  1. Slide 1: Kamativi Lithium Tailings Project, Zimbabwe

    Slide 1: Kamativi Lithium Tailings Project, Zimbabwe

    KAMATIVI LITHIUM TAILINGS PROJECT ZIMBABWE F SAEL PLT E2M0 B1 E 8R 2 0 1 8

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    2 Qualified Persons Alain Moreau, P.Geo., and Director, is the Qualified Person as defined by National Instrument 43-101 (NI 43- DISCLAIMER 101) for ; Gold Corp. and has verified the data disclosed in this presentation, including sampling, analytical, and test data underlying the information disclos

  3. Slide 3: The Opportunity

    Slide 3: The Opportunity

    3 Zimbabwe Lithium is a development company with an experienced executive mining team, complemented by financial and capital markets experts. The THE company is focused on finding and acquiring battery metals projects amenable OPPORTUNITY to low-cost processing. The flagship project is the Kamativi

  4. Slide 4: Investment Highlights

    Slide 4: Investment Highlights

    4 • Development company with an experienced executive team consisting of metallurgical and mining engineers, financial and capital markets experts • Focused on finding and acquiring battery metals projects amenable to low-cost processing • Lead project – lithium (spodumene) recovery from old Kamativ

  5. Slide 5: Republic of Zimbabwe Facts & Mining Heritage

    Slide 5: Republic of Zimbabwe Facts & Mining Heritage

    5 REPUBLIC OF ZIMBABWE FACTS & MINING HERITAGE Land-locked country of 390,757 km2, population of 16 million (UN, 2012) & GNI per capita of $850 (2015) Official language is English, >2/3 speak Shona as a first language and >4/5 are Christians Multi-currency system; US$ and South African Rand dominate

  6. Slide 6: Kamativi Project Overview

    Slide 6: Kamativi Project Overview

    6 KAMATIVI PROJECT OVERVIEW 40 Year tin mining and gravity processing operation generated - 26.32 MT of tailings with an estimated grade of 0.58% Li2O Phased development plan for early production: 1 2 Resource validation from Phased development with Phase completed drilling program 1 DMS Phase 2 a D

  7. Slide 7: Kamativi Tailings Grab Sample Campaigns

    Slide 7: Kamativi Tailings Grab Sample Campaigns

    7 KAMATIVI TAILINGS GRAB SAMPLE CAMPAIGNS Zimbabwe Lithium Company (Mauritius/Zimbabwe) MSA Samples Description All data 2017 2016 2015 2017 Number of samples 28 8 8 2 10 Minimum 0.29% 0.32% 0.38% 0.74% 0.29% Maximum 1.13% 1.13% 0.99% 0.76% 0.75% Mean Li2O Grade 0.62% 0.61% 0.66% 0.75% 0.56%

  8. Slide 8: Kamativi Drilling Program

    Slide 8: Kamativi Drilling Program

    8 KAMATIVI DRILLING PROGRAM 1,865 meter cased auger drilling program completed MSA Group (Pty) Ltd, monitored the drilling and sampling program on site and is currently in progress on NI 43-101 Resource Statement Exploration target is set to be announced in September 2018 of between 23-25 Mt at a gr

  9. Slide 9: Mineralogy & Heavy Liquid Separation Test Work

    Slide 9: Mineralogy & Heavy Liquid Separation Test Work

    9 MINERALOGY & HEAVY LIQUID SEPARATION (HLS) TEST WORK Ten composite samples, selected by MSA Resource geologists were submitted to Geolabs Global (Pty) ltd for X-Ray Diffraction (“XRD”) analysis Final assay-validation constrained all lithium (“Li”) to Spodumene; effectively rendering it the only mi

  10. Slide 10: Kamativi Project 2018 Objectives Phase 1

    Slide 10: Kamativi Project 2018 Objectives Phase 1

    10 KAMATIVI PROJECT 2018 OBJECTIVES* PHASE 1 NI 43-101 resource estimate: Q3 2018 Financing Overview CAT $2M equity financing (400tph Plant feasibility funding): Q3 2018 ~$10 Million* off-take funding for Ph 1 DMS Plant: Q3/Q4 2018 Ph 1 production starting Q2 2019 (revenue generation): Dense media s

  11. Slide 11: Kamativi Project Objectives Phase 2

    Slide 11: Kamativi Project Objectives Phase 2

    11 KAMATIVI PROJECT OBJECTIVES* PHASE 2 Phase 2 investment cost estimated at ~$33M* for a 400 tph* DMS / Flotation Plant, including infrastructure upgrades. Low estimated CAPEX due to brownfield site benefits Closing of project financing (Debt & Equity) and begin procurement of 400 tph* DMS / Flotat

  12. Slide 12: CAT & ZIM Deal Structure Phase 1 & Phase 2

    Slide 12: CAT & ZIM Deal Structure Phase 1 & Phase 2

    12 CAT & ZIM DEAL STRUCTURE PH1 & PH 2 • As set out in the LOI and LOI Amendment the Parties will • Phase 2 of the contemplated Transaction will be triggered by now enter into Phase 1 of the Share Exchange. Mineral Resource Estimate by ZIM. • CAT to issue 19% of the current issued and outstanding CA

  13. Slide 13: Zimbabwe Politics & Risk Mitigation

    Slide 13: Zimbabwe Politics & Risk Mitigation

    13 Zimbabwe Politics & Risk Mitigation • Robert Mugabe dominated the country's political scene for almost four decades after independence from Britain in 1980 • After the military took charge November 2017, Mugabe resigned after 37 years in office • President Emmerson Mnangagwa nominated as interim

  14. Slide 14: Resource Statement

    Slide 14: Resource Statement

    14 RESOURCE STATEMENT NI 43-101 Resource Estimate: Completed Q3 2018 Indicated Resource: 26.32 Mt @ 0,58% Li2O @ 493ppm SnO2 Inferred Resource: 0,30 Mt @ 0,62% Li2O @ 544ppm SnO2

  15. Slide 15: Resource Statement: Grade-Tonnage Table

    Slide 15: Resource Statement: Grade-Tonnage Table

    RESOURCE STATEMENT ZIMBABWE Indicated Mineral Resource Grade-Tonnage Table Tonnes Density Li,0 (Millions) (%) um* 4 65 40 65 40 65 40 64 39 62 B 61 wT 59 36 58 4 56 33 55 32 53 32 52 32 52 32 52 ci 53 29 53 35 60 Goud cone (Chimata ——

  16. Slide 16: Concentrate Pricing

    Slide 16: Concentrate Pricing

    16 CONCENTRATE PRICING • Looking at Canaccord’s estimated 6% Spodumene Pricing, the forecast looks positive for the coming years. • Supply side concerns for Australia sees increased union activity and higher costs of production. • Argentinian market is experiencing economic unrest and high inflation

  17. Slide 17: EV and Electric Storage Solutions

    Slide 17: EV and Electric Storage Solutions

    17 EV AND ELECTRIC STORAGE SOLUTIONS EV Quick Facts The time to sell a million EV's is shortening. Cumulative global EV sales reached 4 millions in the end of August 2018 and expected to reach 5 millions in Q1 of 2019 It took five years to sell the first million electric vehicles. The last million w

  18. Slide 18: Corporate Social Responsibility

    Slide 18: Corporate Social Responsibility

    18 Chimata Gold Corp’s Sustainable Mineral Development Policy is a commitment to the community that it will: • Actively work with local residents and governments to ensure the Kamativi Project respects local priorities and advances local interests • Meet or exceed all regulatory requirements for pro

  19. Slide 19: Project Opportunity Summary

    Slide 19: Project Opportunity Summary

    19 PROJECT OPPORTUNITY SUMMARY • Lithium-bearing surface tailings stockpile with an • Risk mitigation through phased approach to project exploration target of ~26,32 Million tonnes grading development and capital spend 0.58% Li2O • Local exploration potential offers project upside - • Previously min

  20. Slide 20: Current CAT Management & Directors

    Slide 20: Current CAT Management & Directors

    20 CURRENT CAT MANAGEMENT & DIRECTORS President & CEO, Chairman Chief Financial Officer Director Director Successful entrepreneur and executive Over 30 years experience creating, Geologist with 30 yrs experience in Over 30 years geological experience for active in the financial sector for over 30 fi

  21. Slide 21: Zimbabwe Lithium Management & Directors

    Slide 21: Zimbabwe Lithium Management & Directors

    21 ZIMBABWE LITHIUM MANAGEMENT & DIRECTORS Managing Director in Zimbabwe Chief Operational Officer Founding Partner Founding Partner Agricultural Engineer with 32 yrs mining Over 35 yrs mining experience, including Mineral and Civil Engineering Over 15 yrs mining industry experience, experience. Own

  22. Slide 22: Summarized Transaction Terms

    Slide 22: Summarized Transaction Terms

    22 SUMMARIZED TRANSACTION TERMS • Binding LOI gives Chimata path to 100% ownership of Zimbabwe Lithium Co. Ltd., a private Mauritius company (Subject to Regulatory Approval) • Chimata has subscribed to an initial 19% of Zimbabwe Lithium's share capital in exchange for 19% of Chimata, calculated post

  23. Slide 23: Chimata Corporate Information

    Slide 23: Chimata Corporate Information

    23 Capital Structure (June 2018) and ESTIMATE Capital Structure Post Concurrent Financing Note: Figures are Estimates Only Subject to Change and Regulatory Approval June 2018 Shares CAT Concurrent Financing Share Issuance (total 39,152,270 18,000,000 Outstanding of CAD $1.8 Million @ $0.10) June 201

  24. Slide 24: Join Us

    Slide 24: Join Us

    24 JOIN US The Chimata and Zim Lithium Team in the EV and ESS Revolution in the development of a low cost, brownfield asset in beautiful Zimbabwe

  25. Slide 25: Keep in Touch

    Slide 25: Keep in Touch

    25 KEEP IN TOUCH Richard Groome +1 514 402-4405 [email protected] // http://chimatagoldcorp.com 202 - 905 West Broadway Vancouver, BC Canada V5Z 4M3

Source: company website

More decks from CAT Strategic Metals Corporation

All 12 CAT Strategic Metals decks