Pepco Holdings Inc

Pepco — Investor Day (March 2014)

109 slides from Pepco's investor day presentation, Mar 21, 2014

  1. Slide 1: 2014 Analyst Conference: Well Positioned to Deliver Value

    2014 Analyst Conference Well Positioned to Deliver Value March 21, 2014 New York, NY Exhibit 99

  2. Slide 2: Safe Harbor Statement/Regulation G Information

    Safe Harbor Statement/Regulation G Information Some of the statements contained in today’s presentation with respect to Pepco Holdings, Pepco, Delmarva Power and Atlantic C ity Electric, including each of their respective subsidiaries, are forward - looking statements within the meaning of the U.S.

  3. Slide 3: Today's Agenda

    Today’s Agenda ▪ Opening Remarks Fred Boyle ▪ Strategic Overview Joe Rigby ▪ Power Delivery Overview Dave Velazquez ▪ Regulatory Overview Kevin McGowan ▪ Pepco Energy Services Overview John Huffman ▪ Financial Overview Fred Boyle ▪ Closing Remarks Joe Rigby

  4. Slide 4: Strategic Overview

    Strategic Overview Joe Rigby, Chairman, President & Chief Executive Officer

  5. Slide 5: PHI Overview

    Pepco Delmarva Power Atlantic City Electric Pepco Energy Services PHI Overview ▪ Invest in T&D infrastructure ▪ Achieve operational excellence, focused on reliability and exceeding customer expectations ▪ Operationalize and enhance the Smart Grid ▪ Achieve reasonable regulatory outcomes ▪ Enable new

  6. Slide 6: Accomplishments Since Our Last Analyst Conference

    Accomplishments Since Our Last Analyst Conference ▪ Continued improvement in reliability, storm restoration and customer satisfaction ▪ Progress made in reducing regulatory lag, but still more work ahead; PHI estimated weighted average distribution ROE of 7.00% versus 4.39% presented last year ▪ Inn

  7. Slide 7: 2014 Objectives

    2014 Objectives Continue to Improve the Customer Experience Deliver Value to Customers and Investors with Emerging Technologies and Services Grow Earnings and Achieve Above Average Total Return Achieve Regulatory Outcomes that Improve Earned Returns ▪ Exceed customer expectations ▪ Invest $1.3 billi

  8. Slide 8: Strong T&D Infrastructure Growth

    $0 $2 $4 $6 $8 $10 $12 $14 (Billions of Dollars) 21% 79% 25% 75% 23% 77% 23% 77% $7.0 $6.1 ($3.2) $9.9 2013 Rate Base Estimate Plant Placed In Service Depreciation/ Other 2018 Rate Base Projection Rate base expected to increase ~40 % by 2018 Strong T&D Infrastructure Growth ■ Transmission ■ Distribu

  9. Slide 9: PHI – Well Positioned to Deliver Value

    PHI – Well Positioned to Deliver Value Strategic progress • Exit of the generation and retail energy supply businesses has positioned PHI to focus on the stable Power Delivery business • Utility infrastructure investments have driven improved reliability and customer satisfaction and higher earnings

  10. Slide 10: Power Delivery Overview

    Power Delivery Overview Dave Velazquez, Executive Vice President, Power Delivery

  11. Slide 11: Power Delivery – Overview

    Operating Company Service Customers GWh Bcf Service Area Population Electric 801,000 25,801 N/A 640 square miles - District of Columbia, major portions of Prince George's and Montgomery Counties in Maryland 2.2 Million Electric 506,000 12,465 N/A 5,000 square miles - Delmarva Peninsula 1.4 Million G

  12. Slide 12: Power Delivery 2013 Progress

    Reliability ▪ Duration and frequency of outages have decreased by 30% and 20%, respectively since 2010 ▪ Exceeded reliability standards in all jurisdictions except Delmarva Power – Maryland ▪ Created Chief Information Security Officer (CISO) position, increased focus and drills on cybersecurity and

  13. Slide 13: 2014 Focus – Continuing to Build on 2013 Progress

    ▪ Improving reliability and customer service ▪ Investing in transmission and distribution infrastructure ▪ Implementing Smart Grid • Complete the activation of smart meters in Delmarva Power – Maryland • Continue wide - spread roll - out of dynamic pricing ▪ Preparing for the conversion of our legac

  14. Slide 14: Customer Satisfaction Improvements

    ▪ Overall satisfaction has increased at all 3 utilities since 2011; PHI’s customer satisfaction score has increased 7 percentage points since fall 2011* ▪ Of the key drivers for customer satisfaction, reliability and restoration performance are the most important; customer satisfaction in these area

  15. Slide 15: 2013 Reliability Performance

    2013 Reliability Performance (1 ) Regulatory Jurisdiction SAIFI (3) Component SAIDI (4) ( or CAIDI (5) ) Component 2013 State Mandate 2013 Actual Performance (2) 2013 State Mandate 2013 Actual Performance (2) Atlantic City Electric – NJ 1.71 1.45 15% 144* 93* 35% Delmarva Power – MD 1.65 1.92 ( 17%)

  16. Slide 16: Reliability Performance - Pepco – Maryland

    Reliability Performance - Pepco – Maryland Jurisdiction In 2012, the Maryland PSC Rule Making (RM) 43, “Reliability and Service Quality Standards,” established reliability standards which the electric utilities are required to meet. Code of Maryland Regulations (COMAR) defines which major events are

  17. Slide 17: Sales and Customer Growth

    Note: See Appendix for detailed sales and customer growth forecasts Sales and Customer Growth Note: See Safe Harbor Statement at the beginning of today’s presentations. 2012 2013 2014 2013 - 2014 2014 - 2018 2013 - 2014 2014 - 2018 Actual* Actual* Projected Pepco 26,021 25,822 25,964 0.6% 0.3% 1.1%

  18. Slide 18: Power Delivery Sales – 2012 vs. 2013

    4,300 5,121 7,780 4,200 5,114 7,829 4,219 5,222 18,080 4,143 5,080 17,830 2,339 0 861 830 2,192 0 0 5000 10000 15000 20000 Residential Commercial Industrial ACE Residential Commercial Industrial DPL Residential Commercial Industrial Pepco GWh* 2012 Actual* 2013 Actual* Change in Sales* (PD) Resident

  19. Slide 19: Near-Term Economic Outlook

    Atlantic City Electric ▪ Slower recovery; lagging national trends ▪ Atlantic City casinos continue to see declining revenues; the Atlantic Club Casino Hotel closed January 2014 Delmarva Power ▪ Moody’s Analytics lists Delaware as the only state not in either “recovery or expansion phase of the busin

  20. Slide 20: Operation and Maintenance (O&M) Expense

    Operation and Maintenance (O&M) Expense * Includes various items that are customer reimbursed or recoverable through rates in the same year, including costs associated with default electricity supply, customer reimbursed service work, claims, Atlantic City Electric bad debt expense, and regulatory c

  21. Slide 21: 2013 Operation and Maintenance Expense

    Customer Care 23% Reimbursable/ Recoverable 11% Administration & Support 25% Tree Trimming 6% 0 Maintenance 10% 0 Operations 25% 2013 Operation and Maintenance Expense (Millions of Dollars) 2013 Actual Operations 221$ Customer Care 204 Maintenance 89 Tree Trimming 50 Administration & Support 212 Rei

  22. Slide 22: Forecast Construction Expenditures – 2014-2018

    Notes: See Appendix for detailed construction forecast Amounts shown exclude expenditures anticipated for the District of Columbia Undergrounding program Distribution $ 3,797 Other $670 $ 1,290 $ 1,127 $ 1,158 $ 1,108 $ 1,131 (Millions of Dollars) Total = $ 5,814 ■ Distribution & Other ■ Transmissio

  23. Slide 23: Distribution Construction Expenditures – 2014-2018

    (Millions of Dollars) ▪ Reliability and Aging Infrastructure $2,339M – investment to meet reliability standards and proactively renew aging infrastructure ▪ Customer driven work $682M – new service connections, meter installs, etc. ▪ Load growth $704M – 17 new substations planned ▪ Advanced Metering

  24. Slide 24: Smart Grid – Customer Benefits

    Smart Grid – Customer Benefits (In Service/Pilot) Customer ▪ Peak Energy Savings Credits (Dynamic Pricing) ▪ Energy Wise Rewards (Direct Load Control ) ▪ Web - based Thermostat Control ▪ Energy Efficiency Programs ▪ Web presentment of Daily & Hourly U sage ▪ Green Button ▪ Home Energy Reports ▪ In H

  25. Slide 25: Smart Grid – Next Steps for Customers

    Smart Grid – Next Steps for Customers ▪ Notify customers when their bill (consumption) reaches a predefined limit ▪ Notify customers when their power is out and when it is restored ▪ Provide customers with real time consumption information to encourage behavior change (field trial under way) ▪ Enabl

  26. Slide 26: Smart Grid – Next Steps for Operations

    Smart Grid – Next Steps for Operations ▪ Processing outage and restore notifications from smart meters (in use) • Continue to realize operational savings from avoided “truck rolls” ▪ Conservation Voltage Reduction (under way) • Using smart meter data, we can lower voltage without violating operating

  27. Slide 27: Renewable Energy Interconnection

    ▪ S uccessfully interconnected over 9,800 customer renewable energy systems ( 192 MW); another 2,350 ( 107 MW) are in process ▪ The number of these customers has been steadily growing; customers grew 36% in 2013 over 2012 ▪ W orking on an advanced modeling program to rapidly provide the studies nece

  28. Slide 28: Electric Grid Delivers Value to Our Customers

    Electric Grid Delivers Value to Our Customers 24 by 7 Electricity Startup Power Grid Supplied Power Voltage Quality Source: Electric Power Research Institute (EPRI) 18

  29. Slide 29: Other Significant Construction Expenditures – 2014-2018

    Other $670 Category Expenditure Activity Communications $206 Replacement and installation of new radio towers, radio spectrum and equipment for broadband wireless, simulcast radio upgrades Facilities $150 Construction of new operating centers, upgrades and enhancements to existing facilities Gas Del

  30. Slide 30: Transmission Construction Expenditures – 2014-2018

    Transmission $ 1,340 Transmission $1,408 Distribution $ 3,735 Other $671 ACE $476 DPL $537 Pepco $395 Transmission Construction Expenditures – 2014 - 2018 Note: See Safe Harbor Statement at the beginning of today’s presentations. 2014 - 2018 Forecast Customer Driven 28$ Reliability 633 Load 244 PJM

  31. Slide 31: Construction Expenditures – Planned and Potential Additions

    Project Timeframe Status Anticipated Cost Recovery Cost District of Columbia Undergrounding Program 2015 – 2021 Legislation Signed Surcharge $500M* NJ Grid Resiliency Program 2014 – 2020 Proposal Presented Surcharge $600 - $800M Artificial Island Transmission Project 2014 – 2020 Under Consideration

  32. Slide 32: Pepco Undergrounding Status – District of Columbia

    Pepco Undergrounding Status – District of Columbia ▪ On March 3, 2014, the Mayor of the District of Columbia signed into law the $1 billion undergrounding legislation initially recommended by the District of Columbia’s Power Line Undergrounding Task Force ▪ The legislation is expected to become law

  33. Slide 33: Power Delivery Outlook

    Note: See Safe Harbor Statement at the beginning of today’s presentations. Power Delivery Outlook Providing value to our customers will result in increased value to our investors ▪ Continued improvement in operating performance – safety, reliability and storm response ▪ Leveraging technology to enha

  34. Slide 34: Power Delivery Overview

    Power Delivery Overview Dave Velazquez, Executive Vice President, Power Delivery

  35. Slide 35: Appendix

    Appendix

  36. Slide 36: Construction Expenditure Forecast Detail

    (Millions of Dollars) 2014 2015 2016 2017 2018 Total Distribution: Customer Driven (new service connections, 129$ 129$ 143$ 145$ 136$ 682$ meter installations, highway relocations) Reliability and Aging Infrastructure 502 467 451 450 469 2,339 (facility replacements/upgrades for system reliability)

  37. Slide 37: Construction Expenditures by Utility

    Note: See Safe Harbor Statement at the beginning of today’s presentations. (Millions of Dollars) 2014 2015 2016 2017 2018 Total Potomac Electric Power Company Distribution 505$ 480$ 481$ 442$ 465$ 2,373$ Distribution – Advanced Metering - - - - - - Transmission 113 74 43 74 91 395 Other 91 54 36 29

  38. Slide 38: Forecast Construction Comparison

    (Millions of Dollars) 2014 2015 2016 2017 2018 November 2012 1,210$ 1,194$ 1,111$ 1,186$ N/A November 2013 1,290 1,127 1,158 1,108 1,131$ Change 80$ (67)$ 47$ (78)$ N/A (157)$ 70 (52) 49 72 (18)$ Other, net (2) Total Key Drivers of Change in Power Delivery Capital Forecast 2014 - 2017 Distribution -

  39. Slide 39: Demand Response and Energy Efficiency Cost Forecast

    (Millions of Dollars) 2014 2015 2016 2017 2018 Total Pepco - District of Columbia 3$ 5$ 3$ 4$ 4$ 19$ Pepco - Maryland 128 94 82 82 82 468 Delmarva Power - Delaware 12 33 30 31 30 136 Delmarva Power - Maryland 51 32 27 27 28 165 Atlantic City Electric 5 4 4 4 4 21 Total 199$ 168$ 146$ 148$ 148$ 809$

  40. Slide 40: Electric Distribution Projected Sales

    Note: See Safe Harbor Statement at the beginning of today’s presentations. * Weather normalized Electric Distribution Projected Sales (Sales in GWh) 2012 2013 2014 2015 2016 2017 2018 Actual* Actual* Projected Projected Projected Projected Projected Potomac Electric Power Company Residential 7,780 7

  41. Slide 41: Residential Electric Distribution Projected Customers

    * End - of - period amounts Note: See Safe Harbor Statement at the beginning of today’s presentations. Residential Electric Distribution Projected Customers 2012 2013 2014 2015 2016 2017 2018 Actual Actual Projected Projected Projected Projected Projected Pepco Residential 719,820 727,001 735,724 74

  42. Slide 42: Power Delivery Electric Customer Analysis

    Power Delivery Electric Customer Analysis By Jjdududududu (Thousands) December 2013 December 2012 Change % Change from Prior Year Pepco 801 793 8 1.0% District of Columbia 264 260 4 1.5% Maryland 537 533 4 0.7% Delmarva Power 506 503 3 0.6% Delaware 305 303 2 0.7% Maryland 201 200 1 0.5% Atlantic Ci

  43. Slide 43: Artificial Island Transmission Project

    Artificial Island Transmission Project ▪ On April 29 th , PJM issued a Request for Proposals that would mitigate reliability and operational performance issues associated with the nuclear units at Artificial Island (near Salem, New Jersey) ▪ PHI submitted a joint proposal with Exelon to extend a tra

  44. Slide 44: Dominion Transmission Zone Project

    Dominion Transmission Zone (Glebe Road – Potomac River Station Project) ▪ We submitted a project to PJM for an interconnection with Dominion Virginia Power at their Glebe Road site ▪ Project has been included in the 2013 Regional Transmission Expansion Plan (RTEP) and was approved by the PJM Board o

  45. Slide 45: 2013 Financial Performance – Power Delivery

    2012 GAAP Dist Rate Increases O&M Reductions Transmission Revenue Distribution Revenue Weather Miscellaneous Distribution Revenue Tax Adjustment SOS Margin Interest Expense Other Net Depreciation & Amortization Dilution 2013 GAAP Earnings Per Share $1.02 ( $0.05) ( $0.03) ( $0.03) ( $0.02) $ 0.02 $

  46. Slide 46: Regulatory Overview

    Regulatory Overview Kevin McGowan, Vice President, Regulatory Affairs

  47. Slide 47: Executing Our Regulatory Strategy

    ▪ Timely recovery of incremental capex • GRC in MD • DC Undergrounding ▪ Multi - year Rate Plan Proposal in DE ▪ Engaging regulatory community ▪ Net Energy Metering ▪ Microgrid & Distributive Generation ▪ Renewable Energy ▪ Rate design ▪ Post - test period reliability plant additions ▪ CTA Generic P

  48. Slide 48: Regulatory Progress in 2013

    ▪ Progress made in reducing regulatory lag, but still more work ahead • Concluded four of six distribution base rate cases filed in 2013 • Approved distribution rate increases in 2012 and 2013 drove earnings higher by $0.28 per share in 2013 versus 2012 • Improved estimated weighted average distribu

  49. Slide 49: Regulatory Focus for 2014

    ▪ Timely recovery of investments and improvement in earned ROEs • File and manage new rate cases in most jurisdictions • Proposals for post - test period capital and operations and maintenance expenditures ▪ Continue to pursue alternative approaches for timely cost recovery • Multi - year rate plan

  50. Slide 50: Regulatory Environment

    Transmission MD 28% DC 20% NJ 17% DE 14 % FERC 21% Regulatory Environment Percentage of 2013 Year End Rate Base Note: See Safe Harbor Statement at the beginning of today’s presentations. Leveraging Our Strengths Addressing Our Challenges ▪ Regulatory diversity ▪ Improved overall tone ▪ Formula trans

  51. Slide 51: Rate Base Summary

    Rate Base Summary Pepco - Electric 40% Delmarva - Electric 18% Delmarva - Gas 4% Atlantic City - Electric 17% Series1 8% Series1 7% Series1 6% 2013 Estimated Year - End Rate Base by Company Distribution Pepco - Electric, $1,912 40% Distribution Delmarva - Gas, $231 4% Pepco 8% Delmarva Power 7% Atla

  52. Slide 52: Regulatory Distribution Returns on Equity

    Regulatory Distribution Returns on Equity Company/Jurisdiction 12 Month Measurement Period Estimated Rate Base (Millions of Dollars) 2013 Estimated Per Books ROE Authorized ROE 2012 (1) Estimated Per Books ROE Pepco – MD 9/30/13 (Avg. Rate Base) $1,278 7.50% 9.36% 5.24% Pepco – DC 12/31/13 (Avg. Rat

  53. Slide 53: Regulatory Schedule

    Regulatory Schedule Note: See Safe Harbor Statement at the beginning of today’s presentations. Q1 2014 Q2 2014 Q3 2014 Q4 2014 Pepco Distribution Rates - DC Delmarva Power Distribution Rates - DE Atlantic City Electric Distribution Rates - NJ Pepco Distribution Rates - MD Delmarva Power Distribution

  54. Slide 54: Pending Distribution Rate Cases – Summary

    Pending Distribution Rate Cases – Summary Company/Jurisdiction Requested Revenue Requirement Increase (1) Requested Return on Equity (ROE) Filing Date Timing of Decision Pepco – DC $44.8 10.25% 3/8/13 Q1 - 2014 DPL – DE Electric $39.0 (2) 10.25% 3/22/13 April 2014 Pepco – MD $43.3 10.25% 12/4/13 Jul

  55. Slide 55: Pending Rate Case – Pepco District of Columbia

    Distribution Rate Cases – Pending Pepco – District of Columbia Note: See Safe Harbor Statement at the beginning of today’s presentations. Rate Case Request FC Case No. 1103 Initial Filing Date 3/8/13 Test Year January 2012 – December 2012 Adjusted Rate Base $1.4B Common Equity Ratio 49.2% Requested

  56. Slide 56: Pending Rate Case – Delmarva Power Delaware Electric

    Distribution Rate Cases – Pending Delmarva Power – Delaware Electric Note: See Safe Harbor Statement at the beginning of today’s presentations. Rate Case Request Docket No. 13 - 115 Initial Filing Date 3/22/13 Test Year January 2012 – December 2012 Adjusted Rate Base $745.6M Common Equity Ratio 49.2

  57. Slide 57: Pending Rate Case – Pepco Maryland

    Distribution Rate Cases – Pending Pepco – Maryland Note: See Safe Harbor Statement at the beginning of today’s presentations. Rate Case Request Case No. 9336 Initial Filing Date 12/4/13 Test Year October 2012 – September 2013 Adjusted Rate Base $1.4B Common Equity Ratio 49.9% Requested Return on Equ

  58. Slide 58: Pending Rate Case – Atlantic City Electric New Jersey

    Distribution Rate Cases – Pending Atlantic City Electric – New Jersey Note: See Safe Harbor Statement at the beginning of today’s presentations. Rate Case Request Initial Filing Date 3/14/14 Test Year January 2013 – December 2013 Adjusted Rate Base $1.4B Common Equity Ratio 50.0% Requested Return on

  59. Slide 59: Drivers of Requested Revenue Increase

    Proposed ROE Increase $17 Rate Base Growth $86 Increase in Operating Expenses $2 Distribution Rate Cases – Drivers of Requested Revenue Increase ▪ Breakdown of requested rate increases:* • Rate base growth, including reliability investments • Requested increase in authorized ROEs • Increase in opera

  60. Slide 60: Regulatory Information by Commission

    Regulatory Information by Commission (1) The District of Columbia PSC allows rates to be developed using a partially forecasted test period. The Company is required to update the test period to all actual within 180 days of the completion of the rate proceeding (2) The statutory deadline for NJBPU d

  61. Slide 61: FERC-Regulated Transmission Business

    FERC - Regulated Transmission Business (1) Estimated rate base at 12/31/13 based on FERC - approved formula (2) Current authorized return on equity; projects with a FERC - approved incentive ROE adder earn 12.8%; authorized return on equity is 11.3% for all other transmission (3) MAPP costs to be re

  62. Slide 62: Transmission Update

    Transmission Update ▪ MAPP Abandonment Costs • On February 28, 2014, FERC approved a settlement agreement approving recovery of $80.5 million over three years, and allows PHI to retain title to all real property interests ▪ ROE and Protocol Complaint • On February 27, 2013, a Section 206 complaint w

  63. Slide 63: Regulatory Summary

    Regulatory Summary ▪ Regulatory success is driven by continued focus on improving reliability and customer service ▪ Focused on timely recovery of ongoing costs and reasonable returns on current investments under the current regulatory process ▪ P ursuing opportunities to advance alternative rate ma

  64. Slide 64: Regulatory Overview

    Regulatory Overview Kevin McGowan, Vice President, Regulatory Affairs

  65. Slide 65: Appendix

    Appendix

  66. Slide 66: Distribution Rate Cases – Recently Decided

    Distribution Rate Cases – Summary Recently Decided Company/ Jurisdiction Requested Revenue Requirement Increase Revenue Requirement Increase Approved Requested Return on Equity (ROE) Return on Equity Approved Filing Date Timing of Decision ACE – NJ $70.4 $25.5 10.25% 9.75% 1/4/13 Settlement Approved

  67. Slide 67: Proposed Forward Looking Rate Plan Filing – Delaware

    Proposed Forward Looking Rate Plan Filing – Delmarva Power – Delaware Electric ▪ On October 2, 2013, Delmarva Power filed a unique Forward Looking Rate Plan (FLRP) in Delaware (electric) • Filing proposes annual rate increases over a four - year period • FLRP provides the opportunity for Delmarva Po

  68. Slide 68: Transmission Formula Rate Process

    Transmission Formula Rate Process • Debt % in Capital Structure x Debt Rate x Total Rate Base Cost of Debt • Equity % in Capital Structure x 11.3% ROE x Base Rate Base Equity Return – Base • Equity % in Capital Structure x 12.8% ROE x Incentive Rate Base Equity Return – Incentive • Operation and Mai

  69. Slide 69: Default Service Auction/Bidding Process

    Default Service Auction/Bidding Process Maryland (Pepco/Delmarva Power) District of Columbia (Pepco) Delaware (Delmarva Power) New Jersey (Atlantic City Electric) Transition to Competitive Market July 2004 February 2005 May 2006 August 2003 Procurement Public Service Commission approves and monitors

  70. Slide 70: Default Service Procurement – Auction Description

    Default Service Procurement – Auction Description for Load Bid 2014/15 Maryland - Pepco/Delmarva Power District of Columbia - Pepco Delaware - Delmarva Power New Jersey - Atlantic City Electric Supply Period 6/1/14 to 5/31/15 6/1/14 to 5/31/15 6/1/14 to 5/31/15 6/1/14 to 5/31/15 Load Bid 50% (2)(5)

  71. Slide 71: Pepco Energy Services Overview

    Pepco Energy Services Overview John Huffman, President and CEO, Pepco Energy Services

  72. Slide 72: Pepco Energy Services – Overview

    Pepco Energy Services – Overview ESCO business Provides government and institutional customers with competitive energy efficiency services ▪ Designs, builds, and operates energy efficiency and combined heat and power (CHP) projects ▪ Most contracts are performance based in which PES guarantees a cer

  73. Slide 73: 2014 Outlook

    2014 Outlook * Excludes impairments; see Appendix for reconciliation of GAAP earnings to adjusted earnings ▪ ESCO market continues to improve in 2014 ▪ Underground T&D construction activity expected to continue to be driven by utility infrastructure and reliability spending ▪ Earnings expected to be

  74. Slide 74: ESCO Business

    ESCO Business ▪ The ESCO market has rebounded and continues to improve ▪ PES signed $66 million of ESCO contracts during 2013, up significantly from $9 million in 2012 ▪ While much improved over 2012, market activity has not yet returned to 2010 – 2011 levels • State and local government markets : I

  75. Slide 75: ESCO Business

    ESCO Business ▪ PES is well positioned to grow its ESCO business: • Experienced and knowledgeable staff • Proven track record of completing projects, delivering energy savings • Based in Washington , D.C.; strong relationships with the federal government – the key emerging opportunity • U.S. DOE and

  76. Slide 76: Underground T&D Construction Business – W.A. Chester

    Underground T&D Construction Business – W.A. Chester ▪ Through W.A. Chester, PES is an industry leader in the installation and maintenance of underground T&D lines in North America ▪ W.A. Chester signed $111 million of new contracts during 2013, up from $47 million in 2012 ▪ Market activity is being

  77. Slide 77: Underground T&D Construction Business

    Underground T&D Construction Business ▪ Pipe - type Cable Market : Of two primary contractors, W.A . Chester is foremost in serving this market; a reliable and long - lived technology accounting for the majority of existing underground circuit miles ▪ Solid Dielectric C able Market : W.A. Chester is

  78. Slide 78: Forecasted Gross Margin Under Contract

    Forecasted Gross Margin Under Contract $ 34 million Gross Margin 11 - year remaining weighted average vs. $38 million / 12 - year contract backlog last year $11 million Gross Margin 12 - month remaining weighted average vs. $7 million / 9 - month contract backlog last year Construction: Energy Effic

  79. Slide 79: Summary

    Summary ▪ PES is well positioned to grow as the market continues to rebound; the long - term fundamentals of the ESCO business remain solid ▪ Expect continued demand for PES ’ underground T&D construction business driven by reliability and infrastructure spending ▪ PES provides a platform for PHI to

  80. Slide 80: Pepco Energy Services Overview

    Pepco Energy Services Overview John Huffman, President and CEO, Pepco Energy Services

  81. Slide 81: Appendix

    Appendix

  82. Slide 82: Reconciliation of GAAP Earnings to Adjusted Earnings

    Reconciliation of GAAP Earnings to Adjusted Earnings Note: See Regulation G Information at the beginning of today’s presentations. (Millions of Dollars) 2013 Net Income from Continuing Operations (GAAP) $ 3.0 Adjustments (after - tax ): Impairment charges 3.0 Adjusted Net Income from Continuing Oper

  83. Slide 83: Financial Overview

    Financial Overview Fred Boyle, Senior Vice President & Chief Financial Officer

  84. Slide 84: Financial Objectives

    Financial Objectives ▪ Achieve sustainable earnings and dividend growth by: • Investment in infrastructure • Reduction of regulatory lag ▪ Maintain solid investment grade credit ratings by preserving: • Solid credit metrics • Ample liquidity • Strong cash flow • Low business risk profile Note: See S

  85. Slide 85: Projected Capital Expenditures 2014–2018

    $1,302 $1,139 $1,171 $1,120 $1,140 $0 $200 $400 $600 $800 $1,000 $1,200 $1,400 2014 2015 2016 2017 2018 $ 5.9 Billion Projected Capital Expenditures 2014 – 2018 (Millions of Dollars) Distribution g $ 972 $ 837 $ 898 $ 853 $ 846 Transmission g 318 290 260 255 285 PES/Other g 12 12 13 12 9 Total $ 1,3

  86. Slide 86: Infrastructure Investment – The Driver of Growth

    $4,630 $5,273 $5,779 $6,145 $6,587 $7,008 $7,341 $240 $266 $274 $284 $292 $298 $303 $1,514 $1,509 $1,656 $1,882 $2,009 $2,154 $2,274 $6,384 $7,048 $7,709 $8,311 $8,888 $9,460 $9,918 $0 $2,000 $4,000 $6,000 $8,000 $10,000 $12,000 2012A 2013E 2014P 2015P 2016P 2017P 2018P Electric Distribution Gas Dis

  87. Slide 87: Stable Credit Profile

    Stable Credit Profile PHI Credit Metrics 2013 Actual* Long - Term Target Metrics FFO Interest Coverage 3.8X >3.5X FFO Debt Coverage 17% >15% Debt/Capitalization 57% ~55% * Source: S&P CreditStats Direct, see Appendix for detailed calculations ▪ Targeted regulated debt to capitalization ratio at the

  88. Slide 88: Solid Liquidity Position

    Solid Liquidity Position PHI (Millions of Dollars) Consolidated Credit Facility (Total Capacity) $750 $750 $1,500 Letters of Credit Issued (2) - (2) Commercial Paper Outstanding (29) (357) (386) Remaining Credit Facility Available $719 $393 $1,112 Cash Invested in Money Market Funds - 2 2 Total Cash

  89. Slide 89: 2014 Financing Activity

    • Utility long - term debt issuance of $750 - $850 million Debt Issuance • Dividend Reinvestment Plan/Employee Savings Plan (approximately $43 million) Equity Issuance Issuance Maturing Pepco $400 million 3.60% First Mortgage Bonds due 2024 issued March 18 $175 million Delmarva Power $200 - $250 mil

  90. Slide 90: Manageable Debt Maturity Schedule

    $0 $50 $100 $150 $200 $250 $300 $350 $400 $450 $500 $550 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 Pepco Holdings Inc Atlantic City Electric Delmarva Power & Light Potomac Capital Invt Corp Po

  91. Slide 91: 2014 Estimated Sources and Uses of Cash

    Sources and Uses Sources Cash Flow from Operations (1) $1,094 Dividend Reinvestment Plan 43 Long-Term Debt Issuance (2) 750 Short-Term Debt Issuance 368 Total Sources $2,255 Uses Capital Expenditures (3) $1,501 Common Stock Dividends (4) 271 Long-Term Debt Retirements (2) 400 ACE Securitization Debt

  92. Slide 92: Pension and OPEB Impacts

    Pension and OPEB Impacts $67 $57 $40 $0 $10 $20 $30 $40 $50 $60 $70 $80 $90 $100 2012A 2013A 2014E $200 $120 $0 $0 $50 $100 $150 $200 $250 $300 2012A 2013A 2014E Net Pension & OPEB Pre - Tax Expense (O&M) Pension Cash Contributions (Millions of Dollars ) Note: See Safe Harbor Statement at the beginn

  93. Slide 93: Cash Tax Summary

    Cash Tax Summary ▪ PHI is in the process of negotiating a settlement with the IRS for open tax years back to 2001 ▪ After reaching a settlement, we expect to have a Net Operating Loss (NOL) of approximately $350 million as of December 31, 2013 ▪ We estimate the NOL will be fully utilized in 2017 Not

  94. Slide 94: Power Delivery Earnings Support Annual Dividend

    Power Delivery Earnings Support Annual Dividend Power Delivery Earnings versus Annual Dividend $0.93 $1.02 $1.18 $0.00 $0.20 $0.40 $0.60 $0.80 $1.00 $1.20 $1.40 2011 2012 2013 Earnings Per Share Power Delivery Earnings Annual Dividend P rogressing to a payout r atio in line with peers Note: See Safe

  95. Slide 95: Secure Dividend, Attractive Yield

    Secure Dividend, Attractive Yield Current dividend yield is 26% higher than the average dividend yield for companies in the S&P 500 Electric Utilities Source: NASDAQ, dividend yield as of March 14, 2014 Note: See Safe Harbor Statement at the beginning of today’s presentations. Dividend Yield 4.2% 5.

  96. Slide 96: 2014 Earnings Guidance

    $0.00 $0.20 $0.40 $0.60 $0.80 $1.00 $1.20 $1.40 2013 Adjusted* 2014E Guidance 2014 Earnings Guidance Earnings Per Share $ 1.12 - $1.27 $1.14 The guidance range excludes: ▪ The results of discontinued operations and the impact of any special, unusual or extraordinary items ▪ The effect of adopting ne

  97. Slide 97: 2014 Earnings Guidance (continued)

    $0.00 $0.20 $0.40 $0.60 $0.80 $1.00 $1.20 $1.40 2013 Adjusted Annualization of 2013 Rate Case Outcomes Transmission Revenue PES Other, net Interest Expense Dilution Income Tax Adjustments O&M Depreciation & Amortization(2) 2014E Guidance $1.14 ($0.11) ($0.05) ( $0.03) ( $0.02) $ 0.01 $ 0.03 ( $0.01)

  98. Slide 98: Well Positioned to Deliver Value

    Well Positioned to Deliver Value Committed to the Dividend Attractive yield Stable Earnings Base 98% of forecasted operating income from Power Delivery Long - term Earnings Growth Rate base growth and reduction of regulatory lag Financial Strength Strong balance sheet, ample liquidity, solid investm

  99. Slide 99: Financial Overview

    Financial Overview Fred Boyle, Senior Vice President & Chief Financial Officer

  100. Slide 100: Appendix

    Appendix

  101. Slide 101: Pepco Sales, Customers and Expenditure Projections

    DC Electric MD Electric Total Electric Standard Delivered Delivered Delivered Offer Service Customers % Change Projected Projected 2014 11,305 14,659 25,964 8,710 2014 735,724 1.2% 2015 11,305 14,675 25,980 8,742 2015 745,143 1.3% 2016 11,331 14,749 26,080 8,815 2016 754,749 1.3% 2017 11,359 14,801

  102. Slide 102: Delmarva Power Sales, Customers and Expenditure Projections

    Gas Mcf DE Electric MD Electric Total Electric Standard Gas Delivered Delivered Delivered Offer Service Delivered Customers % Change Projected Projected 2014 8,126 4,156 12,282 5,671 20,216 2014 447,925 0.6% 2015 8,184 4,134 12,318 5,687 20,325 2015 450,692 0.6% 2016 8,214 4,127 12,341 5,690 20,420

  103. Slide 103: Atlantic City Electric Sales, Customers and Expenditures

    NJ Electric Basic Generation Delivered Service Customers % Change Projected Projected 2014 9,117 4,415 2014 480,322 0.5% 2015 9,124 4,424 2015 483,580 0.7% 2016 9,160 4,443 2016 486,814 0.7% 2017 9,179 4,455 2017 489,994 0.7% 2018 9,154 4,444 2018 493,106 0.6% Transmission Distribution Total Transmi

  104. Slide 104: Projected Capital Expenditures 2014–2018

    Projected Capital Expenditures – 2014 – 2018 (Millions of Dollars) 2014 2015 2016 2017 2018 Total Power Delivery Distribution $ 774 $ 707 $ 771 $ 729 $ 744 $ 3,725 Distribution - Smart Grid 2 - - - 8 10 Transmission 318 290 260 255 285 1,408 Gas Delivery 29 28 28 28 29 142 Other 167 102 99 96 65 529

  105. Slide 105: Projected Year-End Rate Base by Utility

    (Millions of Dollars) 2013 2014 2015 2016 2017 2018 Estimated Projected Projected Projected Projected Projected Distribution – Electric Pepco $2,805 $3,146 $3,425 $3,727 $4,010 $4,228 Delmarva Power 1,272 1,363 1,442 1,512 1,582 1,642 Atlantic City Electric 1,196 1,270 1,278 1,348 1,416 1,471 Total

  106. Slide 106: Calculation of Credit Metrics

    Calculation of Credit Metrics Note: See Regulation G Information at the beginning of today’s presentations. Source: S&P Credit Stats Direct 2013 EBITDA (GAAP Measure) 1,180$ Rating Agency Adjustments Less: Interest Expense, adjusted (314) Less: Current Tax Expense, adjusted 112 Plus: Interest Income

  107. Slide 107: Long-term Debt Maturities

    Long - term Debt Maturities Note: Excludes debt maturities related to Atlantic City Electric securitization bonds. Maturity Interest (Millions of Dollars) Date Rate Pepco - Senior Notes 4/15/14 4.65% 175$ -$ -$ Delmarva Power - Unsecured Notes 11/15/14 5.00% 100 - - Delmarva Power - Unsecured Notes

  108. Slide 108: Reconciliation of GAAP EPS to Adjusted EPS

    Reconciliation of GAAP EPS to Adjusted EPS Note: See Regulation G Information at the beginning of today’s presentations. Three Months Ended December 31, Year Ended December 31, 2013 2012 2013 2012 Reported (GAAP) Earnings per Share from Continuing Operations $ 0.23 $ 0.15 $ 0.45 $ 0.95 Adjustments (

  109. Slide 109: 2014 Earnings Guidance Assumptions

    Power Delivery ▪ Normal weather and operating conditions ▪ Reasonable regulatory outcomes for pending electric distribution base rate cases ▪ Projected growth in number of total customers of 0.8% ▪ Forecasted sales decline of 0.2% ▪ Utility total O&M expense of $890 - $910 million ▪ Construction exp