Slide 1: Apollo Hill Heap Leach Gold: A Scalable Gold Development Opportunity
APOLLO HILL HEAP LEACH GOLD: A Scalable Gold Development Opportunity in Western Australia Annual General Meeting rsonal use only 25 November 2026 ASX:STN Rendered Visualisation of Apollo Hill Gold Project www.saturnmetals.com.au DFS Design Drawings for Crushing Plant

Slide 2: Apollo Hill Gold Project: Large Strategically Located Assets
APOLLO HILL GOLD PROJECT Large Strategically Located Assets Central strategic position in a world class multi-million ounce rsonal use only gold province 60km south-east of Leonora in Western Australia 2.83Moz Au Mineral Resource1 in a single large deposit – 77% Measured & Indicated Category tot

Slide 3: Corporate Snapshot: Compelling Value – Strong Register
CORPORATE SNAPSHOT Market Performance Compelling Value – Strong Register $400 $0.80 $350 $0.70 Market Cap. $M $300 $0.60 Share Price $250 $0.50 $200 $0.40 Corporate Structure $150 $0.30 $100 $0.20 Shares on Issue 752.2M rsonal use only $50 $0.10 1 (Tranche 2 - FIRB) + Placement Announced 29 July 202

Slide 4: Apollo Hill 2.83Moz Gold Mineral Resource
APOLLO HILL 2.83MOZ GOLD MINERAL RESOURCE Big, Single, Simple, Large Selective Mining Unit, Low Unit Cost, Open Pit Shell • 2.19Moz in Measured and Indicated Categories • Well positioned for DFS & Reserve Update later in CY2026 rsonal use only Apollo Hill December 2025 Maiden Ore Reserve 1,590,000oz

Slide 5: Economies of Scale & Low-Cost Mining
ECONOMIES OF SCALE & LOW-COST MINING From Surface Bulk Mining Low Strip Life of Mine 2.39:1 in PFS Bigger selective mining units (10m benches); Big Equipment PFS Pit Shell A$3,550 (US$2,300) Thick ore zones +100m PFS pit shell to 310m – modest depth by current standards Strong Resource t

Slide 6: DFS Pit Design
DFS PIT DESIGN Work has focused on: Identifying opportunities to minimise the stripping ratio rsonal use only Mine Scheduling – Pit to ROM Pad to Crusher to Heap Geotechnical Design Parameters Oblique 3D view of the near final Apollo Hill DFS Pit Design – September 2026 Note: Design Visualisat

Slide 7: Simple Metallurgy – Apollo's Biggest Cost Differentiator
SIMPLE METALLURGY – APOLLO’S BIGGEST COST DIFFERENTIATOR Excellent Gold Extraction Characteristics for Easily Recoverable Gold HEAP LEACH COLUMN TESTWORK rsonal use only +78% gold recovery in fresh rock columns at 8mm Crush 86% gold recovery in Oxide and Transitional Columns at 8mm Crush Flat

Slide 8: 2025 Pre-Feasibility Study: Production Target 1.77Moz
2025 PRE-FEASIBILITY STUDY Production Target – 1.77Moz Annualised Gold Mined by Resource Inventory Initial Target: 10Mtpa for 11 years 180.0 (+3yrs inc. ramp up & ramp down) rsonal use only 0.64 160.0 Life of mine production totals 117.4Mt 140.0 at 0.47 g/t for 1.77Moz of contained 0.50 gold 120.0

Slide 9: Simple Metallurgy Leads to Conventional Heap Leach Processing
SIMPLE METALLURGY LEADS TO CONVENTIONAL HEAP LEACH PROCESSING Full Scale Adjusted Stacking and Recovery Parameters in PFS EFFICIENT HEAP LEACHING OF FREE GOLD EASILY LIBERATED FROM QUARTZ VEINS BY HPGR CRUSH TO 8mm P100: rsonal use only PFS uses 73.7% recovery & 160-days Stacking Schedule – Compet

Slide 10: PFS Economics – A Margin x Volume Business
PFS ECONOMICS – A MARGIN X VOLUME BUSINESS Bulk Mining & Processing Delivers Economies of Scale Low Cost = A$20.36/t Margin x Large Volume Excavator – 29 m3 Bucket rsonal use only (10Mtpa Run Capacity) = Impressive Free Cash Flow @ A$4,300 • C1 Cost A$2,369/oz A$M A$ /t Processed A$ /oz Payable (US$

Slide 11: PFS Processing Efficiency
PFS PROCESSING EFFICIENCY Processing – Infrastructure; Capital Investment in Efficiency and Consistent Quality of Product to Pad • Base Load 10Mtpa – 30Ktpd Plant and Infrastructure • A$472M Capex Paid Back in 2.3 Years at A$4,300 Base Case Rendered Visualisation of Apollo Hill Gold Project PFS Desi

Slide 12: DFS Processing Efficiency
DFS PROCESSING EFFICIENCY Processing – Infrastructure; Capital Investment in Efficiency and Consistent Quality of Product to Pad • Several Value Engineering Elements Now Incorporated into Design – Still Base Load 10Mtpa – 30Ktpd Radial Rendered Visualisation of Apollo Hill Gold Project PFS Design Dr

Slide 13: Pre-Feasibility Study – A Financial Result
PRE-FEASIBILITY STUDY – A FINANCIAL RESULT Robust Financials at A$4,300/oz Gold base case, a Healthy Margin The Project demonstrates outstanding financial outcomes rsonal use only including: 2,100 2,000 1,900 1,800 • a Project EBITDA of A$2.5B 1,700 1,600 1,500 • a free cash flow of more than A$1.9B

Slide 14: Pre-Feasibility Study – Sensitivity Analysis
PRE-FEASIBILITY STUDY – SENSITIVITY ANALYSIS Gold Price – Impact on NPV and IRR The base load Apollo Hill asset can drive sustainable long-term cash flow with potential for outstanding financial outcomes 4,000 250% rsonal use only 3,500 200% 3,000 2,500 Current 150% Gold Price ~A$5,350 IRR (%) 2,000

Slide 15: Resource Comparison – Heap Leach Global Stage
RESOURCE COMPARISON – HEAP LEACH GLOBAL STAGE Arrived in a Globally Important Peer Group 0.8 Current Resources firmly place Apollo rsonal use only Florida Canyon, USA Hill in bulk tonnage economic space: 0.7 Soledad Mountain, USA Andean Precious Metals Integra Resources Apollo Hill, AUS 2.95Moz Satu

Slide 16: Resource Growth as Geological Patterns Emerge
RESOURCE GROWTH AS GEOLOGICAL PATTERNS EMERGE Orthogonal Gold Trends rsonal use only 3D Oblique View Illustration shows: • June 2026 Mineral Resource Block Model >0.75g/t Au • June 2026 Mineral Resource Constraining Pit shell • July 2025 Mineral Resource Constraining Pit shell Drilling results repor

Slide 17: All Drill Results to Date
ALL DRIILL RESULTS TO DATE Lode Gold Architecture; Exploration Intersections show Extensional Potential rsonal use only 3D Oblique View Illustration shows: • June 2026 Mineral Resource Block Model >0.75g/t Au Drilling results reported in ASX Announcements dated • June 2026 Mineral Resource Constrain

Slide 18: New Hanging Wall Results
NEW HANGING WALL RESULTS Mineralisation Remains Open – Drilling Planned Note: Live Geological Interpretation and 3D Animation in VRIFY During Presentation rsonal use only 3D Oblique View Illustration shows: • June 2026 Mineral Resource Block Model >0.75g/t Au Drilling results reported in ASX Announc

Slide 19: Open for Growth in Multiple Directions and at Shallow Depths
OPEN FOR GROWTH IN MULTIPLE DIRECTIONS AND AT SHALLOW DEPTHS rsonal use only Drilling results reported in ASX Announcements dated: Hole AA90 10/01/18 (Prospectus), AHRC1581 8/04/26, Hole AHRC1292 13/08/25 At Scale: 2.83Moz Resource against St George’s Terrace (Perth, WA) 19

Slide 20: Regional Opportunities
REGIONAL OPPORTUNITIES Brown Field Prospects and Greenfield Target Areas ~1,000km2 land package, large continuous gold system, large tracts of ground still untested, further regional exploration drilling (20km planned) 325000E 350000E 375000E 400000E 425000E 450000E 475000E rsonal use only Sunrise D

Slide 21: Development Plan: Timeline to Production
DEVELOPMENT PLAN Timeline To Production 2026 2027 2028 2029 rsonal use only Definitive Feasibility Study Regulatory Approvals Financing & Procurement Construction & Commissioning Targeting First Gold Early 2029 Ongoing Drill Bit Strategy & Results Reporting Note: Indicative timetable, subject to cha

Slide 22: Important Information & Disclaimers
IMPORTANT INFORMATION & DISCLAIMERS The following notices and disclaimers apply to this presentation, and you are therefore advised to read this carefully before reading or making any other use of this presentation or any information contained in this presentation. This presentation has been authori

Slide 23: Appendix A: Mineral Resource – Apollo Hill Gold Deposit
APPENDIX A Mineral Resource – Apollo Hill Gold Deposit Measured, Indicated & Inferred Mineral Resource Ounces with Time: Mineral Resource Tonnes Au Au metal 3,000,000 2,830,000 rsonal use only Classification Oxidation (Mt) (g/t) (Kozs) Oxide 0.1 0.43 1 2,500,000 2,239,000 Measured Transitional 0.7 0

Slide 24: Appendix B: Ore Reserve – Apollo Hill Gold Deposit
APPENDIX B Ore Reserve – Apollo Hill Gold Deposit Mineral Reserve Tonnes Au Au Metal Oxidation Classification (Mt) (g/t) (koz) rsonal use only Oxide 0.0 0.56 0 Proven Transitional 1.4 0.54 24 Fresh 3.4 0.49 54 Subtotal 4.8 0.51 78 Oxide 0.6 0.50 9 Probable Transitional 7.4 0.45 108 Fresh 91.9 0.47 1

Slide 25: Appendix C: Resource Comparison – Peer Group Data
APPENDIX C Resource Comparison – Peer Group Data Mineral Resource Measured Indicated Inferred Total Source Company Desposit Stage rsonal use only Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces 1 Kinross Gold Corporation Bald Mountain Production 5,678,000 1.00 188,000

Slide 26: Appendix D: PFS Sensitivity Analysis
APPENDIX D PFS Sensitivity Analysis Gold Price (A$/oz) 3,500 3,800 4,000 4,300 5,000 5,500 6,200 8,000 rsonal use only NPV8% A$M 379 601 750 973 1,493 1,864 2,384 3,721 NPV5% A$M 539 808 987 1,256 1,883 2,152 2,958 4,571 IRR % 25 34 41 51% 58 94 123% 146% Payback years 4.2 3.4 3.0 2.3 1.8 1.6 1.3 0.
Source: ASX announcement, Nov 25, 2026
More decks from Saturn Metals Ltd.
RRS Gold Coast Conference (September 2026)26 slides · Sep 9, 2026
Rule Symposium (July 2026)28 slides · Jul 7, 2026
Investor Presentation (May 2026)26 slides · May 1, 2026
Investor Presentation (April 2026)26 slides · Apr 9, 2026
Investor Presentation (February 2026)25 slides · Feb 12, 2026
Australian Gold Conference (October 2025)20 slides · Oct 14, 2025