  1. Slide 1: Manganese made in Europe.

    Slide 1: Manganese made in Europe.

    M A N GA N E S E F O R E U R O P E C S E : U P P R · F R A : U P R · OTC Q B : U P E R F C O R P O R AT E P R E S E N TAT I O N · M AY 2 0 2 6 Manganese made in Europe. Battery and industrial materials, mined and made in Europe — developing the continent's largest manganese resource package in centr

  2. Slide 2: Forward-looking statements

    Slide 2: Forward-looking statements

    F O R W A R D - L O O K I N G S TAT E M E N T S DISCLAIMER This presentation contains or incorporates by reference "forward- Actual results relating to, among other things, results of exploration, looking statements" and "forward-looking information" under applicable metallurgical testing, project d

  3. Slide 3: Historical estimate disclosure

    Slide 3: Historical estimate disclosure

    H I S T O R I C A L E S T I M AT E D I S C L O S U R E S O U R C E & C L A S S I F I C AT I O N METHODOLOGY & ASSUMPTIONS DISCLAIMER The historical estimate for the Michalova Project was published by Slovak State The historical estimate was reportedly estimated using the polygonal method Geological

  4. Slide 4: Investment highlights

    Slide 4: Investment highlights

    INVESTMENT THESIS WHY NOW 01 One of the largest manganese resource packages in 02 Manganese is the new battery metal — and Europe Investment the EU doesn't make any 24.3 Mt of historic resource across two Slovakia projects — The newest EV battery chemistry (LMFP) is 60–80% manganese. Michalova (10.4

  5. Slide 5: Manganese — the core asset

    Slide 5: Manganese — the core asset

    C O R P O R AT E P R E S E N TAT I O N · M AY 2 0 2 6 / SECTION 01 SECTION 01 · THE CORE ASSET Manganese — the core asset. European battery-metal supply, on Europe's doorstep — two past-producing Slovak districts staged for re-entry. 01 MANGANESE · SLOVAKIA You are here → 02 Slides 13 – 16 URANIUM ·

  6. Slide 6: In the heart of Europe's EV manufacturing belt

    Slide 6: In the heart of Europe's EV manufacturing belt

    G E O G R A P H I C A D VA N TA G E W H Y S LOVA K I A M AT T E R S In the heart of Europe's A potential central refinery in the Košice region would sit inside EV manufacturing belt. the densest EV manufacturing cluster in the EU — and 850 km from the next closest EU manganese peer. EV CLUSTER DENSI

  7. Slide 7: Our Slovakia portfolio

    Slide 7: Our Slovakia portfolio

    S L O VA K I A P O R T F O L I O T W O A S S E T S , O N E A P P L I CAT I O N Our Slovakia A shallow open-pit candidate paired with a higher-grade past producer — portfolio. both intended to feed a single central refinery, with the Košice region under evaluation as a candidate location. Michalova C

  8. Slide 8: 10.4 Mt of historic manganese — and the grade is most likely understated

    Slide 8: 10.4 Mt of historic manganese — and the grade is most likely understated

    P R O J E C T · M I C H A L O VA M I C H A LOVA · W H AT W E H AV E S LOVA K I A Historical resource: 10.4 Mt at 9.49% manganese (ŠGÚDŠ, 1955 and 1993–94) 10.4 Mt of historic M I C H A L OVA P L A N · H I S T O R I C M N % & D R I L L H O L E S Shallow ore body: main mineralized layers at 49–77 m de

  9. Slide 9: Four ways this could be bigger than the books show

    Slide 9: Four ways this could be bigger than the books show

    M I C H A L O VA · U P S I D E V E C T O R S M I C H A LOVA U P S I D E 01 A deeper carbonate package the historic estimate never counted Modern review of the original drill database identified multiple manganese-bearing carbonate intervals between roughly 168 m and 200 m depth in hole M-171, with a

  10. Slide 10: 13.9 Mt remain at 14.47% manganese — most of it never mined

    Slide 10: 13.9 Mt remain at 14.47% manganese — most of it never mined

    P R O J E C T · Š VA B O V C E Š VA B OVC E · S LOVA K I A 13.9 Mt remain at 14.47% manganese — most of it never mined or systematically drilled. 114 years of operating history (1857–1971) confirms the ore can be extracted at scale. The mine closed on import economics — not exhaustion or technical f

  11. Slide 11: An ore body already mined, characterized, and metallurgically tested

    Slide 11: An ore body already mined, characterized, and metallurgically tested

    Š VA B O V C E · P R O D U C T I O N - R E A D Y C A S E FIVE REASONS 01 02 Metallurgy already tested at pilot scale on this exact ore 35 km of underground workings — re-entry is real, not theoretical Three Czechoslovak research institutes tested every then-known method in 1956–57. ~35 km of preserv

  12. Slide 12: A potential pathway: two deposits, one central refinery, one CRMA

    Slide 12: A potential pathway: two deposits, one central refinery, one CRMA

    S L O VA K I A P O R T F O L I O T H E S I S W H Y B OT H TO G E T H E R · P R O P O S E D PAT H WAY A potential pathway: two deposits, one central Conceptual integration thesis — not a committed development refinery, one CRMA plan. Subject to drilling, metallurgy, permitting, financing, and partner

  13. Slide 13: Uranium — the optionality

    Slide 13: Uranium — the optionality

    C O R P O R AT E P R E S E N TAT I O N · M AY 2 0 2 6 / SECTION 02 SECTION 02 Uranium — the optionality. Same basin as a 113.7 million pound uranium deposit. A second-track resource carried alongside the manganese program. 01 Slides 5 – 12 MANGANESE · SLOVAKIA → 02 URANIUM · BOTSWANA You are here →

  14. Slide 14: Same basin as a 113.7 Mlb uranium deposit

    Slide 14: Same basin as a 113.7 Mlb uranium deposit

    URANIUM INVESTMENT HIGHLIGHTS 02 U R A N I U M · B OT S WA N A Same basin as a 113.7 Mlb uranium deposit. UA92 sits in the same Botswana uranium basin — and uses the same rock formations — as Lotus Run by people who have done this before. Resources' Letlhakane deposit. First drill hole September 202

  15. Slide 15: The rocks already told us where to drill

    Slide 15: The rocks already told us where to drill

    P R O J E C T · U A 9 2 · B OT S WA N A 14 U A 9 2 · L E T L H A K A N E A N A L O G H I STO R I C D R I L L H O L E S · P L1 4 3 – 1 4 8, P L 2 2 0 UA92 · LETLHAKANE BASIN The rocks already told us where to drill. 2,141 km² 20 km 5 permits west of Letlhakane A F R I C A N U R A N I U M P E E R S ·

  16. Slide 16: Drill catalyst and re-rate math

    Slide 16: Drill catalyst and re-rate math

    U A 9 2 · D R I L L C ATA L Y S T & R E - R AT E M AT H 15 D R I L L C ATA L Y S T · R E - R AT E M AT H First hole September 2026. Illustrative path: 3–15× re-rate inside 18–30 months. Today's ~C$23 M market cap is pre-resource pricing on Slovakia African uranium re-rates predictably. and uranium c

  17. Slide 17: The company — the operators

    Slide 17: The company — the operators

    C O R P O R AT E P R E S E N TAT I O N · M AY 2 0 2 6 / SECTION 03 SECTION 03 The company — the operators. Built by operators who have done this before — 200+ Mlb uranium resource bases, vertically-integrated commodity platforms, ranked critical-minerals deals. 01 Slides 5 – 12 MANGANESE · SLOVAKIA

  18. Slide 18: Continuous, well-gated news flow across two commodities, three projects

    Slide 18: Continuous, well-gated news flow across two commodities, three projects

    C ATA L Y S T C A L E N D A R · 2 0 2 6 → 2 0 2 8 17 C ATA L Y S T C A L E N D A R · 2 0 2 6 → 2028 Continuous, well-gated news flow across two commodities, three projects. 2026 2027 2028 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Jun '26 Q4 '26 2027 drill mobilizes first resource combined resource SLOVAKIA ·

  19. Slide 19: Operators, geologists & advisors

    Slide 19: Operators, geologists & advisors

    L E A D E R S H I P · B O A R D · O P E R AT O R S & T E A M 19 L E A D E R S H I P · B O A R D · T E A M Operators, geologists & advisors. Built to find and develop critical metals. Three executives with 200+ Mlb uranium resource experience — backed by a board, senior advisors, and in-country explo

  20. Slide 20: 72.6 M-share float. Sprott-led at C$0.25.

    Slide 20: 72.6 M-share float. Sprott-led at C$0.25.

    C A P I TA L S T R U C T U R E · S T R AT E G I C C A P I TA L 19 C A P I TA L S T R U C T U R E · S T R AT E G I C C A P I TA L 72.6 M-share float. Tight capital structure post-January 2026 financing. Eric Sprott ~18% fully diluted — the most-recognized validation signal in Sprott-led at C$0.25. ju

  21. Slide 21: Let's talk.

    Slide 21: Let's talk.

    C O N TA C T · I N V E S T O R R E L AT I O N S 20 C O N TAC T & I N V E S TO R R E L AT I O N S Let's talk. Union Power Metals — formerly Nuclear Vision Limited — building Europe's largest manganese resource package and a Botswana uranium platform. C O M PA N Y HEAD OFFICE C S E UPPR Union Power Me