ACS, Actividades de Construccion y Servicios SA · BME:ACS

ACS, Actividades de Construccion y Servicios SA — Investor Day (April 2024)

29 slides from ACS, Actividades de Construccion y Servicios SA's investor day presentation, Apr 17, 2024

  1. Slide 1: Capital Markets Day: Integrated Solutions - CIMIC

    Slide 1: Capital Markets Day: Integrated Solutions - CIMIC

    Capital Markets Day Integrated Solutions - CIMIC 17th April 2024 1

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    Disclaimer This document and any related conference call or webcast (including any related Q&A session) has been prepared by ACS, Actividades de Construcción y Servicios, S.A. (hereinafter “ACS” or “the Company”, and in conjunction with its subsidiaries the “ACS Group”) exclusively for been used dur

  3. Slide 3: Agenda

    Slide 3: Agenda

    Agenda CIMIC Today Key Differentiators 33

  4. Slide 4: CIMIC at a glance

    Slide 4: CIMIC at a glance

    125+ ~12% Years Largest Australasian FY23 revenues player providing in Asia engineering-led 30k+ integrated solutions and Employees ~1% critical minerals related- FY23 revenues services ~87% in RoW A$13.3bn Consolidated Revenues FY23 revenues in Australia & NZ 44

  5. Slide 5: Our client-first focus has contributed to build our unparalleled reputation in the region

    Slide 5: Our client-first focus has contributed to build our unparalleled reputation in the region

    Our client-first focus has contributed to build our unparalleled reputation in the region 70+ 86% ~90% 2/3 years of long-standing of projects with of service contracts of projects executed relationships with repeat clients renewed over the past for governments our oldest clients 5 years 55

  6. Slide 6: Robust performance in 2023 through disciplined delivery, cost control and risk management

    Slide 6: Robust performance in 2023 through disciplined delivery, cost control and risk management

    Robust performance in 2023 through disciplined delivery, cost control and risk management A$13.3 A$494 A$113 A$32 bn mn mn bn (3.7%) 2023 Consolidated Profit Before Net Operating Backlog3 Revenues 1 Taxes Cash Flow 2 1. Excluding Thiess, & other JV & associates which in 2023 were not consolidated in

  7. Slide 7: We are continuously increasing our activities in next-generation sectors

    Slide 7: We are continuously increasing our activities in next-generation sectors

    We are continuously increasing our activities in next-generation sectors Backlog Energy Transition: development and A$30.4Bn A$31.7Bn delivery of renewable energy 1 infrastructure Next 19% 23% Sustainable Mobility Gen Humelink, Victoria Big Battery 5% 2% 47% Energy Transition 33% 3% 4% 8% Critical M

  8. Slide 8: Growth outlook supported by solid structural fundamentals in Australia

    Slide 8: Growth outlook supported by solid structural fundamentals in Australia

    Growth outlook supported by solid structural fundamentals in Australia A$790 1.8x +6% +5% bn Projected population Total investment outlook CAGR in megaprojects CAGR in defense growth by 2070 infra construction construction1 spending in Australia (vs. 2024) (2024-2028) (2024-2028) (2024-2028) 1. Proj

  9. Slide 9: Three building blocks of our value proposition

    Slide 9: Three building blocks of our value proposition

    Three building blocks of our value proposition Engineering-led services Natural resources Engineering & construction Value-added engineering-led Global sustainable mining Engineering & construction services in high-tech infra & and mineral services of critical long-term mineral processing solutions

  10. Slide 10: UGL, Sedgman and Leighton are pioneers in engineering-led services

    Slide 10: UGL, Sedgman and Leighton are pioneers in engineering-led services

    UGL, Sedgman 125 years of experience 45 years of experience 49 years of experience and Leighton are pioneers in engineering-led services for clients in energy, Australian leader for high High-tech infra specialist with mobility and value-added engineering-led Global provider of integrated mineral pr

  11. Slide 11: Thiess is the global leader in diversified mining services

    Slide 11: Thiess is the global leader in diversified mining services

    Thiess is the global 90 years of experience leader in diversified mining services Global leader of diversified mining services Diversification into critical minerals and across the mining operation lifecycle metals, asset management & sustainability services Operates +60 project facilities in Austra

  12. Slide 12: CPB Contractors is Australia's largest constructor of critical long-term infrastructure

    Slide 12: CPB Contractors is Australia's largest constructor of critical long-term infrastructure

    CPB Contractors is 97 years of experience Australia's largest constructor of critical long-term infrastructure Engineering & construction specialized in Robust risk assessment and mitigation the critical long-term infra projects strategies throughout the project lifecycle Trusted construction partne

  13. Slide 13: Agenda

    Slide 13: Agenda

    Agenda CIMIC Today Key Differentiators 13 13

  14. Slide 14: 3 key differentiators

    Slide 14: 3 key differentiators

    3 key differentiators 1 2 3 Integrated Disciplined Derisking Unique Positioning in Platform Approach Next Generation Sectors 14 14

  15. Slide 15: 3 key differentiators

    Slide 15: 3 key differentiators

    3 key differentiators 1 2 3 Integrated Disciplined Derisking Unique Positioning in Platform Approach Next Generation Sectors 15 15

  16. Slide 16: We bring an integrated platform to successfully deliver critical projects across the whole lifecycle

    Slide 16: We bring an integrated platform to successfully deliver critical projects across the whole lifecycle

    We bring an integrated platform to successfully deliver critical projects 1 across the whole lifecycle Develop Engineer Deliver Operate Own Engineering, manufacturing & industrial services End-to-end minerals processing services Engineering for high tech infra and advanced manufacturing Intercompany

  17. Slide 17: Case Study | Sydney Metro

    Slide 17: Case Study | Sydney Metro

    Case Study | Sydney Metro 1 Australia's largest public mobility project with driverless trains Develop Engineer Deliver Operate Own 110km 27mn $15bn tunnels customer CIMIC's journeys share of annually work 17 17

  18. Slide 18: 3 key differentiators

    Slide 18: 3 key differentiators

    3 key differentiators 1 2 3 Integrated Disciplined Derisking Unique Positioning in Platform Approach Next Generation Sectors 18 18

  19. Slide 19: We use collaboration models to mitigate risks and better forecast margins and delivery timeline

    Slide 19: We use collaboration models to mitigate risks and better forecast margins and delivery timeline

    We use collaboration models to mitigate risks and better forecast margins 2 and delivery timeline All stakeholders incentivized to Progressively moving to a fully low-risk collaborate on outcomes profile backlog Total backlog value, split by contract type Traditional ~30% ~20% ~35% Large portion of

  20. Slide 20: Case Study | HV transmission line

    Slide 20: Case Study | HV transmission line

    Case Study | HV transmission line 2 +A$1.4bn incentivized collaborative model contract in energy transition project Employer & Contractor | Upside & downside split $Gain New collaborative model 75:25 Previous model Underrun First 5% Overrun 50:50 in Cost (%) First 5% 50:50 in Cost (%) 75:25 Downside

  21. Slide 21: 3 key differentiators

    Slide 21: 3 key differentiators

    3 key differentiators 1 2 3 Integrated Disciplined Derisking Unique Positioning in Platform Approach Next Generation Sectors 21 21

  22. Slide 22: Leading the way in sustainable mobility, energy transition and critical minerals projects

    Slide 22: Leading the way in sustainable mobility, energy transition and critical minerals projects

    Leading the way in sustainable mobility, energy transition and critical 3 minerals projects in Australia and New Zealand CIMIC's backlog evolution +53% in next generation markets A$15.2bn Backlog in +A$2.0bn critical minerals Backlog in A$9.9bn +A$1.4bn digital & tech Backlog in ~A$2.7bn energy tran

  23. Slide 23: Energy transition | We are ideally positioned to tackle the energy challenges

    Slide 23: Energy transition | We are ideally positioned to tackle the energy challenges

    Energy transition | We are ideally positioned to tackle the energy challenges 3 Unique track record in advancing this transition -43% -100% Australia to reach Net Zero by 2050 1 2030 2050 1,100MWp 792MWp 3,000MWh +9x Solar Farm Wind Farm Battery Energy Renewable energy generation Generation 2 Genera

  24. Slide 24: Case Study | Victorian Big Battery for Neoen

    Slide 24: Case Study | Victorian Big Battery for Neoen

    Case Study | Victorian Big Battery for Neoen 3 Largest grid-connected lithium-ion battery energy storage system (BESS) in the Southern Hemisphere Engineering solution for generation and storage 450 battery energy 212 Tesla Megapack storage system units of Tesla-supplied BESS 1 MWh 1. Battery Energy

  25. Slide 25: Critical minerals | FY 2023 Figures

    Slide 25: Critical minerals | FY 2023 Figures

    3 Critical minerals | FY 2023 Figures Established leader in the critical minerals A$5.9bn A$1.5bn Recent acquisitions of underground mining sector by Revenue EBITDA and engineering strategically services businesses to expanding its A$14.7bn A$428mn expand the capabilities services and in critical mi

  26. Slide 26: Case Study | MACA's acquisition

    Slide 26: Case Study | MACA's acquisition

    Case Study | MACA's acquisition 3 Acquisition of MACA, an international mining, civil and infrastructure services provider Extend commodities portfolio to 1 new critical minerals A$1.7bn new Thiess' backlog in 2023 in metals and minerals 2 Gain engineering capabilities to expand value proposition sy

  27. Slide 27: Critical minerals | Sedgman strategically growing its engineering capabilities

    Slide 27: Critical minerals | Sedgman strategically growing its engineering capabilities

    Critical minerals | Sedgman strategically growing its engineering capabilities 3 in critical minerals Engineering and metallurgy services and Engineering of hard rock lithium Engineering and delivery of optimal client process equipment for lithium concentration and refining processes solutions in ch

  28. Slide 28: Key takeaways

    Slide 28: Key takeaways

    Deeply entrenched as a local leader in Australia and New Zealand, renowned for its extensive network and excellent client reputation Infrastructure spending increase driven by megatrends will support Key takeaways our topline growth Integrated platform designed to serve our clients across the whole

  29. Slide 29: Actividades de Construcción y Servicios

    Slide 29: Actividades de Construcción y Servicios

    ACTIVIDADES DE CONSTRUCCION Y SERVICIOS eo

Source: Internet Archive copy of grupoacs.com

More decks from ACS, Actividades de Construccion y Servicios SA

All 139 ACS, Actividades de Construccion y Servicios SA decks