  1. Slide 1: Financial Results for the Year Ended March 31, 2012

    Slide 1: Financial Results for the Year Ended March 31, 2012

    ■ Financial Results for the Year Ended March 31, 2012 Hokkaido Electric Power Co., Inc. May 17, 2012 1

  2. Slide 2: Contents

    Slide 2: Contents

    ■Contents □ Financial Results for the Year Ended March 31, 2012 ・ ・ ・ ・ ・ ・ ・ 3 □ Efforts to Restart of Tomari Nuclear Power Plant ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ 4 □ Supply and Demand Outlook This Summer ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ 5 □ Dividends ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・ ・

  3. Slide 3: Financial Results for the Year Ended March 31, 2012

    Slide 3: Financial Results for the Year Ended March 31, 2012

    ■ Financial Results for the Year Ended March 31, 2012 Net loss: 72.0 billion yen (Consolidated) 74.5 billion yen (Non-consolidated) Major causes of significant loss  Long-term shutdown of Tomari Nuclear Power Plant Units 1 and 2 due to stress tests  Reversal of deferred tax assets Deferred tax ass

  4. Slide 4: Efforts to Restart of Tomari Nuclear Power Plant

    Slide 4: Efforts to Restart of Tomari Nuclear Power Plant

    ■Efforts to Restart of Tomari Nuclear Power Plant Safety measures at Tomari Nuclear Power Plant Seismic back-check Emergency safety measures Assessment of seismic ground motion and Severe accident measures tsunami assuming consolidated movement of Mid- to long-term measures the faults in the sea are

  5. Slide 5: Supply and Demand Outlook This Summer

    Slide 5: Supply and Demand Outlook This Summer

    ■Supply and Demand Outlook This Summer Tight supply/demand conditions are forecasted following the stoppage of large-scale power generation. Supply/demand outlook(August) in case Tomari Nuclear Power Plant does ◆ Large-scale power plants are to not restart power generation stop for periodic inspecti

  6. Slide 6: Dividends

    Slide 6: Dividends

    ■ Dividends The policy to maintain stable dividends remains unchanged. FY2012 FY2013 • Net loss amounted to 74.5 billion yen • The timing of restarting power due to reversal of deferred tax assets. generation at Tomari Nuclear Power Plant remains unpredictable. • Deferred tax assets could be account

  7. Slide 7: Financial Results and Forecasts

    Slide 7: Financial Results and Forecasts

    ■ Financial Results and Forecasts ■ Financial Results for the Year Ended March 31, 2012 7

  8. Slide 8: Summary of Financial Results

    Slide 8: Summary of Financial Results

    ■ Summery of Financial Results Points of financial results [Increase factors] Implementation of the electric power interchange to Honshu Revenue Effects of fuel cost adjustment based on the rise in fuel prices, etc. [Decrease factors]Decrease in electricity sales, etc. [Increase factors] Increase in

  9. Slide 9: Consolidated Statements of Operation

    Slide 9: Consolidated Statements of Operation

    ■ Consolidated Statements of Operation (Billion yen) April 1, 2011 – April 1, 2010 – Increase/Decrease Comparison March 31, 2012 (A) March 31, 2011 (B) (A)-(B) (A)/(B)% Operating revenue 634.4 566.2 68.1 112.0 Ordinary revenue Electricity 614.4 544.7 69.6 112.8 Others 20.0 21.5 (1.5) 93.0 Non-operat

  10. Slide 10: Electricity Sales

    Slide 10: Electricity Sales

    ■ Electricity Sales Total electricity sales have decreased by 0.5% compared to the previous year Increased 98 GWh(increased by 0.7% compared to the previous year) Non-eligible [Increase factors]Expansion of the adoption of electric appliances and increase in heating demand customers due to the tempe

  11. Slide 11: Power Supply

    Slide 11: Power Supply

    ■ Power Supply A stable electric supply has been maintained due to increasing operating hours of thermal and hydroelectric power plants, while the outage days of Tomari Nuclear Power Plant Units 1 and 2 increased due to the stress tests, etc. (GWh) April 1, 2011 – April 1, 2010 – Increase/decrease C

  12. Slide 12: Statements of Income (Non-consolidated Revenue)

    Slide 12: Statements of Income (Non-consolidated Revenue)

    ■ Statements of Income (Non-consolidated Revenue) (Billion yen) April 1, 2011 – April 1, 2010 – Increase/Decrease March 31, 2012 March 31, 2011 (A)-(B) Major factors for increase/decrease (A) (B) Residential 257.1 250.4 6.7 Electricity sales Commercial ・Effects of fuel cost adjustments, etc. and ind

  13. Slide 13: Statements of Income (Non-consolidated Expenses)

    Slide 13: Statements of Income (Non-consolidated Expenses)

    ■ Statements of Income (Non-consolidated Expenses) (Billion yen) April 1, 2011 – April 1, 2010 – Increase/ March 31, 2012(A) March 31, 2011(B) Decrease Major factors for increase/decrease (A)-(B) Personnel 58.6 55.2 3.3 ・Increase in retirement allowance expenses ; 2.8 ・Decrease in nuclear power outp

  14. Slide 14: Reversal of deferred tax assets

    Slide 14: Reversal of deferred tax assets

    ■ Reversal of deferred tax assets Policy: Deferred tax assets can be accounted for after Tomari Nuclear Power Plant restarts because stable taxable income is expected. Present status: The forecasts of earnings and expenses are uncertain because the timing of restart has yet to be determined. Account

  15. Slide 15: Comparison with Financial Outlook (Non-consolidated)

    Slide 15: Comparison with Financial Outlook (Non-consolidated)

    ■ Comparison with Financial Outlook (Non-consolidated) (TWh, Billion yen) April 1, 2011 – March 31, 2012 Increase/ [reference] Forecast announced in Decrease Forecast announced Actual (A) March, 2012 (B) (A)-(B) in April, 2011 [Electricity sales:TWh] [32.1] [Approx. 32.1] [same level] [Approx.32.6]

  16. Slide 16: Balance Sheets

    Slide 16: Balance Sheets

    ■ Balance Sheets (Billion yen) Increase/ As of March 31, As of March 31, Decrease Major factors for increase/decrease 2012(A) 2011(B) (A)-(B) (non-consolidated) Consolidated 1,618.8 1,641.5 (22.7) ・Capital expenditure ; 107.2 ・Decrease in property of Electric utility plant Assets caused by depreciat

  17. Slide 17: Consolidated Cash Flows

    Slide 17: Consolidated Cash Flows

    ■ Consolidated Cash Flows (Billion yen) April 1, 2011 – April 1, 2010 – Increase/ March 31, 2012 March 31, 2011 Decrease (A) (B) (A)-(B) Operating Activities 106.9 126.5 (19.5) Income(loss) before income taxes [included in “Operating Activities”] [(14.5)] [20.0] [(34.5)] Depreciation and amortizatio

  18. Slide 18: Forecasts of Financial Results for the Year Ending March 31, 2013

    Slide 18: Forecasts of Financial Results for the Year Ending March 31, 2013

    ■ Forecasts of Financial Results for the Year Ending March 31, 2013 18

  19. Slide 19: Forecasts of Financial Results for the Year Ending March 31, 2013

    Slide 19: Forecasts of Financial Results for the Year Ending March 31, 2013

    ■ Forecasts of Financial Results for the Year Ending March 31, 2013 Forecasts of consolidated and non-consolidated results including operating revenue, operating income, ordinary income and net income, for the year ending March 31, 2013, have not been determined yet due to the following reasons. For

  20. Slide 20: Appendix

    Slide 20: Appendix

    ■ Appendix Priority Actions in FY2013 Financial Results for the Year Ended March 31, 2012 □ Priority Actions in FY2013・・・・・・・・・・・・・・・・・・・・・・・ 22 □ Electricity Sales ・・・・・・・・・・・・・・・・・・・・・・・・・・・・ 45 □ Securing stable supply of electricity・・・・・・・・・・・・・・・・ 23 □ Electricity Sales(Compared with forecasts

  21. Slide 21: Priority Actions in FY2013

    Slide 21: Priority Actions in FY2013

    ■ Priority Actions in FY2013 21

  22. Slide 22: Priority Actions in FY2013

    Slide 22: Priority Actions in FY2013

    ■Priority Actions in FY2013 Securing stable supply Installing more heat pump of electricity systems to save energy Promoting safety measures at Promoting energy saving by Tomari Nuclear Power Plant further popularizing heat pump systems Developing electricity supply/demand measures Expanding the int

  23. Slide 23: Securing stable supply of electricity - Tomari safety measures #1

    Slide 23: Securing stable supply of electricity - Tomari safety measures #1

    ■Securing stable supply of electricity - Promoting safety measures at Tomari Nuclear Power Plant #1 Safety measures Emergency safety measures (already implemented) (See page 55 to 62 for details) ・ Prevent damage to the reactor core and spent fuel even if all AC power is lost due to tsunami, etc. Mi

  24. Slide 24: Securing stable supply of electricity - Tomari safety measures #2

    Slide 24: Securing stable supply of electricity - Tomari safety measures #2

    ■Securing stable supply of electricity - Promoting safety measures at Tomari Nuclear Power Plant #2 Efforts toward restart of power generation Respond to the Stress Test* ・We aim to restart power generation of Tomari Nuclear Power Plant Units 1 and 2 as soon as possible Safety Commission (NSC) resul

  25. Slide 25: Securing stable supply of electricity - Tomari safety measures #3

    Slide 25: Securing stable supply of electricity - Tomari safety measures #3

    ■Securing stable supply of electricity - Promoting safety measures at Tomari Nuclear Power Plant #3 Outline of primary assessment results of the stress test for Tomari Units 1 and 2 ・ The safety margin is sufficient to prevent fuel damage as happened in the Fukushima Daiichi Nuclear Power Station ac

  26. Slide 26: Developing electricity supply/demand measures #1

    Slide 26: Developing electricity supply/demand measures #1

    ■Securing stable supply of electricity - Developing electricity supply/demand measures #1 Supply and Demand Situation Last Winter Last winter, our supply/demand measures enabled us to avoid supply shortage. ・ Repairs to thermal and hydropower plants were deferred and the work period was reduced. Res

  27. Slide 27: Developing electricity supply/demand measures #2

    Slide 27: Developing electricity supply/demand measures #2

    ■Securing stable supply of electricity - Developing electricity supply/demand measures #2 Supply and demand outlook this summer Tight supply/demand conditions are forecasted following the stoppage of large-scale power generation. Supply/demand outlook (August) in case Tomari Nuclear Power Plant ◆ La

  28. Slide 28: Expanding the introduction of renewable energies #1

    Slide 28: Expanding the introduction of renewable energies #1

    ■Securing stable supply of electricity - Expanding the introduction of renewable energies #1 Introduction of wind power and photovoltaic power Capacity of electric power system to receive and wind power introduction (10MW) (GWh) 60 2,400 ■ Output ■ Purchased Power 560MW 50 2,000 Capacity to receive

  29. Slide 29: Expanding the introduction of renewable energies #2

    Slide 29: Expanding the introduction of renewable energies #2

    ■Securing stable supply of electricity - Expanding the introduction of renewable energies #2 Joint verification test with Tokyo Electric Power Company (TEPCO) for expanding the introduction of wind power generation The maximum amount to be Interconnected is Add 200 MW to interconnect Current status:

  30. Slide 30: Expanding the introduction of renewable energies #3

    Slide 30: Expanding the introduction of renewable energies #3

    ■Securing stable supply of electricity - Expanding the introduction of renewable energies #3 Technological studies toward broader introduction of wind and solar power generation Facilities need to be drastically reinforced for bulk installation of renewable energy to deal with its power fluctuations

  31. Slide 31: Establishing future electricity supply structure #1

    Slide 31: Establishing future electricity supply structure #1

    ■Securing stable supply of electricity - Establishing future electricity supply structure #1 Introduction of new power plants Ishikariwan Shinko Power Plant Kyogoku Power Plant (LNG Thermal Power) (pure pumped-storage hydroelectric power) Contribute diversification of fuel types In addition to a rol

  32. Slide 32: Establishing future electricity supply structure #2

    Slide 32: Establishing future electricity supply structure #2

    ■Securing stable supply of electricity - Establishing future electricity supply structure #2 Reinforcement of Kitahon High Voltage Direct Current Link Considerations toward reinforcement of Kitahon High Voltage Direct Current Link ・ Studies are under way on early reinforcement to ensure a more relia

  33. Slide 33: Further popularizing heat pump systems #1

    Slide 33: Further popularizing heat pump systems #1

    ■Further popularizing heat pump systems #1 Recommending electrical equipment based on heat pump systems utilizing heat contained in the air ~Contribute to energy saving in Hokkaido, where the huge energy demand exists 【 Energy consumption per household in Hokkaido is about 1.5 times the national ave

  34. Slide 34: Further popularizing heat pump systems #2

    Slide 34: Further popularizing heat pump systems #2

    ■Further popularizing heat pump systems #2 Cumulative number of Eco-Cute units introduced and adoption rate Efforts to help customers’ energy-saving (number of units introduced) View bill service on the web 30% 27.9% 16,000 Annual Results (started in December 2011) Cumulative number Efforts on intro

  35. Slide 35: Ensuring human resource development and legal compliance

    Slide 35: Ensuring human resource development and legal compliance

    ■Ensuring human resource development and legal compliance Handing down techniques and skills by systematic human resource development Systematic human resource development based on changing age structure of employees ・ Approximately 40% of our employees will reach retirement Nuclear Power Plant Trai

  36. Slide 36: Efforts to improve managerial efficiency

    Slide 36: Efforts to improve managerial efficiency

    ■ Efforts to improve managerial efficiency 36

  37. Slide 37: Efforts to improve managerial efficiency

    Slide 37: Efforts to improve managerial efficiency

    ■Efforts to improve managerial efficiency Efforts in FY2012 Review timing and range Various ordering methods of Increase the procurement of repair works equipment and supplies of domestic coal Reduction of capital investment Reduction of costs Approx. 5 billion yen Repair costs/miscellaneous costs A

  38. Slide 38: Improving Efficiency of Equipment Development, Management and Maintenance #1

    Slide 38: Improving Efficiency of Equipment Development, Management and Maintenance #1

    ■Improving Efficiency of Development, Management and Maintenance of Equipment #1 Reduction of capital investment Clearly prioritize the equipment replacement and repair works and carefully select the equipment to be renewed and repaired Further reduce costs while carrying out the work Adopt new tech

  39. Slide 39: Improving Efficiency of Equipment Development, Management and Maintenance #2

    Slide 39: Improving Efficiency of Equipment Development, Management and Maintenance #2

    ■Improving Efficiency of Development, Management and Maintenance of Equipment #2 Capital Expenditures (Billion Yen) 【Changes in capital Expenditures(non-consolidated)】 FY2012 FY2011 FY2013 (billion (Results) Original Planned yen) Results (Planned) Plan 1,200 120 21.2 22.4 25.2 23.1 Power-Generating

  40. Slide 40: Improving Efficiency of Equipment Development, Management and Maintenance #3

    Slide 40: Improving Efficiency of Equipment Development, Management and Maintenance #3

    ■Improving Efficiency of Development, Management and Maintenance of Equipment #3 Efficient management of equipment Systematically implement aging management measures based on urgency and return on investment Optimized equipment renewal based on correct understanding of aging situation [Case example]

  41. Slide 41: Reduction of repair costs / procurement costs for equipment and supplies

    Slide 41: Reduction of repair costs / procurement costs for equipment and supplies

    ■ Reduction of repair costs / Reduction of procurement costs for equipment and supplies Reduction of repair costs Clearly prioritize the repair works by carefully examining urgency and necessity of the work Review and try to unify equipment specifications Thorough optimization while carrying out the

  42. Slide 42: Reduction of fuel costs/Reduction of miscellaneous costs

    Slide 42: Reduction of fuel costs/Reduction of miscellaneous costs

    ■Reduction of fuel costs/Reduction of miscellaneous costs Reduction of fuel costs Provide diverse pricing systems Break up the times of concluding contracts Secure our own cheap, reliable large- capacity transport ship Increase the procurement of domestic coal Our own transport ship “Shin-Sapporo Ma

  43. Slide 43: Load leveling

    Slide 43: Load leveling

    ■Load leveling Efficient establishment and operation of facilities through load leveling Higher annual load factor compared with the national average (%) 80 74.3 HEPCO 72.6 72.0 73.0 71.5 70 Japan avg. (10 electric utilities) 66.7 60 62.8 62.5 61.0 50 2008 2009 2010 2011 2012 (FY) (Note) Annual load

  44. Slide 44: Financial Results for the Year Ended March 31, 2012

    Slide 44: Financial Results for the Year Ended March 31, 2012

    ■ Financial Results for the Year Ended March 31, 2012 44

  45. Slide 45: Financial Results - Electricity Sales

    Slide 45: Financial Results - Electricity Sales

    ■ Financial Results - Electricity Sales (GWh) Comparison with forecast Comparison with the announced in April, 2011 Previous Year’s Results April 1, 2011– Forecast announced in April 1, 2010 – March 31, 2012 (A) April, 2011 (B) March 31, 2011 (C) Increase/ Increase/ Rate of change Rate of change dec

  46. Slide 46: Electricity Sales (Compared with forecasts in April 2011)

    Slide 46: Electricity Sales (Compared with forecasts in April 2011)

    ■Financial Results - Electricity Sales (Compared with the forecasts in April 2011) Results of electricity sales for April 1, 2011- March 31, 2012 (Comparison with forecasts announced in April 2011) (GWh) (GWh) Monthly transition of electricity sales 3,600 Forecast Increase/ April 1, 2011- 3,400 anno

  47. Slide 47: Large Industrial Electricity Sales

    Slide 47: Large Industrial Electricity Sales

    ■Financial Results - Large Industrial Electricity Sales Large Industrial Electricity Sales Details of FY2012(Apr. 2011- Mar. 2012) (GWh) 【Composition of large industrial electricity sales by sector and growth rate from 9,000 the same term of the previous year】 Growth rate from the previous year(%) ・

  48. Slide 48: Expense breakdown (non-consolidated) - Personnel

    Slide 48: Expense breakdown (non-consolidated) - Personnel

    ■ Financial Results - Expense breakdown (non-consolidated) Personnel (Billion yen) April 1, 2011– April 1, 2010 – Increase/ March 31, 2012(A) March 31, 2011(B) Decrease Major factors for increase/decrease (A)-(B) Personnel ・Increase in retirement allowance expenses ; 2.8 58.6 55.2 3.3 [Expected rate

  49. Slide 49: Expense breakdown - Fuel and Purchased Power

    Slide 49: Expense breakdown - Fuel and Purchased Power

    ■ Financial Results - Expense breakdown (non-consolidated) Fuel and Purchased Power (Billion yen) April 1, 2011 – April 1, 2010 – Increase/ March 31, 2012 (A) March 31, 2011 (B) Decrease Major factors for increase/decrease (A)-(B) ・ Effects of outage of Tomari Nuclear Power Fuel and Plant Units 1 an

  50. Slide 50: Expense breakdown - Maintenance, Depreciation

    Slide 50: Expense breakdown - Maintenance, Depreciation

    ■ Financial Results - Expense breakdown (non-consolidated) Maintenance (Billion yen) April 1, 2011– April 1, 2010 – Increase/ March 31, 2012 March 31, 2011 Decrease Major factors for increase/decrease (A) (B) (A)-(B) ・ Increase in number of periodically inspected Maintenance 101.8 91.0 10.8 units at

  51. Slide 51: Expense breakdown - Interest and Other Expenses

    Slide 51: Expense breakdown - Interest and Other Expenses

    ■ Financial Results - Expense breakdown (non-consolidated) Interest Expenses (Billion yen) April 1, 2011 – April 1, 2010 – Increase/ March 31, 2012 March 31, 2011 Decrease Major factors for increase/decrease (A) (B) (A)-(B) [Interest(on average)[%]] [1.50] [1.62] [(0.12)] ・ Decline in Interest, etc.

  52. Slide 52: Key Factors and Sensitivity Factors

    Slide 52: Key Factors and Sensitivity Factors

    ■ Financial Results - Key Factors and Sensitivity Factors Key Factors April 1, 2011 - March 31, 2012 April 1, 2010 - March 31, 2011 (A) Increase/Decrease Forecast announced Forecast announced Actual (B) in April, 2011 in March, 2012 (B)-(A) Foreign Exchange Rate [yen/$] 86 Approx. 85 Approx. 79 79 (

  53. Slide 53: Segment Information

    Slide 53: Segment Information

    ■ Financial Results - Segment Information (Billion yen) Reportable segment Adjustments Other Total F/S Value Electric April 1, 2011 – March 31, 2012 (A) 615.2 102.8 718.1 (83.7) 634.4 Operating April 1, 2010 – 545.5 101.7 647.2 (81.0) 566.2 revenue March 31, 2011 (B) Increase/Decrease (A)-(B) 69.6 1

  54. Slide 54: Consolidated Statements of Comprehensive Income

    Slide 54: Consolidated Statements of Comprehensive Income

    ■ Financial Results - Consolidated Statements of Comprehensive Income Consolidated Statements of Comprehensive Income (Billion yen) April 1, 2011 – April 1, 2010 – Increase/ March 31, 2012 March 31, 2011 Decrease (A) (B) (A)-(B) Income(loss) before minority interests (71.7) 12.4 (84.2) Other Compreh

  55. Slide 55: Efforts to increase safety at Tomari

    Slide 55: Efforts to increase safety at Tomari

    [Appendix] Efforts to increase safety at Tomari Nuclear Power Plant 55

  56. Slide 56: Operational Status of the Tomari Nuclear Power Plant

    Slide 56: Operational Status of the Tomari Nuclear Power Plant

    ■Operational Status of the Tomari Nuclear Power Plant Operational Status of the Tomari Nuclear Power Plant Timing of reporting on the stress test Operational status Preliminary assessment Secondary assessment Under periodic inspection Reported Unit 1 (Since April 22, 2011) (December 7, 2011) Under p

  57. Slide 57: Emergency Safety Measures

    Slide 57: Emergency Safety Measures

    ■Emergency Safety Measures ① Ensuring power supply: Deployment of power generation vehicles ② Flood prevention: Improvement of water-tightness of areas containing key safety equipment ③ Supplying water to steam generators: Ensuring alternative means of external water supply ④ Supplying water to spen

  58. Slide 58: Severe Accident Measures

    Slide 58: Severe Accident Measures

    ■Severe Accident Measures Preparatory measures for severe accidents has been implemented for the purpose of prompt response in case of any emergency, despite our Emergency Safety Measures will preemptively prevent those accidents * Severe accidents: Serious core damage, etc. Prevention of hydrogen e

  59. Slide 59: Mid- and Long Term Measures #1

    Slide 59: Mid- and Long Term Measures #1

    ■Mid- and Long Term Measures #1 Note Deploy additional 3 water tanks Deploy additional power Building a coastal levee at the on high ground(around FY2015) generation vehicle seaside of the site(height: T.P. Secure power (around June 2012) supply 15m or over/length:1.7km) (around FY2015) Secure cooli

  60. Slide 60: Mid- and Long Term Measures #2

    Slide 60: Mid- and Long Term Measures #2

    ■Mid- and Long Term Measures #2 Item FY2013 FY2014 FY2015 FY2016 Upgrade quake resistance of support insulators (Implemented in Sep. 2011) Secure power supply Deploy additional power generation vehicle Deployed in June 2012 Measures to prevent flooding of the electrical To be completed equipment des

  61. Slide 61: Stress Test

    Slide 61: Stress Test

    ■Stress Test To compare the stress test to assessing the seismic impact on a house: Seismic vibration If vibration increases, If vibration increases further, assumed by the design Beams:× Columns:○ Windows:× Foundation:○ Walls:× Door:× If vibration increases further, some of the parts that provide t

  62. Slide 62: Safety Against Earthquake and Tsunami

    Slide 62: Safety Against Earthquake and Tsunami

    ■Safety Against Earthquake and Tsunami Seismic Safety Safety against Tsunami Earthquakes with strong impact on Tomari : Tsunami that causes the biggest impacts: FB‐2 fault (M8.2), Shiribetsugawa fault (M6.9) Tsunami in the eastern edge of the Japan Sea Earthquakes without specifying any epicenter ha

  63. Slide 63: For further information

    Slide 63: For further information

    This material is compiled based on data available as of May 16, 2012. The company makes no guarantee as to the reliability and integrity of such information, as this is not intended to serve as disclosure material as stipulated by the Financial Instruments and Exchange Law of Japan. Projections conc