Copano Energy L.L.C.

Copano Energy L.L.C — Platts 5th Pipeline Development & Expansion Conference (September 2010)

15 slides from Copano Energy L.L.C's conference presentation, Sep 23, 2010

  1. Slide 1: Copano's expansions in the Eagle Ford Shale, including a joint venture with Kinder Morgan

    Slide 1: Copano's expansions in the Eagle Ford Shale, including a joint venture with Kinder Morgan

    Copano’s expansions in the Eagle Ford Shale, including a joint venture with Kinder Morgan Platts 5 th Pipeline Development & Expansion Conference September 24, 2010 NASDAQ: CPNO

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    Disclaimer This presentation includes “forward-looking statements,” as defined in the federal securities laws. Statements that address activities, or events that Copano believes will or may occur in the future are forward-looking statements. These statements include, but are not limited to, statemen

  3. Slide 3: Introduction to Copano

    Slide 3: Introduction to Copano

    Introduction to Copano Independent midstream company founded in 1992 ■ Best in class service to customers ■ Entrepreneurial approach ■ Focus on long-term accretive growth Provides midstream services in multiple producing areas through three operating segments ■ Texas ● South Texas conventional and E

  4. Slide 4: Key Copano Metrics

    Slide 4: Key Copano Metrics

    Key Copano Metrics Service throughput volumes approximate 1.8 Bcf/d of natural gas (1) Approximately 6,700 miles of active pipelines 8 natural gas processing plants with over 1.1 Bcf/d of combined processing capacity One NGL fractionation facility with total capacity of 22,000 Bbls/d Equity market c

  5. Slide 5: Copano in 1992

    Slide 5: Copano in 1992

    Copano in 1992 Copano began with a 23-mile pipeline in Copano Bay in

  6. Slide 6: Copano Assets in South Texas - Pre-Eagle Ford

    Slide 6: Copano Assets in South Texas - Pre-Eagle Ford

    Copano Assets in South Texas - Pre-Eagle Ford Acquired and extended multiple gathering systems Acquired Houston Central plant in 2001 Developed KMTP relationship

  7. Slide 7: Copano's Houston Central Complex

    Slide 7: Copano's Houston Central Complex

    Copano’s Houston Central Complex 700 MMcf/d of processing capacity ■ 200 MMcf/d of readily available expansion capacity NGL fractionation and transportation ■ Newly commissioned 22,000 BPD fractionator (May 2010) ■ Ability to further expand fractionation facility ■ Over 250 miles of NGL pipelines pr

  8. Slide 8: Eagle Ford Shale Development

    Slide 8: Eagle Ford Shale Development

    Eagle Ford Shale Development

  9. Slide 9: Eagle Ford Shale Advantages

    Slide 9: Eagle Ford Shale Advantages

    Eagle Ford Shale Advantages Substantial infrastructure exists today Rich gas and condensate/crude provide drilling incentive to producers Lower break-even prices compared to most other shale and conventional plays Significant demand for natural gas and NGLs on the Texas Gulf Coast Historically fewer

  10. Slide 10: 2010 - DeWitt-Karnes Header System

    Slide 10: 2010 - DeWitt-Karnes Header System

    2010 - DeWitt-Karnes Header System Built Dewitt Karnes Header (45 miles of 24” pipeline) ■ In-service September Services the most prolific rich gas window of the Eagle Ford Shale Access to Houston Central complex via KMTP 30” pipeline

  11. Slide 11: Why is the Joint Venture a Natural Fit?

    Slide 11: Why is the Joint Venture a Natural Fit?

    Why is the Joint Venture a Natural Fit? Long-standing relationship between Copano and Kinder Morgan Copano ■ Gathering and processing expertise ■ Available processing and fractionation capacity ■ Multiple market access for natural gas and NGLs Kinder Morgan ■ Transmission expertise ■ Available pipel

  12. Slide 12: Eagle Ford Gathering, LLC

    Slide 12: Eagle Ford Gathering, LLC

    Eagle Ford Gathering, LLC 50/50 Kinder Morgan/Copano ■ Initial build-out of 85 miles of 24” and 30” pipelines (expected completion: summer 2011) ■ Copano acts as operator and managing member ■ 520,000 MMBtu/d of capacity without compression Kinder Morgan and Copano share commercial development activ

  13. Slide 13: Potential Extensions - 2012 and beyond

    Slide 13: Potential Extensions - 2012 and beyond

    Potential Extensions - 2012 and beyond Copano 24” extensions (KM loop to HCP) Possible processing expansion

  14. Slide 14: Eagle Ford Shale Expansion Summary

    Slide 14: Eagle Ford Shale Expansion Summary

    Eagle Ford Shale Expansion Summary Integrated midstream solutions throughout the Eagle Ford trend Immediately available capacity Readily expandable infrastructure Access to multiple markets for natural gas and NGLs

  15. Slide 15: Contact Information

    Slide 15: Contact Information

    Contact Information Jim Wade Copano Energy - Texas President [email protected] Duane Kokinda Kinder Morgan Texas Pipeline LLC President [email protected] Brian Eckhart Copano Energy - Texas Senior Vice President, Supply and Transportation [email protected] Bruce Boyd

Source: SEC EDGAR · 8-K filed Sep 23, 2010