ACS, Actividades de Construccion y Servicios SA · BME:ACS
ACS, Actividades de Construccion y Servicios SA — Investor Day (November 2026)
87 slides from ACS, Actividades de Construccion y Servicios SA's investor day presentation, Nov 12, 2026

Slide 1: 2026 Capital Markets Day
2026 Capital Markets Day NOVEMBER 12TH, 2026

Slide 2: CEO Opening
ACS CEO OPENING

Slide 3: Exceptional growth fueled by investment supercycle
EXCEPTIONAL GROWTH FUELED BY INVESTMENT SUPERCYCLE, WITH ACS UNIQUELY POSITIONED RESILIENCE THROUGH DIVERSIFICATION ACROSS SECTORS AND GEOGRAPHIES STRONG CASH AND PROFIT GENERATION, REINVESTED IN ASSETS AND CAPABILITIES AMBITIOUS TARGETS, IN LINE WITH THE TRAJECTORY DELIVERED TO DATE 33

Slide 4: CMD'24 targets: we have exceeded the targets we set
Our Results to Date CMD’24 TARGETS | WE HAVE EXCEEDED THE TARGETS WE SET REVENUES NET PROFIT NOCF BACKLOG €bn €bn €bn €bn CAGR CAGR CAGR .vs 14% CAGR 14% .vs 9% CAGR '24 CMD Target 20% '24 CMD Target 13% c. 56 c. 1.16 c. 2.3 c. 111 43-48 34 2026 0.85-1 69 '24 CMD 2026 TARGET 0.55 '24 CMD 1.0 TARGET

Slide 5: An outstanding journey since our 2024 CMD
Our Results to Date AN OUTSTANDING JOURNEY SINCE OUR 2024 CMD SELECTED EXAMPLES SCALING OUR EXTENDING OUR CONTINUING TO DEVELOPING NEXT LEADERSHIP IN CONCESSION RUNWAY LEAD IN DELIVERY GEN OF GREENFIELD KEY VERTICALS IN BROWNFIELD US contractor and #1 Backlog in AI, Digital SR 400 Express Lane EBITD

Slide 6: Strong growth momentum with €111bn backlog
Our Results to Date STRONG GROWTH MOMENTUM ACROSS OUR REGIONS AND VERTICALS, WITH €111BN BACKLOG Q3 2026 BACKLOG BY REGION AMERICA EUROPE APAC GLOBAL CAGR ‘22-'26 €65bn €22bn €24bn 13% Q3 2026 BACKLOG BY SECTOR TRANSPORTATION SUSTAINABLE ENERGY, WATER & OF AVIATION AI, DIGITAL & TECH OF NUCLEAR SECU

Slide 7: We are in an investment supercycle
Market context WE ARE IN AN INVESTMENT SUPERCYCLE | STRUCTURAL TAILWINDS IN OUR KEY SECTORS AND GEOGRAPHIES EXPAND OUR ADDRESSABLE MARKET GLOBAL ANNUAL MARKET EXPECTED IN 2030 UPGRADING AGEING DIGITAL, AI & TECH ENERGY INDUSTRIAL SOVEREIGNTY INFRASTRUCTURE DEVELOPMENT & ELECTRIFICATION & GEOPOLITICS

Slide 8: Our 2027–30 strategic priorities
Our strategy OUR 2027–30 STRATEGIC PRIORITIES E GR N 3 PILLARS OF OUR STRATEGY O ENABLERS O UP O AM NE TE ONE GROUP, ONE TEAM CAPTURE THE NEXT EXPAND OUR SCALE INFRA Further integrate our INFRA INVESTMENT COMPETITIVE INVESTMENT global capabilities SUPERCYCLE ADVANTAGE Attract, develop and retain

Slide 9: ACS' unique model: global integrated infrastructure group
Our strategy ACS model ACS' UNIQUE MODEL: GLOBAL INTEGRATED INFRASTRUCTURE GROUP WE SUPPORT OUR CLIENTS THROUGHOUT THE ENTIRE LIFECYCLE: DELIVERING, DEVELOPING & OPERATING CRITICAL INFRASTRUCTURE INFRA E2E ACROSS SECTORS AND GEOGRAPHIES DELIVERY 1 2 INVESTMENT GREENFIELD AND GROUP BROWNFIELD AMERICA

Slide 10: AI, Digital & Tech: growth in data center capacity is structural
Our strategy E2E Delivery AI, Digital & Tech AI, DIGITAL & TECH | GROWTH IN DATA CENTER CAPACITY IS STRUCTURAL AI AND DATA CENTER DEMAND TO REMAIN STRONG OVER TIME DRIVERS OF DEMAND Global data center power demand per year '24-'30 CAGR Committed multi-year investment 350 '26-'30 Firm commitments acr

Slide 11: AI, Digital & Tech: global market leaders expanding to Europe and APAC
Our strategy E2E Delivery AI, Digital & Tech AI, DIGITAL & TECH | WE ARE GLOBAL MARKET LEADERS, EXPANDING FROM AMERICA TO EUROPE AND APAC STRONG GROWTH IN DATA CENTERS IN ALL REGIONS Positioned with strongest clients: DATA CENTERS CAGR ‘26-’30 >65% of our DC backlog comes Revenue, €bn €27-30bn from

Slide 12: Energy, Water & Industrial: scaling capabilities in high growth infrastructure
Our strategy E2E Delivery Energy, Water & Industrial ENERGY, WATER & INDUSTRIAL | WE ARE SCALING OUR CAPABILITIES IN HIGH GROWTH CRITICAL INFRASTRUCTURE THAT SUPPORTS THE ECONOMY ACROSS AMERICAS, EU & APAC COORDINATED AS ONE GROUP LOCAL EXECUTION GR OUR AMBITION N E OU O BUSINESS DEVELOPMENT DEEP LO

Slide 13: Energy, Water & Industrial: strong momentum across segments
Our strategy E2E Delivery Energy, Water & Industrial ENERGY, WATER & INDUSTRIAL | STRONG MOMENTUM ACROSS SEGMENTS, REINFORCING OUR CREDENTIALS AMERICAS EUROPE APAC >15,000 km >1.4 GW >2,800 km c.2,000 MW >7,300 km >3 GW Overhead, HV lines under generation capacity built or HV & EHV line delivery cap

Slide 14: Nuclear: leveraging >70 years of expertise
Our strategy E2E Delivery Nuclear NUCLEAR | LEVERAGING >70 YEARS OF EXPERTISE IN NUCLEAR ENGINEERING & PROJECT DELIVERY TO BECOME E2E DELIVERY PARTNERS FOR OEM, UTILITIES & GOVERNMENTS >3,000 NUCLEAR PROJECTS IN >50 PLANTS WORLDWIDE ACROSS THE E2E LIFECYCLE AMERICAS EUROPE APAC OUR AMBITION Design G

Slide 15: Security & Defense: partner of choice for governments
Our strategy E2E Delivery Security & Defense SECURITY & DEFENSE | PARTNER OF CHOICE FOR GOVERNMENTS, DEFENSE PRIMES AND CRITICAL INFRASTRUCTURE OWNERS, SCALING INTO HIGHER-VALUE SERVICES >600 SECURITY AND DEFENSE PROJECTS EXECUTED AND IN EXECUTION ACROSS GEOGRAPHIES AMERICAS EUROPE APAC OUR AMBITION

Slide 16: Critical Minerals & Natural Resources: expanding exposure
Our strategy E2E Delivery Critical Minerals CRITICAL MINERALS & NATURAL RESOURCES | WE ARE EXPANDING OUR EXPOSURE TO STRATEGIC MINERALS & LEVERAGING ENGINEERING CAPABILITIES TO CONVERT TO EPCM OUR STRATEGY OUR AMBITION EXPAND EXPOSURE TO STRATEGIC MINERALS CAGR Backlog, €bn Focus on the high-growt

Slide 17: Critical Minerals: proven presence across minerals
Our strategy E2E Delivery Critical Min. & Nat. Resources CRITICAL MINERALS & NATURAL RESOURCES | PROVEN PRESENCE ACROSS MINERALS IN ANZ & NORTH AMERICA, SCALING INTO HIGH-GROWTH MARKETS IN SOUTH AMERICA & EUROPE ENGINEERING PROCESSING PROJECTS WON SINCE 2024, BY MINERAL AMERICAS EUROPE APAC 163 11 3

Slide 18: ACS E2E Delivery intrinsic value
Our strategy E2E Delivery ACS E2E DELIVERY INTRINSIC VALUE | ACS TO REACH €52-56BN INTRINSIC VALUE IN 2030 BASED ON SOTP ANALYSIS EBITDA 2026-2030 (excl. Infra) +€2.1bn € 5.4 bn by 2030 2030 ACS € 3.3 bn E2E Delivery Intrinsic Value (excl. infra assets) €52-56bn 2026E 2030E based on consensus multip

Slide 19: Infra assets: increased exposure to infrastructure development
Our strategy Infrastructure assets INFRA ASSETS | INCREASED EXPOSURE TO INFRASTRUCTURE DEVELOPMENT ACROSS TWO KEY SECTORS INFRA INVESTMENT DIGITAL & ENERGY INFRASTRUCTURE TRANSPORT & SOCIAL INFRASTRUCTURE LARGE SCALE DATA CENTERS GREENFIELD ➢ MANAGED LANES ➢ NEXT-GENERATION MOBILITY SMALL SCALE DATA

Slide 20: Greenfield digital & energy: development partner to tech players
Our strategy Infrastructure assets Greenfield GREENFIELD – DIGITAL & ENERGY | STRENGTHENING OUR LEADERSHIP AS DEVELOPMENT PARTNER TO LEADING TECH PLAYERS LARGE-SCALE SMALL SCALE DATA CENTERS DATA CENTERS Already achieved 2030 target of >2 GW IT across Coravel • 2 DCs commercialized under a 5 year

Slide 21: Greenfield transport & social infrastructure
Our strategy Infrastructure assets Greenfield GREENFIELD – TRANSPORT & SOCIAL INFRASTRUCTURE | €3BN INTRINSIC VALUE OF CURRENT PORTFOLIO ACHIEVED WITH ADDITIONAL C.80 PROJECTS IN PIPELINE CURRENT PORTFOLIO VALUE RECENT WINS CURRENT PIPELINE €3bn >80 >€63bn 32 >€13bn c.80 >€61bn Current Assets Asset

Slide 22: Greenfield intrinsic value by 2030 and 2035
Our strategy Infrastructure assets Greenfield GREENFIELD INTRINSIC VALUE | GREENFIELD INFRASTRUCTURE BUSINESS TO ACHIEVE AN INTRINSIC EQUITY VALUE OF C.€19BN BY 2030 AND €38-40BN BY 2035 DIGITAL & ENERGY INFRASTRUCTURE TRANSPORT & SOCIAL INFRA Small scale DCs €20-21bn Large Scale DCs Includes Corave

Slide 23: Abertis: brownfield arm provides long-term visibility
Our strategy Infrastructure assets Brownfield ABERTIS | OUR BROWNFIELD ARM PROVIDES LONG-TERM VISIBILITY, STABILITY AND RESILIENCE TO THE PORTFOLIO ABERTIS CONSOLIDATED EBITDA €bn 2018 CMD 2024 CMD 2026 8 c.50 years EBITDA Backlog / EBITDA ‘26E EBITDA 7 Backlog €49bn €135bn €226bn 6 EBITDA x4.6 Back

Slide 24: 2030 Targets
Targets 2030 TARGETS €bn 2026E 2030E CAGR Topline to grow >10% Revenue c. 56.0 84 - 86 >10% annually, with earnings growing faster and Operational generating cumulative Net Profit c. 1.16 2.2 – 2.4 18% - 20% 9-11bn NOCF over the 4-year period 4-year cumulative c. 5.91 9 – 11 NOCF Cum. ‘23-’26 Cum. ‘

Slide 25: Capital allocation: strong cashflow supports shareholder remuneration
Our strategy Capital allocation CAPITAL ALLOCATION | STRONG CASHFLOW SUPPORTS HIGHER SHAREHOLDER REMUNERATION & GROUP STRATEGIC PLANS Firepower to support growth and long-term value €bn, cumulative 2027-2030 Additional divestment optionality from selective liquid assets >0.5 Additional opportunities

Slide 26: c.3x value creation potential by 2030
Targets c.3x VALUE CREATION POTENTIAL BY 2030 EQUITY VALUE GROWTH AMBITION Growth in core infra sectors & geos €bn 77-81 Expansion in high growth verticals Today Margin improvement by shifting to E2E, €52-56bn 39-42 specialized delivery €45-48bn 25.8 Infra investments intrinsic value by Value materi

Slide 27: Our agenda for today
OUR AGENDA FOR TODAY SESSION SPEAKERS J. Santamaría CEO OPENING REMARKS ACS Group CEO M. Kuntz B. Kaplan J. Torka AI, DIGITAL & TECH GROWTH VERTICALS Global Head AI, Digital & Tech Turner MD Leighton Asia MD T. Scherman ENERGY, WATER & INDUSTRIAL Global Head EW&I I. Baldwin NUCLEAR Global Head Nucle

Slide 28: AI, Digital & Tech
ACS Al, DIGITAL & TECH

Slide 29: Demand remains strong for data centers
DEMAND REMAINS STRONG FOR DATA CENTERS AND OTHER ADVANCED TECHNOLOGY FACILITIES HIGH REVENUE CERTAINTY THROUGH 2030 PROVEN DATA CENTER TRACK RECORD, WITH >1,300 PROJECTS AND PARTNER OF CHOICE FOR HYPERSCALERS MARGIN EXPANSION AND DIFFERENTIATION VIA E2E SERVICES AND MODULAR DELIVERY 29

Slide 30: Partner of choice for hyperscalers
ACS IS THE PARTNER OF CHOICE FOR HYPERSCALERS, WITH SUSTAINED REVENUE AND BACKLOG GROWTH DATA CENTERS LEADING DATA CENTER CONTRACTOR WORLDWIDE REVENUE DC, €bn CAPACITY COMMISSIONED >20 GW OR UNDERWAY €17-18bn CAGR 112% PROJECTS EXECUTED OR >1,300 UNDER CONSTRUCTION €9bn BACKLOG, Q3 2026 €4bn >65% €2

Slide 31: >1,300 data center projects across geographies
>1,300 DATA CENTER PROJECTS BUILT OR UNDER CONSTRUCTION ACROSS GEOGRAPHIES TOTAL DATA CENTER PROJECTS, CONTRACTED AND IN PROGRESS AMERICAS EUROPE APAC >1,100 90 20 49 14 16 CONSTRUCTED IN PROGRESS 31

Slide 32: Double digit growth to €27-30bn revenue by 2030
DOUBLE DIGIT GROWTH ACROSS GEOGRAPHIES TO REACH €27-30BN EXPECTED REVENUE BY 2030 AMERICAS EUROPE APAC DCs revenue (€bn) CAGR DCs revenue (€bn) CAGR DCs revenue (€bn) CAGR 11% 25% 19% €23-24.5bn €2.5-3bn €2-2.5bn €15-15.5bn €1-1.5bn €8bn €1bn €1bn <€1bn 2025 2026E 2030E 2025 2026E 2030E 2025 2026E 2

Slide 33: High revenue certainty through end of decade
HIGH REVENUE CERTAINTY, LOCKING IN GROWTH THROUGH THE END OF THE DECADE CURRENT GROUP DC BACKLOG AND PROJECT LINE SIGHT €62bn BACKLOG BY CLIENT Q3 2026 % 2027-2028 revenues covered by current >90% backlog and project line BACKLOG €26bn 31% in sight (high probability) 2% 67% PROJECT LINE OF SIGHT €36

Slide 34: Data center demand remains strong, market set to double
DATA CENTER DEMAND REMAINS STRONG, MARKET SET TO DOUBLE BY 2030 DC CAPACITY EXPECTED TO ALMOST DOUBLE By 2030 BY 2030 UNDER CONSERVATIVE SCENARIO Global power demand for Data Centers based on Hyperscalers expected CapEx (GW IT) CLOUD IS BECOMING THE DEFAULT HOME FOR 70% CAGR Global data volume expec

Slide 35: Demand moves from training to inference
AS ENTERPRISES AND CONSUMERS ADOPT AI, DEMAND MOVES FROM TRAINING TO INFERENCE, AND CAPACITY GROWTH BECOMES TIED TO EVERYDAY USAGE Installed AI capacity is skewing towards Inference % share of installed AI capacity, by usage AI ENTERPRISE ADOPTION IS STILL c.10% EARLY Scaled enterprise adoption of A

Slide 36: Hyperscalers require partners who build faster at scale
HYPERSCALERS REQUIRE PARTNERS WHO CAN BUILD FASTER, CONSISTENTLY AND AT SCALE C.€1.2TN ANNUAL CAPEX COMMITTED BY HYPERSCALERS New capacity live within 12–24 months ON DATA CENTERS DECISION HYPERSCALERS ANNUAL CAPEX, €bn TO BUILD LIVE CAPACITY CAGR 12 MONTHS >24 MONTHS 13% 1,171 1,168 1,114 Delivery

Slide 37: Strategic priorities: extend advanced technology leadership
STRATEGIC PRIORITIES | ACS TO EXTEND ITS ADVANCED TECHNOLOGY LEADERSHIP GLOBALLY AS E2E PARTNER IN KEY MARKET SEGMENTS PILLARS OF OUR STRATEGY CAPTURE THE NEXT INFRA INVESTMENT EXPAND OUR COMPETITIVE ADVANTAGE SUPERCYCLE GROWING REVENUES GROWING MARGINS 01 03 LEVERAGE OUR LEADING US FURTHER EXPAND O

Slide 38: Integrated E2E modular delivery model
ACS' INTEGRATED E2E MODULAR DELIVERY MODEL ACHIEVES IMPROVED COST AND SCHEDULE CERTAINTY AND REDUCED LABOR REQUIREMENTS INTEGRATED MODULAR DELIVERY: MOVING FROM CONSTRUCTION MANAGER TO E2E DELIVERY MODEL AND MODULAR INTEGRATOR E2E delivery capabilities With facilities in every region To service our

Slide 39: Margin levers: expanding E2E offering
MARGIN LEVERS | WE ARE EXPANDING OUR E2E OFFERING, ADVANCING OUR CAPABILITIES ACROSS THE FULL PROJECT SCOPE PROVIDING CUSTOMER VALUE & GREATER MARGINS E2E CAPABILITIES TURNKEY DEVELOPMENT Full utilization of ACS resources SITE SELECTION JV between Turner and our local delivery entities DESIGN Design

Slide 40: Modularization addresses clients' urgent concerns
MODULARIZATION DIRECTLY ADDRESSES OUR CLIENTS MOST URGENT CONCERNS, AND ACS IS BEST POSITIONED TO DELIVER ACS MODULAR DELIVERY APPROACH | Modular EPC(M) integrator with capabilities expanding from Key results from design for manufacturing to commissioning, including, supply chain control and self-pe

Slide 41: Data center demand in APAC and modular construction
DATA CENTER DEMAND IN APAC SET TO ACCELERATE, MODULAR CONSTRUCTION WILL BE A KEY ENABLER TO DELIVER CAPACITY FASTER AND MORE PREDICTABLY APAC DEMAND EXPECTED TO DOUBLE OUR APAC MODULAR DELIVERY >21% APAC1 Data Center Regional CAGR ‘26-’30 Capacity (GW) DfMA & MIC 3D planning Commissioning production

Slide 42: Bringing our full offering together
CAPABILITIES DEPLOYED BRINGING OUR FULL MODULAR DESIGN & OFFERING TOGETHER ENGINEERING PROCUREMENT OFF-SITE MANUFACTURING [PLACEHOLDER] 90 day project with Meta SELF-PERFORM MEP COMMISSIONING 42

Slide 43: Key takeaways
WE ARE THE PARTNER OF CHOICE FOR 01 HYPERSCALERS AND TECHNOLOGY CLIENTS WE HAVE HIGH CERTAINTY INTO OUR 2030 KEY TAKEAWAYS 02 REVENUES, WITH HIGH-QUALITY CUSTOMERS WE CONTINUE EXPANDING MARGINS THANKS TO OUR 03 E2E SERVICES AND MODULAR DELIVERY 43

Slide 44: Energy, Water & Industrial Solutions
ENERGY, WATER & INDUSTRIAL SOLUTIONS 44

Slide 45: Global E2E offering with strong local execution
GLOBAL E2E OFFERING COMBINING GLOBAL CAPABILITIES WITH STRONG LOCAL EXECUTION CAPTURING A MULTIDECADE INVESTMENT SUPERCYCLE ACROSS SEVEN SEGMENTS HIGHER MARGINS THROUGH SELECTIVITY AND BALANCED RISK APPROACH 45

Slide 46: Global EW&I vertical brings specialized solutions
OUR GLOBAL ENERGY, WATER & INDUSTRIAL VERTICAL BRINGS SPECIALIZED SOLUTIONS TO OUR CLIENTS ACROSS KEY SECTORS, ROOTED IN LOCAL EXECUTION CAPABILITIES WE COMPETE IN SEVEN SEGMENTS GLOBAL ENGINEERING EXCELLENCE Specialized technologies & sector know-how World-class engineering & design capabilities Gr

Slide 47: Growing demand: unique investment supercycle
UNIQUE INVESTMENT SUPERCYCLE CREATING AN OPPORTUNITY FOR E2E INTEGRATED PLAYERS WITH SPECIALIZED CAPABILITIES DEMAND DRIVERS INVESTMENT OPPORTUNITY ELECTRIFICATION Transport, heat and industry move c.€1.4tn Global annual investment in electricity generation and PER YEAR infrastructure onto the grid

Slide 48: Strong investment programs across our three regions
MARKETS | STRONG INVESTMENT PROGRAMS ACROSS OUR THREE REGIONS EUROPE AMERICAS APAC c.€600bn >70,000 km >215,000 km needed this decade in EU-27 and UK grids, incl. transmission new HV lines in the US and Canada pipeline in the next 10 new transmission lines planned in India, Indonesia and & distribut

Slide 49: Strong momentum across segments, reinforcing credentials
Our strategy E2E Delivery Energy, Water & Industrial ENERGY, WATER & INDUSTRIAL | STRONG MOMENTUM ACROSS SEGMENTS, REINFORCING OUR CREDENTIALS AMERICAS EUROPE APAC >15,000 km >1.4 GW >2,800 km c.2,000 MW >7,300 km >3 GW Overhead, HV lines under generation capacity built or HV & EHV line delivery cap

Slide 50: Differentiated capabilities, strengthened
LONG-STANDING CORE GLOBAL SEGMENTS DIFFERENTIATED WATER RAIL ELECTRIFICATION & TRACKS CAPABILITIES, Water treatment, wastewater & desalination plants Water O&M Pump stations & conveyance Rail track and catenary Rail electrification & traction power Rail network maintenance STRENGTHENED

Slide 51: Global EW&I platform scaling to €8.5-9bn by 2030
OUR STRATEGY | WE HAVE BUILT A GLOBAL EW&I PLATFORM AND HAVE THE AMBITION TO SCALE IT TO €8.5-9BN BY 2030 PILLARS OF OUR STRATEGY OUR AMBITION Backlog, €bn CAGR CAPTURE THE NEXT INFRA EXPAND OUR COMPETITIVE 20% INVESTMENT SUPERCYCLE ADVANTAGE €8.5-9bn 01 03 STRENGTHEN E2E CAPABILITIES, SCALE T&D, FR

Slide 52: Strategic priorities: T&D, power and water
STRATEGIC PRIORITIES | FOCUS ON T&D, POWER AND WATER IN ALL OUR REGIONS, WHILE CAPTURING ADDITIONAL OPPORTUNITIES ACROSS OTHER SECTORS Focus Additional growth segments opportunities EUROPE AMERICAS APAC OUR GROWTH AMBITION • Scale HV lines and substations in Europe and the Americas ENERGY NETWORKS •

Slide 53: Profitability: higher margins through specialized E2E offering
PROFITABILITY | HIGHER MARGINS THROUGH A SPECIALIZED E2E OFFERING, HIGH- VALUE WORK AND SELECTIVE APPROACH SPECIALIZED E2E OFFERING 01 •• Highly specialized E2E offering enables higher profitability Standardized & modular solutions WE OFFER OUR CLIENTS DELIVERY HIGH-VALUE WORK CERTAINTY IN HIGHLY 02

Slide 54: Key takeaways
01 A MULTI-DECADE INVESTMENT OPPORTUNITY KEY TAKEAWAYS 02 UNIQUELY POSITIONED FOR GROWTH STRONG AMBITION, SUSTAINED IN STRONG 03 PROFITABILITY 54

Slide 55: Nuclear
ACS NUCLEAR

Slide 56: Ambition: Tier 1 global end-to-end nuclear delivery partner
OUR AMBITION: TO BECOME A TIER 1, GLOBAL END-TO- END NUCLEAR DELIVERY PARTNER FOR UTILITIES, OEMS AND GOVERNMENTS IN LARGE SCALE AND SMR INTEGRATING OUR NUCLEAR CAPABILITIES IN COLLABORATION WITH LOCAL ENTITIES MAJOR CONTRACTS ALREADY SECURED WITH ACS AS DELIVERY PARTNER 56

Slide 57: Nuclear capacity set to grow up to c.3x by 2050
NUCLEAR CAPACITY IS SET TO GROW BY UP TO C.3X BY 2050, RISING ENERGY DEMAND AND SECURITY CONCERNS ARE REIGNITING NUCLEAR'S STRATEGIC ROLE NUCLEAR IS KEY TO ACHIEVING GLOBAL STRATEGIC OBJECTIVES SECTOR IS POISED FOR SUSTAINED GROWTH TO 2050 Delivering unmatched energy density and reliable World nucle

Slide 58: ACS Nuclear: new global nuclear platform
ACS NUCLEAR | A NEW GLOBAL NUCLEAR PLATFORM DELIVERING E2E SERVICES, PARTNERING WITH OUR LOCAL ENTITIES ONE GLOBAL NUCLEAR PLATFORM ACS Nuclear One business with the scale our customers need as delivery partners, both in LSR and SMR Global EPCM delivering E2E services partnering with ACS Group local

Slide 59: >3,000 nuclear projects in >50 power plants
MAPA FINAL EXTENSIVE EXPERIENCE | >3,000 NUCLEAR PROJECTS IN >50 POWER PLANTS NUCLEAR PROJECTS BY REGION AND TYPE OF SERVICE Design Build Design & build Modified/maint. Decommissioning EPCM/programme Other AMERICAS EUROPE APAC STRONG EXPERIENCE IN ENGINEERING & CONSTRUCT. >50 Nuclear power plants >3

Slide 60: >140 active nuclear projects across value chain
ACTIVE PROJECTS | >140 2026 NUCLEAR PROJECTS ACROSS THE FULL VALUE CHAIN Selected examples on projects MODIFICATIONS & DESIGN & ENGINEERING CONSTRUCTION DECOMMISSIONING MAINTENANCE Structural analysis, permitting Civil works, concrete structures Lifetime extensions, retrofits and Decontamination and

Slide 61: Strategic priorities: E2E delivery partner, €8-9bn backlog by 2030
STRATEGIC PRIORITIES | ACS NUCLEAR POSITIONED AS E2E DELIVERY PARTNER FOR OEMS, UTILITIES AND GOVERNMENTS, REACHING €8-9BN IN BACKLOG BY 2030 PILLARS OF OUR STRATEGY OUR AMBITION Backlog, €bn CAGR +34% CAPTURE THE NEXT INFRA EXPAND OUR COMPETITIVE INVESTMENT SUPERCYCLE ADVANTAGE €8-9bn 01 03 LEVERAG

Slide 62: Right to win: specialized engineering expertise
RIGHT TO WIN | OUR SPECIALIZED ENGINEERING EXPERTISE SETS THE BASE, OUR E2E DELIVERY CAPABILITIES SET US APART E2E DELIVERY AT SCALE THAT OEMS AND UTILITIES NEED ACS NUCLEAR INTEGRATES SPECIALIST WHAT UTILITIES AND OEMS NEED ACS NUCLEAR INTEGRATING NUCLEAR ENGINEERING CAPABILITIES Reliable partners

Slide 63: Targeting new build, SMRs, life-cycle services and defense
WE ARE TARGETING OPPORTUNITIES ACROSS NEW BUILD, SMRS, LIFE-CYCLE SERVICES AND DEFENSE Security & Defense Large new build SMR Life-cycle services nuclear infra Revenue Large, long programmes Repeatable fleets Recurring, government-funded Long-term, sovereign profile Our • Civil and structures, scali

Slide 64: Key takeaways
ACS NUCLEAR AS THE INTEGRATOR TO BRING ALL OF 01 THE GROUP’S NUCLEAR CAPABILITIES IN ONE OFFERING BECOMING AN EPCM LEADER, BACKED BY OUR KEY TAKEAWAYS 02 OWN ENGINEERING AND CIVIL CAPABILITIES WE HAVE ALREADY ESTABLISHED PARTNERSHIPS 03 WITH UTILITIES AND OEMs AROUND THE WORLD 64

Slide 65: Security & Defense
ACS SECURITY & DEFENSE

Slide 66: Multi-decade investment for security & defense infrastructure
UNPRECEDENTED, MULTI-DECADE INVESTMENT FOR SECURITY & DEFENSE INFRASTRUCTURE ACROSS OUR CORE GEOGRAPHIES PROVEN END-TO-END DELIVERY AT SCALE, >600 COMPLETED AND CONTRACTED PROJECTS SCALING AS E2E PARTNER FOR GOVERNMENTS, DEFENSE PRIMES, AND CRITICAL INFRA OWNERS 66

Slide 67: Security and Defense
SECURITY The enduring capabilities to protect people, preserve peace and AND strengthen deterrence DEFENSE Delivered through engineering, construction and technology integration Enabling armed forces, supporting public safety and sustaining the essential functions of society 67

Slide 68: Growth opportunity: defense is a large, resilient market
GROWTH OPPORTUNITY | DEFENSE IS A LARGE, POLICY-ANCHORED, RESILIENT MARKET IN OUR CORE GEOGRAPHIES PROJECTED GROWTH IN DEFENSE INFRASTRUCTURE SPEND FOCUS MARKETS (2026-2030E, €bn) LARGE AND GROWING MARKET €105-120bn Europe Annual spend on defense infra., in 2030 in our core geographies; >14% annual

Slide 69: >600 security and defense projects completed and contracted
OUR EXPERIENCE | >600 SECURITY AND DEFENSE PROJECTS COMPLETED AND CONTRACTED ACROSS OUR CORE GEOGRAPHIES TOTAL SECURITY AND DEFENSE PROJECTS, COMPLETED AND CONTRACTED PROJECT AMERICAS EUROPE APAC 154 Total 82 366 Total Total FROM SINGLE-COMPANY WINS TO JOINT PURSUITS AT SCALE Note: projects include

Slide 70: Right to win: local credentials and global capabilities
RIGHT TO WIN | LOCAL CREDENTIALS AND GLOBAL CAPABILITIES SET ACS APART ONE GROUP ACROSS THE FULL LIFE OF A DEFENSE ASSET PLANNED OFFERING ENGINEER BUILD INTEGRATE SUSTAIN PROTECT Complex design for Develop and selectively Secure networks, sensors, Operate and maintain Strengthen critical secure, har

Slide 71: Strategic priorities: doubling defense backlog
STRATEGIC PRIORITIES | DOUBLING OUR DEFENSE BACKLOG WHILE EXPANDING INTO HIGHER-VALUE SERVICES OUR AMBITION PILLARS OF OUR STRATEGY Backlog, €bn CAGR CAPTURE THE NEXT INFRA EXPAND OUR COMPETITIVE 20% €10-11bn INVESTMENT SUPERCYCLE ADVANTAGE 01 03 Become partner of choice for governments, Expand into

Slide 72: Where we focus: defense infrastructure and adjacent services
WHERE WE FOCUS | SCALE DEFENSE INFRASTRUCTURE, THEN ADD HIGHER-MARGIN ADJACENT SERVICES DEFENSE INFRASTRUCTURE ADJACENT SERVICES BASES SHIPYARDS AIRFIELDS LOGISTICS MAINTENANCE TECHNOLOGY Secure networks, INTEGRATION sensors Barracks Dry docks Runways Fuel networks Aircraft hangars Physical protecti

Slide 73: How we execute: three-tiered strategy
HOW WE EXECUTE | THREE-TIERED STRATEGY TO BECOME STRATEGIC PARTNER TO DEFENSE CUSTOMERS BY 2030 BUILD ON OUR GROW WHERE SCALE TO SYSTEMS EXPERTISE WE WIN INTEGRATOR Lead next wave of infra defense Bring integration, sustainment and Integrate technology and programs in our core private finance into m

Slide 74: Key takeaways
SECURITY AND DEFENSE IS A LARGE MARKET, 01 MULTI-DECADE INVESTMENT ACROSS OUR CORE GEOGRAPHIES WE ALREADY DELIVER ON DEFENSE: €5BN OF KEY TAKEAWAYS 02 BACKLOG ACROSS ALL THREE MARKETS, WITH WINS SUCH AS PEARL HARBOR STRONG BACKLOG GROWTH AHEAD, TARGETING 03 €10-11BN BY 2030 74

Slide 75: Critical Minerals & Natural Resources
CRITICAL MINERALS & NATURAL RESOURCES 75

Slide 76: Growth sectors fuel demand for critical minerals
TODAY’S GROWTH SECTORS & RE-INDUSTRIALISATION FUEL THE INCREASING DEMAND FOR CRITICAL MINERALS ENGINEERING, DELIVERY AND FIELD OPERATIONS IN A UNIQUE END-TO-END OFFERING STRONG GLOBAL PLATFORM, TECHNOLOGY ENABLED, FOCUSING ON GROWTH & RESILIENT CASHFLOWS 76

Slide 77: Natural resources and critical minerals essential for all verticals
MARKET OPPORTUNITY | NATURAL RESOURCES AND CRITICAL MINERALS HAVE BECOME ESSENTIAL FOR ALL OUR VERTICALS AND ECONOMY AT LARGE ESSENTIAL FOR STRATEGIC SUPPLY CHAINS LITHIUM, Others including COPPER GRAPHITE & RARE-EARTHS PHOSPHATE VANADIUM AND MANGANESE ZINC c.7mn tons c.6x c.2x c.10mn tons per year

Slide 78: Capital is being mobilized into our geographies
MARKET OPPORTUNITY | CAPITAL IS BEING MOBILIZED INTO OUR GEOGRAPHIES Selected examples of Government funding programs to unlock private capital NORTH AMERICA APAC c.€36bn across 160 US minerals deals c.€4.4bn Australian tax credit on since Jan-25 processing, to 2040 c.€300-340bn c.€11bn Project Vaul

Slide 79: Global footprint: strong position in APAC and Americas
GLOBAL FOOTPRINT | STRONG & GROWING POSITION IN APAC AND AMERICAS, WITH CONTINUED GROWTH IN EUROPE ENGINEERING PROCESSING PROJECTS WON SINCE 2024, BY MINERAL AMERICAS EUROPE APAC 163 11 342 IRON ZINC & RARE BAUXITE & MINERAL MET. OTHER 55 COPPER 47 LITHIUM 37 24 GOLD 15 14 POTASH 13 VANADIUM 13 9 AN

Slide 80: Strategic priorities: expand exposure to high-growth minerals
STRATEGIC PRIORITIES | EXPAND GLOBAL EXPOSURE TO HIGH-GROWTH MINERALS AND SERVE OUR CLIENTS ACROSS FULL LIFECYCLE PILLARS OF OUR CRITICAL MINERALS & NATURAL RESOURCES STRATEGY OUR AMBITION Backlog, €bn CAPTURE THE NEXT INFRA EXPAND OUR COMPETITIVE CAGR 10% INVESTMENT SUPERCYCLE ADVANTAGE €12-13bn 01

Slide 81: Strategic priorities: expand EPCM and operations
STRATEGIC PRIORITIES | EXPAND EPCM & OPERATIONS ACROSS A BALANCED AND WELL-DIVERSIFIED PORTFOLIO EXPAND EPCM AND PROCESS ENGINEERING CAPABILITIES ACROSS ALL PRIORITY MINERALS STRATEGIC Leverage specialist mining and mineral-processing expertise and ACS Group’s global footprint to convert early-stage

Slide 82: Process engineering & E2E project delivery
INTEGRATED OFFERING | WE BRING A GLOBALLY UNIQUE INTEGRATED END-TO-END CAPABILITY FULL END-TO-END SOLUTIONS SERVICES: FROM EARLY STUDIES TO FINAL REHABILITATION PROCESS ENGINEERING & ENGINEERING-LED GLOBAL E2E PROJECT DELIVERY FIELD OPERATIONS High value-add engineering and processing expertise

Slide 83: Broadening capabilities into EPCM-like contracts
PROCESS ENGINEERING & E2E PROJECT DELIVERY | BROADENING OUR CAPABILITIES INTO EPCM-LIKE CONTRACTS FOR HIGHER VALUE AT LOW RISK WE COVER THE COMPLETE MINERAL SCALING THIS PLATFORM THROUGH 5 DIFFERENTIATORS PROCESSING PLANT LIFECYCLE E2E offering as the business model 01 Studies prove our value and de

Slide 84: Field operations: stable, inflation protected revenues
FIELD OPERATIONS | LEADING GLOBAL PLAYER, WITH STABLE, INFLATION PROTECTED REVENUES AND HIGH CASH CONVERSION, PROVIDING RESILIENCE RECURRING CASH FLOWS FROM MISSION-CRITICAL SERVICES Field operations and asset-management services embedded in €8bn 2.5x c.88% BACKLOG Q3 2026 BACKLOG/REVENUE REVENUE FR

Slide 85: Field operations: integrated platform across full lifecycle
FIELD OPERATIONS | AN INTEGRATED PLATFORM ACROSS THE FULL LIFECYCLE SIX CAPABILITY THEMES ACROSS THE FULL LIFECYCLE 01 EARLY ENGAGEMENT & TECHNICAL SERVICES Operations planning, ECI, fleet strategy, constructability and optimisation 02 PROJECT DEVELOPMENT & TURNKEY DELIVERY Site establishment, infra

Slide 86: Critical minerals takeaways
UNPRECEDENTED OPPORTUNITIES IN CRITICAL 01 MINERALS & RESOURCES CRITICAL MINERALS UNIQUE & PROVEN END-TO-END PLATFORM TAKEAWAYS 02 ACROSS THE SUPPLY CHAIN GLOBAL CAPABILITY TO SCALE & CAPTURE 03 THE CRITICAL MINERALS OPPORTUNITIES 86

Slide 87: @ACS
@ACS
Source: company website
More decks from ACS, Actividades de Construccion y Servicios SA
Investor Day (November 2026)177 slides · Nov 12, 2026
Investor Day (November 2026)104 slides · Nov 12, 2026
Investor Day (November 2026)14 slides · Nov 12, 2026
Investor Day (November 2026)17 slides · Nov 12, 2026
Investor Day (November 2026)13 slides · Nov 12, 2026
Investor Day (November 2026)17 slides · Nov 12, 2026
All 139 ACS, Actividades de Construccion y Servicios SA decks