Kansas City Southern

Kansas City Southern — Raymond James 40th Annual Institutional Investors Conference (March 2019)

14 slides from Kansas City Southern's conference presentation, Mar 4, 2019

  1. Slide 1: Kansas City Southern – Raymond James 40th Annual Institutional Investors Conference

    Slide 1: Kansas City Southern – Raymond James 40th Annual Institutional Investors Conference

    Kansas City Southern March 4, 2019 Raymond James 40th Annual Institutional Investors Conference Exhibit 99.1

  2. Slide 2: Safe Harbor Statement

    Slide 2: Safe Harbor Statement

    Safe Harbor Statement This presentation contains “forward-looking statements” within the meaning of the securities laws concerning potential future events involving KCS and its subsidiaries, which could materially differ from the events that actually occur. Words such as “projects,” “estimates,” “fo

  3. Slide 3: PSR at KCS: Better railroading for more reliable service and growth

    Slide 3: PSR at KCS: Better railroading for more reliable service and growth

    PSR at KCS: Better railroading for more reliable service and growth Customer focused Improve and sustain consistency & reliability of service Create a more resilient and dependable network Facilitate Growth Additional capacity for new opportunities Improve asset utilization Be able to meet growing d

  4. Slide 4: Volumes off to a slow start due to Michoacán blockages, but YOY performance improving

    Slide 4: Volumes off to a slow start due to Michoacán blockages, but YOY performance improving

    Volumes off to a slow start due to Michoacán blockages, but YOY performance is improving Impact of blockages ~5 cents to Q119 EPS Business Update Positive mix impact from growth in high RPU business, including refined products, coal & grain Expect YOY headcount reduction in FY 2019

  5. Slide 5: KCS gap analysis – how does KCS’ cost structure stack up against peers?

    Slide 5: KCS gap analysis – how does KCS’ cost structure stack up against peers?

    KCS gap analysis – how does KCS’ cost structure stack up against peers? Category OpEx as % of Revenue (FY18) KCS Cons Industry Average* (ex. KCS) Gap to Industry Average 18.3% 22.1% --- 17.2% 17.1% $3M 11.4% 11.2% $5M 4.6% 3.2% $39M 12.8% 9.8% $81M 64.3% 63.5% 80 bps *Industry average represents sim

  6. Slide 6: KCS gap analysis – cost structure compared to industry best O/R

    Slide 6: KCS gap analysis – cost structure compared to industry best O/R

    KCS gap analysis – how does KCS’ cost structure compare to industry best O/R (CSX, CN, CP)? Category OpEx as % of Revenue (FY18) KCS Top 3* Gap vs. Top 3 18.3% 20.8% --- 17.2% 16.9% $7M 11.4% 11.1% $10M 4.6% 2.8% $51M 12.8% 9.9% $78M 64.3% 61.4% 290 bps *Top 3 average represents simple average. OR’s

  7. Slide 7: PSR Cost Savings Opportunity Categories

    Slide 7: PSR Cost Savings Opportunity Categories

    PSR Cost Savings Opportunity Categories Category 2018 Avg/Total 2018 Expense* *2018 Expense Includes Depreciation Yard Employees ~1,600 Active T&E ~150 Support Employees ~$115M Line of Road Employees ~1,700 Active T&E ~170 Support Employees ~$160M Locomotives ~1,100 Locomotives ~$180M Freight Cars ~

  8. Slide 8: PSR leadership team and initiatives

    Slide 8: PSR leadership team and initiatives

    Mike Naatz EVP & CMO Sameh Fahmy EVP of PSR Pat Ottensmeyer President & CEO Implement service design changes Reduce active locomotive fleet Reduce locomotive failure rate Store/dispose of equipment & reduce cars online Improve labor productivity Optimize vendor contracts Jeff Songer EVP & COO Mike U

  9. Slide 9: Operating Metrics

    Slide 9: Operating Metrics

    Operating Metrics Train Velocity (mph) Dwell (hrs) YTD 2019 dwell of 22.4 hours Improved by 14% sequentially and 3% YoY Driven by continued improvement at the Monterrey and Sanchez terminals, and early benefits of PSR initiatives YTD 2019 velocity of 27.5 MPH Improved by 3% sequentially; roughly fla

  10. Slide 10: PSR metrics and targets

    Slide 10: PSR metrics and targets

    Metric 2018 Targets Gross velocity (m.p.h.) 11.1 TBD Terminal dwell (hours) 25.0 Train length (feet) 5,505 Cars online per revenue carload 1.31 Fuel efficiency 1.35 Monthly carloads / FTE 26.8 KCS is evaluating key metrics to measure PSR progress & performance Once targets are finalized for each met

  11. Slide 11: Active locomotive fleet rationalization providing immediate benefit to cost structure

    Slide 11: Active locomotive fleet rationalization providing immediate benefit to cost structure

    KCS started its rationalization effort with a fleet of ~1,100 locomotives; goal to have a fleet size of <1,000 KCS’ initial net reduction is estimated to be ~75 locomotives KCS remaining fleet will include our most reliable, fuel-efficient horsepower Active locomotive fleet rationalization providing

  12. Slide 12: Initial service design focusing on Mexico Intermodal & Manifest trains

    Slide 12: Initial service design focusing on Mexico Intermodal & Manifest trains

    Initial service design focusing on Mexico Intermodal & Manifest trains; these trains offer the most opportunity for service consolidation Changes to service design driving network efficiencies & cost reductions Actions taken: Improve utilization of intermodal trains Consolidate traffic with like des

  13. Slide 13: Key takeaways from KCS’ PSR implementation

    Slide 13: Key takeaways from KCS’ PSR implementation

    Key takeaways from KCS’ PSR implementation PSR is a cross-functional effort to balance customer service, facilitate growth, reduce costs and improve capital efficiency Initial PSR initiatives focused on reducing long dwelling cars, unassigned locomotives and train delays Customer service and operati

  14. Slide 14: ©2019 Kansas City Southern

    Slide 14: ©2019 Kansas City Southern

    ©2019 Kansas City Southern

Source: SEC EDGAR · 8-K filed Mar 4, 2019

More decks from Kansas City Southern