retail energy 2011-2014 Projected Operating Income supply business at Pepco Energy Services – Completed sale of Conectiv Energy’s wholesale power generation business 5 - 10

  4. Slide 4: PHI's Strategic Focus

    Slide 4: PHI's Strategic Focus

    PHI’s Strategic Focus Power Delivery • Invest in T&D infrastructure • Implement Blueprint for the Future – AMI, energy efficiency, demand response, decoupling • Achieve constructive regulatory outcomes • Increase operational excellence Pepco Energy Services • Build profitable market share in the ene

  5. Slide 5: Power Delivery Business Outlook

    Slide 5: Power Delivery Business Outlook

    Power Delivery Business Outlook • Over $5.4 billion in planned infrastructure investment over next 5 years • Accelerated smart grid deployment backed by $168 million in stimulus grants • Revenue growth through continued modest, long-term growth in the number of customers – comparatively strong, resi

  6. Slide 6: Power Delivery – The Driver of Growth

    Slide 6: Power Delivery – The Driver of Growth

    Power Delivery – The Driver of Growth Projected Year-End Rate Base $10,000 $8,563 ( 2009-2014) AGR $7,858 $8,000 12.4% C $7,050 $3,196 $6,123 $2,884 $6,000 $5,357 $2,390 $4,765 Millions $1,799 $252 $1,382 $249 $4,000 $1,122 $237 $243 $226 $218 $5,115 $4,725 $4,417 $2,000 $3,749 $4,087 $3,425 $0 2009

  7. Slide 7: MAPP – Project Update

    Slide 7: MAPP – Project Update

    MAPP – Project Update PJM • PJM is finalizing its 2010 RTEP process • Analyses show significant violations of reliability criteria in MAAC and EMAAC in 2015, requiring additional transmission capability be put in place • Letter from PJM to PHI identified MAPP as the preferred solution; directed PHI

  8. Slide 8: Blueprint for the Future

    Slide 8: Blueprint for the Future

    Blueprint for the Future Combines smart grid technology with energy efficiency programs to help customers control their energy use and cost, while providing earnings potential for the Company • Advanced Metering Infrastructure – Meter installation underway in DE (165,000 meters installed through Aug

  9. Slide 9: Distribution Rate Cases – Most Recent Decisions

    Slide 9: Distribution Rate Cases – Most Recent Decisions

    Distribution Rate Cases – Most Recent Decisions Pepco Maryland Electric Rate Case ACE New Jersey Electric Rate Case (Millions of Dollars) Final Position Approved Final Position Approved Date 5/21/10* 8/6/10 2/19/10 5/12/10 Rate Base $924.1 $906.0 $808.8 $761.6 Equity Ratio 48.73% 48.87% 49.58% 49.10

  10. Slide 10: Distribution Rate Cases – Most Recent Decisions (continued)

    Slide 10: Distribution Rate Cases – Most Recent Decisions (continued)

    Distribution Rate Cases – Most Recent Decisions (continued) DPL Maryland Electric Rate Case Pepco DC Electric Rate Case (Millions of Dollars) Final Position Approved Final Position Approved(2) (1) (1) Date 11/4/09 12/2/09 12/9/09 3/2/10 Rate Base $311.8 $306.4 $1,020.0 $1,010.3 Equity Ratio 49.87% 4

  11. Slide 11: Distribution Rate Cases – Current Filed Positions

    Slide 11: Distribution Rate Cases – Current Filed Positions

    Distribution Rate Cases – Current Filed Positions DPL – DE Electric DPL - DE Gas (Millions of Dollars) Date of Most Recent Position 6/22/10 7/2/10 12 mos. actual ended 6 mos. actual, 6 mos. Test Period 3/31/09 forecasted ended 6/30/10 Rate Base $460.9 $254.1 Equity Ratio 47.52% 48.80% Return on Equi

  12. Slide 12: PES Overview

    Slide 12: PES Overview

    PES Overview • PES provides retail energy services to large customers – Government – Commercial and Industrial – Institutional • Energy Services – PES develops, installs, operates, and maintains energy efficiency, renewable energy, and combined heat and power projects • Energy Supply – PES is in the

  13. Slide 13: Wind-down of Retail Electric and Natural Gas Supply and Power Plants

    Slide 13: Wind-down of Retail Electric and Natural Gas Supply and Power Plants

    Wind-down of Retail Electric and Natural Gas Supply and Power Plants • PES is on track in winding down this Key Metrics 6/2010 YTD 2009 2008 business and the retail supply contracts Load Served - MW 2,389 3,195 4,388 completely roll off by 2014 MWh Delivered* 6.4 17.8 20.1 Dths Delivered* 28.5 45.8

  14. Slide 14: Energy Services Overview

    Slide 14: Energy Services Overview

    Energy Services Overview • Energy Efficiency – PES is a leading developer of energy efficiency projects – Since 1995, completed $850 million of energy efficiency projects • Combined Heat and Power/ Thermal (CHP) – PES develops, operates, and maintains central heating and cooling plants • 70,000 tons

  15. Slide 15: Growing Energy Services

    Slide 15: Growing Energy Services

    Growing Energy Services 2008 North American Market Share Energy Performance Contracting • PES has an established track record and was ranked #10 in a 2008 survey with a Johnson 3% market share of the energy performance Others Controls 17% 23% contracting market PES 3% – PES approximates its market s

  16. Slide 16: Recently Signed Energy Efficiency Contract

    Slide 16: Recently Signed Energy Efficiency Contract

    Recently Signed Energy Efficiency Contract • PES signs $35 million energy efficiency contract with Prince George’s County Public Schools • Services – New energy infrastructure (heating/cooling) – Lighting/building improvements – Energy controls/renewable energy systems – 103 county school system fac

  17. Slide 17: Conectiv Energy – Asset Sale Completion

    Slide 17: Conectiv Energy – Asset Sale Completion

    Conectiv Energy – Asset Sale Completion • Sale of wholesale power generation business completed on July 1, 2010 • Proceeds of $1.63 billion (after adjustments) used to pay down PHI debt • Liquidation of Conectiv Energy’s contracts and remaining assets underway; expected completion by year-end 2010 •

  18. Slide 18: Conectiv Energy – Use of Asset Sale Proceeds

    Slide 18: Conectiv Energy – Use of Asset Sale Proceeds

    Conectiv Energy – Use of Asset Sale Proceeds • Applied proceeds from Conectiv Energy sale to debt reduction – Paid off $450 million bridge financing put in place to fund • $200 million of 4% Notes due May 2010 • $250 million of Floating Rate Notes due June 2010 – Tendered/called $944 million of long

  19. Slide 19: POM Investment Case

    Slide 19: POM Investment Case

    POM Investment Case • Robust T&D growth – over $5 billion planned investment, 42% in transmission • Smart grid underway – aided by $168 million in stimulus funds • Reasonable regulatory outlook – including FERC formula rates • No equity issuance needs until at least 2012 • Commitment to the current

  20. Slide 20: Appendix

    Slide 20: Appendix

    ZPHI Pepco Holdings Inc Appendix

  21. Slide 21: Sales and Customer Growth

    Slide 21: Sales and Customer Growth

    Sales and Customer Growth Sales (GWh)* Forecasted Annual Average Growth Sales Customer 2009 2010 2009-2010 2009-2014 2009-2010 2009-2014 Pepco 26,530 26,930 1.5% 1.5% 1.0% 0.9% Delmarva Power 12,515 12,508 -0.1% 0.6% 0.9% 1.2% Atlantic City Electric 9,738 9,839 1.0% 1.0% 0.9% 1.0% Total Power Delive

  22. Slide 22: Blueprint for the Future Costs

    Slide 22: Blueprint for the Future Costs

    Blueprint for the Future Costs Construction Costs (Millions of Dollars) 2008A 2009A 2010 2011 2012 2013 2014 Total Advanced Metering Infrastructure (AMI) Atlantic City Electric(1) $ - $ - $ - $ - $ - $ 8 $ 92 $ 100 Delmarva Power (1) - 12 49 18 40 - - 119 Pepco(1) - - 43 89 19 - - 151 AMI System Imp

  23. Slide 23: Construction Expenditures

    Slide 23: Construction Expenditures

    Construction Expenditures* $1,400 $1,229 $1,232 $1,198 $17 $4 $1,200 $1,100 $8 $4 $42 $92 $11 $70 $1,000 $625 $754 $608 $800 Millions $16 $648 $538 $90 $600 $445 $297 $400 $317 $246 $246 $200 $24 $245 $298 $235 $208 $179 $0 2010 2011 2012 2013 2014 Transmission MAPP Distribution Blueprint PES/Other

Source: SEC EDGAR · 8-K filed Sep 14, 2010

More decks from Pepco Holdings Inc