  1. Slide 1: Investor presentation – Scotia Howard Weil Conference

    Slide 1: Investor presentation – Scotia Howard Weil Conference

    Exhibit 99.1 NASDAQ: TELL Investor presentation Scotia Howard Weil Conference – March 27, 2017 Meg Gentle, President & CEO

  2. Slide 2: Notice

    Slide 2: Notice

    Notice 1934, “may,” things, forward-looking we results filed this statements. statements, accordance similarly GAAPbelieve presentation with asor The financial our “plan,” amended. titled performance the business are information The we with Securities appropriate measures disclaim “potential,” forwa

  3. Slide 3: Introducing Tellurian

    Slide 3: Introducing Tellurian

    Introducing Inception: Strategy: Project: Engineering Development Merger: shareholders Driftwood Tellurian Low-cost InTellurian and are February Funding: majority Construction: Investments LNG LNG Inc. 2016, $60 (DWLNG), provider owners (NASDAQ: million Charif and Bechtel, of capable Magellan contri

  4. Slide 4: Global gas demand growth

    Slide 4: Global gas demand growth

    GlobalAmerica North Europe gas 150demand 1000 1.2% 100 – Sexpecting S&&CCAmerica America steady0.8% 500 growth 50 3500 North Incremental AsiaAmerica Pacific gas 0400 0demand 1990 Europe 1995 2015-2030: 0.9% 2000 CIS 2005 0.04% 1052010 Bcf/d 3000 2015 (785 Africa 2020 mtpa) 350 2025 Average Middle 20

  5. Slide 5: LNG demand and new liquefaction required

    Slide 5: LNG demand and new liquefaction required

    90 mtpa 4.1% Europe supplied demand Average 30per additional from 200 year, new annual South over liquefaction LNGAmerica LNG next sources demand 5 years, 20 construction •100 90growth: where mtpa Northconsumption of2America required liquefaction Bcf/d (15 to 10meet is mtpa) 0 85% construction 0 200

  6. Slide 6: Growth in Asia / Middle East LNG demand in 2016

    Slide 6: Growth in Asia / Middle East LNG demand in 2016

    12% Growth in Asia / Middle East LNG demand in 2016 211 Source: IHS Markit Waterborne 6

  7. Slide 7: Commodity prices improving from early 2016 lows

    Slide 7: Commodity prices improving from early 2016 lows

    Commodity $/MMBtu $8 $10 $12 $6 $4 Apr-15 $- Source(s): JKMJul-15 11% Henry Brent 14% Hub Global ICE, prices Brent TTF Oct-15 Coal Platts energy improving $2Jan-16 viaprices Globalview, Apr-16 from andearly LNG Jul-16 Tellurian 2016 benchmark Oct-16 lows estimates Jan-177Apr-17 Jul-17 Oct-17 Jan-18

  8. Slide 8: Next generation liquefaction – cost matters

    Slide 8: Next generation liquefaction – cost matters

    Next generation Transport cost $6.00 liquefaction – Cost matters $/MMBtu Average est. DES to Asia breakeven costs for projects awaiting FID Assumes $50 / Bbl oil price environment $12.00 $10.00 $8.41 $8.37 $8.01 $7.95 $7.74 $8.00

  9. Slide 9: Seeking lowest cost gas supply

    Slide 9: Seeking lowest cost gas supply

    Seeking Henry after $3.64 Haynesville assumes transport, $3.19 Hub lowest oil Gas price $3.38 Eagle after-tax, cost Price of$3.00 Ford gas $50 Breakeven, Alpine supply /$3.00 full Bblcycle, •$3.10 High—Alpine .Lower . $/MMBtu . 15% $2.87 service IRR$2.92 $3.92 High—Barnett costs, $2.63 improved $2.7

  10. Slide 10: Driftwood LNG project overview

    Slide 10: Driftwood LNG project overview

    •Driftwood Trains: Land: 1,000-acre Liquefaction Storage: Marine: Pipeline: Estimated 20 3396 LNG: marine Cost: trains, storage mile Nameplate ~26 $500-600/tonne each site pipeline berths tanks, mtpa near producing for Capacity: each LNG ?Lake ~4 ship 235,000 Bcf/d export Charles, EPC docking 1.3 ~2

  11. Slide 11: Key project partners

    Slide 11: Key project partners

    Key Project EPC Liquefaction •Strategic 11 World World-class Founders Bechtel Driftwood GE Delivered Partnering Invested Globally project Oilpartners leader & Investor expected $25 $207 integrated have Gas refrigerant partners to LNG technology cold million in set million, has deep the to new box to

  12. Slide 12: Driftwood timeline

    Slide 12: Driftwood timeline

    Driftwood 2016 June Engineering $60 •marketing LNG Engaged MM FERC 2017 Sales Management, •Project LNG 2018 and Q1 Opportunistic Regulatory FERC Purchase –2022 estimated Proceed 2023 Construction friends LNG Agreements capital 2025 project with Marketing & family raising 2017 First timeline • Liquef

  13. Slide 13: Driftwood project cost competitive

    Slide 13: Driftwood project cost competitive

    Driftwood $/tonne US $3,000 $1,500 1995 $0 Alaska Russia 13 Source: Projects 1996 West $1,000 Brunei project LNG 1997 IHS, –Cameroon Under Darussalam $500 cost Tellurian cost 1998$3,500 construction competitive 1999 Canada United 2000West 2001 $2,500 Arab Mozambique 2002 Emirates Awaiting 2003Malays

  14. Slide 14: Tellurian value to shareholders

    Slide 14: Tellurian value to shareholders

    Tellurian Low Fast Mover Cost–Financing Supply Construction value Advantage to Procure shareholders Efficient Faster Work gas with to financing supply market contractors at lower than of project competing cost to lower and thansimple capital marginal projects capital spending –production expect stru

  15. Slide 15: Driftwood LNG – illustration of constructed facility

    Slide 15: Driftwood LNG – illustration of constructed facility

    Driftwood LNG – illustration of constructed facility 14 15

  16. Slide 16: Simple capital structure and key metrics

    Slide 16: Simple capital structure and key metrics

    Maintaining Equity Tellurian ESTIMATED (NASDAQ:TELL) Terminal Project preferred LNG Driftwood Pipeline Note: Project (1) Inc. equity debt Construction(1) Excludes equity Project Issuances(2) afinance KEY /Simple Terminal finance owners METRICS Pipeline Capital $/ton Construction & financing Structur

  17. Slide 17: DWLNG and pipeline key metrics

    Slide 17: DWLNG and pipeline key metrics

    DWLNG .N (1) (2) (3) presentation (4) 17otes: Assumes Estimated Subject EBITDA&toPipeline—Key for 200 isconstruction pricing calculated additional mm & common timing as information. costs Figures total shares ofbefore revenue capital outstanding. owners’ raise. (liquefaction, Assumes costs, financin

  18. Slide 18: Thank you

    Slide 18: Thank you

    Thank you

  19. Slide 19: Investor Relations contacts

    Slide 19: Investor Relations contacts

    Investor Amit David [email protected] Public [email protected] Joi [email protected] Lecznar, Marwaha, Castaneda, Relations Contacts Relations 832-962-4044 832-485-2004 414-351-9758

  20. Slide 20: Appendix

    Slide 20: Appendix

    19 20 Appendix

  21. Slide 21: Leadership

    Slide 21: Leadership

    Leadership Charif Martin Meg •Keith 21 A Founded Spent Conducted Previously Former Responsible lifelong Gentle, Teague, Souki, Houston, three EVP EVP, Cheniere team entrepreneur, served business CEO decades Chairman for Chief of Asset Vice Marketing the and as Energy, Operating Group development, at

  22. Slide 22: Leadership

    Slide 22: Leadership

    Leadership Antoine Officer, Pat seven •functions 22 Antoine Tarek Previously Joined Deep Patricia Her Spent Prior Outtrim, background US to operational joined 12 Chief Tellurian Lafargue, BG Cheniere, is for became LNG years team responsible served SVP its Group, Financial Tellurian import trading a

  23. Slide 23: Key experience and management bench strength

    Slide 23: Key experience and management bench strength

    Experience Key World ~40% Seasoned •Deep 23 Annualized Tarek Founder Keith Howard Mark Singapore management bench from class Stubbe Teague Souki management Candelet -Cheniere matters 2002-15 & leadership strength equity London • Daniel team •CAGR Energy •Marketing Pat Pioneered team •team Belhumeur

  24. Slide 24: DWLNG design advantages

    Slide 24: DWLNG design advantages

    DWLNG Larger Gas Redundancy GE horsepower 24 LM2500 pre-treatment footprint: vs.=necessary: layout: built-in: (x6): traditional circuits, 35.2 facility smaller cold mtpa ifto1boxes if LNG produce compressor 1entire turbine Traditional plant need circuit 4.5 Cold –compressor design mtpa islayout: is

  25. Slide 25: Timeline

    Slide 25: Timeline

    Timeline 2017 Winter/Spring Engineering Marketing/SPAs Liquefaction $60 $207 •Draft 25 World EPC LSTK Full Notice FERC MM2018 MM Resource FERC • FID Gas EPC •to Order Management, to Gastech Total Proceed FID Conference Regulatory Application development Contract Summer/Fall • Reports Arrange and • w

  26. Slide 26: The market needs new LNG projects

    Slide 26: The market needs new LNG projects

    Themarket New by Source: world FIDs IHS, balanced needs areTellurian LNGLNGjust projects –26as construction market underenters Assuming needs 2022+ tono start 2021+ newtoday FIDs balance are necessary beginning construction expected to sanctioned soon, the global LNG 2018 to keep LNG come online nex

  27. Slide 27: Global LNG cost curve

    Slide 27: Global LNG cost curve

    Global 90 100 Lake 80 Corpus $70 US Area (Br Breakeven, 40 30 20 Indonesia 010 Source: 260USA Kitimat 11% 10% 4Tangguh Browse 1Charles 6 and LNG 8Christi ralia Citi, 58% 10LNG Area Canada 12 (Train cost Wells FLNG 21% LNG (T4-5) 144(Downstream curve 16 PNG Fargo, Abadi 3) Africa/Aust Cameron Coral –

Source: SEC EDGAR · 8-K filed Mar 27, 2017