  1. Slide 1: Investor presentation, Credit Suisse Vail Conference

    Slide 1: Investor presentation, Credit Suisse Vail Conference

    Investor presentation Credit Suisse Vail Conference Meg Gentle, President & CEO NASDAQ: TELL Exhibit 99.1

  2. Slide 2: Notice

    Slide 2: Notice

    Notice This presentation has been prepared exclusively for informational purposes and does not constitute an offer to buy, sell or exchange any financial instruments. This presentation is not intended to provide legal, tax or investment advice. This presentation contains many forward-looking stateme

  3. Slide 3: Introducing Tellurian Inc. (NASDAQ: TELL)

    Slide 3: Introducing Tellurian Inc. (NASDAQ: TELL)

    Introducing Tellurian Inc. (NASDAQ: TELL) Inception: In February 2016, Charif Souki & Martin Houston co-founded Tellurian Investments Inc. Strategy: Low-cost LNG provider capable of optimizing an integrated value chain Project: Driftwood LNG (DWLNG), a 26 mtpa LNG export facility near Lake Charles,

  4. Slide 4: Global gas demand – expecting steady growth

    Slide 4: Global gas demand – expecting steady growth

    Global gas demand – expecting steady growth Source: BP Energy Outlook (2017), Wood Mackenzie (Q4 2016) 2015-2030 CAGR North America 1.2% S & C America 0.8% Europe 0.9% CIS 0.04% Middle East 2.2% Africa 3.0% Asia Pacific 2.9% Total 1.6% Incremental gas demand 2015-2030: 105 Bcf/d (785 mtpa) Average a

  5. Slide 5: Additional liquefaction construction required to meet the call on LNG by 2025

    Slide 5: Additional liquefaction construction required to meet the call on LNG by 2025

    90 mtpa additional liquefaction construction required to meet the call on LNG by 2025 (1) Source: BP Energy Outlook (2017), Wood Mackenzie (Q4 2016) (1) Note: 15 mtpa of incremental demand per year, over next 5 years, where consumption is 85% of plant capacity 2015-2030 CAGR North America 4.1% S & C

  6. Slide 6: Growth in Asia / Middle East LNG demand in 2016

    Slide 6: Growth in Asia / Middle East LNG demand in 2016

    12% Growth in Asia / Middle East LNG demand in 2016 Source: IHS Markit Waterborne 211

  7. Slide 7: Commodity prices improving from early 2016 lows

    Slide 7: Commodity prices improving from early 2016 lows

    Commodity prices improving from early 2016 lows Source(s): ICE, Platts via Globalview, Tellurian estimates

  8. Slide 8: Next generation liquefaction – Cost matters

    Slide 8: Next generation liquefaction – Cost matters

    Next generation liquefaction – Cost matters Source: IHS, Tellurian interpretation of the data; East Africa includes Coral FLNG $8.41 $8.37 $8.01 $7.95 $7.74 $0.00 $2.00 $4.00 $6.00 $8.00 $10.00 $12.00 Floating West Canada New Australia East Africa US GOM $/MMBtu Average est. DES to Asia breakeven co

  9. Slide 9: Seeking lowest cost gas supply

    Slide 9: Seeking lowest cost gas supply

    Seeking lowest cost gas supply . . . Source: Company data, Credit Suisse estimates, Tellurian Analysis assumes oil price of $50 / Bbl Lower service costs, improved technology and efficiency will improve netbacks over time

  10. Slide 10: Driftwood LNG: 26 mtpa LNG export facility in Louisiana

    Slide 10: Driftwood LNG: 26 mtpa LNG export facility in Louisiana

    Driftwood LNG: 26 mtpa LNG export facility in Louisiana Land: 1,000-acre site near Lake Charles, LA Liquefaction Nameplate Capacity: 26 mtpa Trains: 20 trains, each producing 1.3 mtpa 1.3 mtpa Chart heat exchangers GE LM6000 compressors Storage: 3 storage tanks, each 235,000 m3 Marine: 3 marine bert

  11. Slide 11: Key project partners

    Slide 11: Key project partners

    Key project partners EPC World leader in the LNG industry, and has built 41 trains producing 120 mtpa to date Founders have deep relationship with Bechtel: 15 trains with Tellurian’s executive team Bechtel expected to wrap the Chart technology liquefaction interface Liquefaction technology World-cla

  12. Slide 12: Driftwood LNG – estimated project timeline

    Slide 12: Driftwood LNG – estimated project timeline

    Driftwood LNG – estimated project timeline 2016 June FERC Pre-Filing Review Process 2017 Q1 FERC application filing 2018 Construction begins, pending regulatory approval 2022 First LNG plant operational 2023 Full pipeline operations 2025 All LNG plants operational Engineering Bechtel engaged to comp

  13. Slide 13: Driftwood LNG cost competitive

    Slide 13: Driftwood LNG cost competitive

    Driftwood LNG cost competitive Source: IHS, Tellurian Driftwood LNG Awaiting Final Investment Decision (FID) US Projects – Under construction

  14. Slide 14: Tellurian – value to shareholders

    Slide 14: Tellurian – value to shareholders

    Tellurian – value to shareholders Low Cost Supply Procure gas supply at lower cost than marginal production within US Low Cost Construction Work with contractors to lower capital spending to between $500 and $600 / tonne Low Cost Financing Efficient financing of project and simple capital structure

  15. Slide 15: Driftwood LNG – illustration of constructed facility

    Slide 15: Driftwood LNG – illustration of constructed facility

    Driftwood LNG – illustration of constructed facility

  16. Slide 16: Thank you

    Slide 16: Thank you

    TELLURIAN Thank you

  17. Slide 17: Investor Contacts

    Slide 17: Investor Contacts

    Investor Contacts Investor Relations Amit Marwaha, 832-485-2004 [email protected] David Castaneda, 414-351-9758 [email protected] Public Relations Joi Lecznar, 832-962-4044 [email protected]

  18. Slide 18: Appendix

    Slide 18: Appendix

    Appendix

  19. Slide 19: Corporate org chart

    Slide 19: Corporate org chart

    Corporate org chart (1) (1) Abbreviated. Tellurian Inc. (fka Magellan Petroleum Corp) Tellurian Investments Driftwood LNG Driftwood Pipeline NASDAQ: TELL 199,382,948 shares outstanding on Feb 10, 2017

  20. Slide 20: Charif Souki, Chairman and management biographies

    Slide 20: Charif Souki, Chairman and management biographies

    Charif Souki, Chairman Founded Cheniere Energy, the first LNG export company in the United States, growing it to a $9 Bn company while serving as CEO from 2002 to 2015 A lifelong entrepreneur, Charif has spent 20 years raising and investing capital in a range of industries globally Martin Houston, V

  21. Slide 21: Leadership team

    Slide 21: Leadership team

    Leadership team Antoine Lafargue, Chief Financial Officer Antoine became CFO of Tellurian Inc. on February 10, 2017. He served as Magellan Petroleum’s President, Chief Executive Officer, Chief Financial Officer, Treasurer and Corporate Secretary from August 5, 2016 to the merger with Tellurian Previ

  22. Slide 22: Experience matters

    Slide 22: Experience matters

    Experience matters Key management team World class leadership team Charif Souki Founder -Cheniere Energy Annualized equity CAGR ~40% from 2002-15 Martin Houston COO of BG Group, FTSE 10 company Pioneered destination flexible LNG Meg Gentle Former EVP Marketing/CFO at Cheniere Energy Structured >$25

  23. Slide 23: DWLNG vs. traditional LNG plant – design

    Slide 23: DWLNG vs. traditional LNG plant – design

    DWLNG vs. traditional LNG plant – design DWLNG layout: 5.2 mtpa Traditional layout: 4.5 mtpa GE LM6000 PF+ (x4): cheapest dollar per installed horsepower = more LNG production per acre Gas pre-treatment facility Chart cold boxes (x4): IPSMR technology uses single mixed refrigerant; design scaled up

  24. Slide 24: Timeline to FID and status

    Slide 24: Timeline to FID and status

    Timeline to FID and status 2017 2018 Winter/Spring Summer/Fall Winter/Spring Summer/Fall FERC Gastech EPC CWC World FERC NTP FID World Gas Conference Construction begins Marketing/SPAs Engineering Bechtel engaged to complete robust FEED Feb 2016 LSTK EPC Contract expected mid-2017 Notice to Proceed

  25. Slide 25: The world needs LNG – construction needs to start today

    Slide 25: The world needs LNG – construction needs to start today

    The world needs LNG – construction needs to start today Source: IHS, Tellurian New FIDs will be needed from 2018 if we are to keep the market in balance from 2021 onwards Assuming no new FIDs are sanctioned soon, the global LNG market will return to deficit by 2022+ New FIDs are necessary beginning

  26. Slide 26: Global LNG cost curve – DWLNG in lower quartile

    Slide 26: Global LNG cost curve – DWLNG in lower quartile

    Global LNG cost curve – DWLNG in lower quartile of potential FID projects Source: Citi, Wells Fargo, Tellurian Driftwood LNG

Source: SEC EDGAR · 8-K filed Feb 14, 2017