Restructuring programme in the Container segment Where are we today? Meeting the challenges and ensuring the future viability of our terminals in Hamburg Requirements for terminals will increase also in the future in terms of: Mega carriers led to challenging peak load conditions − Increasing dema
Slide 3: What do we want to achieve?
Restructuring programme in the Container segment What do we want to achieve? In addition to performance, we keep an eye on our costs while being sustainable and geared to growth CTX | HHLA Container Terminals 2025 Together, we are creating a future-proof and sustainable container business for HHLA i
Slide 4: How we want to transform: top projects
Restructuring programme in the Container segment How we want to transform: top projects As well as investing in the future viability of the terminals, we are optimising our processes & exploiting synergies Organisation Centralisation of planning and administration functions Set-up container oper
Slide 5: HHLA Container Terminal Altenwerder
Restructuring programme in the Container segment HHLA Container Terminal Altenwerder CTA Terminal Layout 2025 Container Terminal Altenwerder (CTA) Asset largely depreciated – € 125 m replacement investments necessary by 2025 Additional investments of € 19 m by 2025 Light capacity increase from
Slide 6: HHLA Container Terminal Burchardkai
Restructuring programme in the Container segment HHLA Container Terminal Burchardkai CTB Terminal Layout 2025 Container Terminal Burchardkai (CTB) Investments of € 385 m between 2022 and 2025 Includes investments in third ULCV berth Increasing the 2.9 m TEU capacity today to 4.1 m TEU in 2025
Slide 7: HHLA Container Terminal Tollerort
Restructuring programme in the Container segment HHLA Container Terminal Tollerort CTT Terminal Layout 2025 ff. Container Terminal Tollerort (CTT) Capacity expansion in line with volume development depending on COSCO – from 1.6 m TEU up to 2 m TEU in 2025 Including total investments in the amoun
Backup HHLA is ready for 24,000 TEU vessels Measures for smooth container throughput on the waterside and in the hinterland NTK: Nautische Terminal Koordination FLZ: Feeder Logistik Zentrale Coordination of arriving and departing Neutral platform and single point of contact vessels in the river
Slide 10: Our value proposition
Backup Our value proposition Not size, but performance! Reliable high-performance for all ship sizes at the location with the best hinterland connection We employ an integrated We defend our market position approach with end-to-end We will significantly increase We have the most powerful with a comp
Slide 11: Mega carriers led to challenging peak load conditions
Backup Mega carriers led to challenging peak load conditions Example for the impact of a 24 TTEU vessel on all modes of transport and the block storage system Throughput: 24 TTEU vessel 9,500 boxes 5 50 2 3,600 14.12.2021 Capital Markets Day: Striving for Efficiency – Restructuring programme in the