    Power Finance Corporation Ltd. Restructured Accelerated Power Development and Reforms Programme (R- APDRP) An initiative of Nodal Agency Government of India Power Finance Corporation Ltd. We create possibilities for better tomorrow 1

  2. Slide 2: R-APDRP is GoI's initiative on baseline data and AT&C loss reduction

    Slide 2: R-APDRP is GoI's initiative on baseline data and AT&C loss reduction

    Power Finance Corporation Ltd. R-APDRP is GoI’s initiative with focus on establishment of base line data and fixation of accountability, and reduction of AT&C losses through strengthening & up-gradation of Sub- Transmission and Distribution network and adoption of Information Technology during XI Pl

  3. Slide 3: Part-A will include among others

    Slide 3: Part-A will include among others

    Power Finance Corporation Ltd. Part-A will include among others Consumer Indexing, Asset Mapping GIS Mapping of the entire distribution network Automatic Meter Reading (AMR) on DT & Feeders Automatic Data Logging for all Distribution Transformers and Feeders SCADA system in big towns / cities Feeder

  4. Slide 4: Part-B will include among others

    Slide 4: Part-B will include among others

    Power Finance Corporation Ltd. Part-B will include among others Renovation, modernization and strengthening of 11 kV level Substations, Transformers /Transformer Centres Re-conductoring of lines at 11 kV level and below Load Bifurcation, Load Balancing HVDS (11kV) installation of capacitor banks and

  5. Slide 5: Total Programme size is about Rs 50,000 Cr

    Slide 5: Total Programme size is about Rs 50,000 Cr

    Power Finance Corporation Ltd. Total Programme size is about Rs 50,000 Cr GoI Grant component for Part-A Rs.10,000 Cr (Max) GoI Grant component for Part-B Rs.20,000 Cr (Max) PFC/REC Loan for Part-B Rs.20,000 Cr (Min) GoI will provide 100% Loan for part A of the schemes including IT applications. GoI

  6. Slide 6: Conversion of GoI loan into grant

    Slide 6: Conversion of GoI loan into grant

    Power Finance Corporation Ltd. The entire amount of GoI loan (100%) for part A of the project shall be converted into grant after establishment of the required Base-Line data system within a stipulated time frame and duly verified by Third Party Independent Evaluation Agency (TPIEAs) Upto 50% (90% f

  7. Slide 7: Approvals by APDRP Steering Committee of MoP

    Slide 7: Approvals by APDRP Steering Committee of MoP

    Power Finance Corporation Ltd. The final System Requirement Specification (SRS) document and various panels of Consultants/ Agencies will be approved by the APDRP Steering Committee of MoP Schemes to be approved by APDRP Steering Committee of MoP based on the DPRs Steering Committee/ MoP will approv

  8. Slide 8: Programme structure and stakeholders

    Slide 8: Programme structure and stakeholders

    Power Finance Corporation Ltd. MoP (GoI) IT Advisor to set up WEB Portal NODAL Agency Process Third Party Independent Consultant Utilities Evaluating Agencies ( TPIEAs) Empanelled Empanelled IT Consultants IT Implementation (Part-A) Agencies (Part-A) We create possibilities for better tomorrow 8

  9. Slide 9: PFC will act as Nodal Agency providing single window service

    Slide 9: PFC will act as Nodal Agency providing single window service

    Power Finance Corporation Ltd. PFC will act as Nodal Agency to provide single window service under R-APDRP PFC will coordinate with agencies involved such as MoP, APDRP Steering Committee, CEA and various Consultants for speedy and timely completion of projects and thus assist the utilities achievin

  10. Slide 10: Nodal Agency responsibilities: SRS, DPRs, monitoring

    Slide 10: Nodal Agency responsibilities: SRS, DPRs, monitoring

    Power Finance Corporation Ltd. Finalisation of biddable SRS document, model DPRs for Part A etc. PFC will recommend projects for sanction to APDRP Steering Committee Scrutiny & vetting of DPRs for Part A & B Scrutiny of claims & recommendation to MoP for conversion of loan to grant and Release of gr

  11. Slide 11: Baseline data evaluation, certification and empanelment

    Slide 11: Baseline data evaluation, certification and empanelment

    Power Finance Corporation Ltd. Establishment of base line data and evaluation of yearly AT&C loss by Independent Evaluators Certification of work completion (A & B) Empanelment of IT consultants and IT Implementing agency to assist Utilities Creation and maintenance of web based MIS Capacity buildin

  12. Slide 12: Role of Process Consultant

    Slide 12: Role of Process Consultant

    Power Finance Corporation Ltd. Process Consultant will assist Nodal Agency for Finalization of System Requirement Specification (SRS) and convert it into a biddable document for use by utilities for base line data collection system Developing the methodology for establishing base line data system Em

  13. Slide 13: IT Consultants will assist the Utilities

    Slide 13: IT Consultants will assist the Utilities

    Power Finance Corporation Ltd. IT Consultants will assist the Utilities To customize project level Bid Documents for Part-A, meeting the requirement of specific utility and comprising of Utility IT mapping, segregation of feeders Geographical area/ feeders to be covered for IT implementation Provisi

  14. Slide 14: IT Implementation Agencies will assist Utilities

    Slide 14: IT Implementation Agencies will assist Utilities

    Power Finance Corporation Ltd. IT Implementation Agencies will assist Utilities To Implement the IT related schemes in the defined area/ feeders as per scope and terms and condition stipulated by the Utility/ IT Consultant. To establish Base Line Data Collection System [Utilities shall appoint the I

  15. Slide 15: TPIE Agencies as independent third party

    Slide 15: TPIE Agencies as independent third party

    Power Finance Corporation Ltd. TPIE Agencies will act as independent third party agency for Establishing base line data (initial loss level in the system) Annual project wise verification of yearly loss levels against the benchmark parameters Assessment of claims for conversion of loan into grant fo

  16. Slide 16: Web based MIS and monitoring system for APDRP II

    Slide 16: Web based MIS and monitoring system for APDRP II

    Power Finance Corporation Ltd. Creation of Web based comprehensive MIS and monitoring system for APDRP II. It will include The objective and coverage of the program The policy guideline of the program. Status of DPRs submitted, sanctioned etc. Status of Project Progress ( Physical & financial) Schem

  17. Slide 17: Project area identification and utility preparedness

    Slide 17: Project area identification and utility preparedness

    Power Finance Corporation Ltd. Identification of the Project areas i.e. towns having population more than 30,000. Rural areas with heavy loads requiring feeder segregation may also be included in the project areas The ring fencing of the project area to measure energy flow should be initiated at the

  18. Slide 18: Power Finance Corporation Ltd.

    Slide 18: Power Finance Corporation Ltd.

    Power Finance Corporation Ltd. We create possibilities for better tomorrow

Source: Internet Archive copy of pfcindia.com

More decks from Power Finance Corporation Limited

All 53 Power Finance decks