Dynegy Inc

Dynegy — Lehman Brothers 2006 CEO Energy/Power Conference

19 slides from Dynegy's conference presentation, Sep 6, 2006

  1. Slide 1: Lehman Brothers 2006 CEO Energy/Power Conference

    Slide 1: Lehman Brothers 2006 CEO Energy/Power Conference

    Exhibit 99.1 Lehman Brothers 2006 CEO Energy/Power Conference September 6, 2006 New York City Investor & Public Relations: John Sousa, Vice President Hillarie Forister, Senior Analyst (713) 507-6466 [email protected]

  2. Slide 2: Forward-Looking Statements

    Slide 2: Forward-Looking Statements

    FORWARD-LOOKING FORWARD-LOOKING STATEMENTS STATEMENTS This presentation contains statements reflecting assumptions, expectations, projections, intentions or beliefs about future events that are intended as “forward-looking statements.” You can identify these statements, including those relating to D

  3. Slide 3: 2006 Accomplishments to Date

    Slide 3: 2006 Accomplishments to Date

    2006 2006 ACCOMPLISHMENTS ACCOMPLISHMENTS TO TO DATE DATE Terminated Sterlington tolling contract, eliminating approximately $745 MM in future capacity payments Completed Rocky Road-West Coast Power asset exchange Announced Rockingham asset sale for $195 MM to Duke Energy subsidiary Announced agreem

  4. Slide 4: Liability Management Activities

    Slide 4: Liability Management Activities

    LIABILITY LIABILITY MANAGEMENT MANAGEMENT ACTIVITIES ACTIVITIES Refinanced credit agreement: $400 MM Revolving Credit Facility, resulting in return of $335 MM cash posted as collateral Repurchased $1.7 B Second Priority Notes, eliminating related restrictive covenants and liens Issued $750 MM Senior

  5. Slide 5: Debt and Other Obligations Chart – September 30, 2002

    Slide 5: Debt and Other Obligations Chart – September 30, 2002

    DEBT DEBT AND AND OTHER OTHER OBLIGATIONS OBLIGATIONS CHARTCHART –– SEPTEMBER SEPTEMBER 30, 30, 2002 2002 ($($ inin MM) MM) Dynegy Inc.. Total: $9.0 B CVX Convertible Preferred $1,500 Dynegy Global Comm. Dynegy Holdings Inc. Illinova Polaris Cr. Facility(1) $360 $900 MM Credit Facility(2) $0 Senior

  6. Slide 6: Debt and Other Obligations Chart – Current

    Slide 6: Debt and Other Obligations Chart – Current

    DEBT DEBT AND AND OTHER OTHER OBLIGATIONS OBLIGATIONS CHART CHART –– CURRENT CURRENT ($($ inin MM) MM) Dynegy Inc. Total: $4.2 B Dynegy Holdings Inc. Sithe Energies Revolver (1) $0 Senior Debentures $447 Synthetic LC Facility (2) $200 Term Loan (3) $150 Second Secured Notes $11 Sr. Unsec. Notes/Debe

  7. Slide 7: Upside Potential in 2007

    Slide 7: Upside Potential in 2007

    UPSIDE UPSIDE POTENTIAL POTENTIAL IN IN 2007 2007 Reductions: Additions: $225 MM SPNs at LIBOR + 6.5% $1,047 MM Unsec. Sr. Notes at 8.375% $614 MM SPNs at 9.875% due 2016 Lower Interest Expense/ $900 MM SPNs at 10.125% $200 MM Term LC at Net ~2.0% Series C Dividend $225 MM Conv. Debentures at 4.75%

  8. Slide 8: Today's Focus

    Slide 8: Today's Focus

    TODAY’S TODAY’S FOCUS FOCUS .. .. .. RESTRUCTURING / DELEVERAGING Operate Commercialize Run the Well Well Business Well Safety and efficiency Diversified approach to placing Manage costs, collateral and production into market capital Operational readiness Combination of mid-term and Maintain strong

  9. Slide 9: Appendix

    Slide 9: Appendix

    Appendix

  10. Slide 10: Power Generation Portfolio

    Slide 10: Power Generation Portfolio

    POWER POWER GENERATION GENERATION PORTFOLIO PORTFOLIO Diversified assets U.S. PORTFOLIO 12,820 net MW 33% baseload, 18% intermediate, 49% peaking 30% coal/oil, 17% dual fuel, Midwest WECC 53% gas 3,452 MW Coal/Oil MAIN 4,099 MW Gas Coal plants perform in Northeast current high gas price 1,340 MW Gas

  11. Slide 11: Commodity Pricing

    Slide 11: Commodity Pricing

    COMMODITY COMMODITY PRICING PRICING 2005 Actual 2006 Actual/Forward as of 7/11/06(1) 2006 Actual/Forward as of 8/29/06(2) Cin Hub/Cinergy New York Zone G ($/MWh) ($/MWh) $90 $125 $100 $60 $75 $50 $30 2005A: $63.65 2005A: $92.39 2006A/F (July): $50.39 $25 2006A/F (July): $76.88 2006A/F (Aug): $54.48

  12. Slide 12: 2006 Cash Flow Estimates: GAAP Basis

    Slide 12: 2006 Cash Flow Estimates: GAAP Basis

    2006 2006 CASH CASH FLOW FLOW ESTIMATES: ESTIMATES: GAAP GAAP BASIS BASIS As Presented August 9, 2006; Based on Price Curves as of July 11, 2006 ($ in millions) GEN CRM OTHER 2006 Total GAAP OCF $ 520-585 $ (420) $ (430-420) $ (330-255) GAAP ICF Capex - Maintenance (165) - (5) (170) Capex - Developm

  13. Slide 13: 2006 Earnings Estimates: GAAP Basis

    Slide 13: 2006 Earnings Estimates: GAAP Basis

    2006 2006 EARNINGS EARNINGS ESTIMATES: ESTIMATES: GAAP GAAP BASIS BASIS As Presented August 9, 2006; Based on Price Curves as of July 11, 2006 ($ in millions) Midwest Northeast South Total GEN CRM OTHER 2006 Total EBITDA Estimates $ 480-510 $ 95-115 $ (5)-5 $ 570-630 $5 $ (110-100) $ 465-535 Depreci

  14. Slide 14: Debt and Lease Obligations

    Slide 14: Debt and Lease Obligations

    DEBT DEBT AND AND LEASE LEASE OBLIGATIONS OBLIGATIONS ($($ inin MM) MM) $7,389 Net decrease in debt from 12/31/05 to 6/30/06 reflects the following: $5,617 $1.7 B repayment of SPNs $5,523 $225 MM repayment of convertible subordinated debentures $4,416 $4,197 $400 MM redemption of Series C preferred,

  15. Slide 15: Debt Maturity Profile

    Slide 15: Debt Maturity Profile

    DEBT DEBT MATURITY MATURITY PROFILE PROFILE ($($ inin MM) MM) $1,709 6/30/06: $3.6 B $775 $568 $192 $118 $82 $40 $57 $73 $10 $0 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016+ Pro forma: $3.4 B $1,597 $775 $568 $169 $73 $82 $40 $44 $57 $0 $0 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

  16. Slide 16: Collateral Posted

    Slide 16: Collateral Posted

    COLLATERAL COLLATERAL POSTED POSTED ($($ inin MM) MM) $600 12/31/05 6/30/06 8/4/06 $500 CRM $ 91 $ 56 $ 65 GEN 280 167 221 $400 NGL - - - Other 10 8 8 $300 Total $ 381 $ 231 $ 294 $200 Cash $ 122 $ 55 $ 59 $100 LCs 259 176 235 Total $ 381 $ 231 $ 294 $0 6/05 9/05 12/05 3/06 6/06 Collateral reduced f

  17. Slide 17: Liquidity

    Slide 17: Liquidity

    LIQUIDITY LIQUIDITY ($($ inin MM) MM) $1,913 $1,620 $846 $765 $580 6/30/05 9/30/05 12/31/05 3/31/06 6/30/06 Cash Availability Decrease in cash on hand from 3/31/06 primarily due to liability management activities and repayment of debt obligations, offset by receipt of proceeds from issuance of new u

  18. Slide 18: Dynegy Generation Facilities

    Slide 18: Dynegy Generation Facilities

    DYNEGY DYNEGY GENERATION GENERATION FACILITIES FACILITIES Net Primary Dispatch Previous New NERC (1) (2) (3) Region/Facility Location Capacity Fuel Type Type NERC Region Region (ISO) MIDWEST Baldwin Baldwin, IL 1,806 Coal Baseload MAIN (Midwest) SERC (MISO) Havana Units 1-5 Havana, IL 242 Oil Peakin

  19. Slide 19: Dynegy Generation Facilities (Continued)

    Slide 19: Dynegy Generation Facilities (Continued)

    DYNEGY DYNEGY GENERATION GENERATION FACILITIES FACILITIES (CONTINUED) (CONTINUED) Net Primary Dispatch Previous New NERC (1) (2) (3) Region/Facility Location Capacity Fuel Type Type NERC Region Region (ISO) SOUTH Calcasieu Sulphur, LA 347 Gas Peaking SERC (Southeast) SERC Heard County Heard Cty, GA

Source: SEC EDGAR · 8-K filed Sep 6, 2006

More decks from Dynegy Inc