Enka Insaat ve Sanayi A.S. · BIST:ENKAI
Enka Insaat ve Sanayi A.S — Q3 2014 Earnings Presentation
53 slides from Enka Insaat ve Sanayi A.S's earnings presentation, 2014

Slide 1: erie OO 22>:
erie OO 22>:

Slide 2: Introduction
INTRODUCTION 57 Years of Construction Experience Worldwide A Group of Companies Composed of More Than 50 Subsidiaries Operating in 6 Major Geographical Areas: CIS, Asia, Middle East, Europe, Africa & Turkey 475 Projects in 45 Countries have been Completed or Under Construction with Historical

Slide 3: Capabilities & Operations
CAPABILITIES & OPERATIONS With a Solid Background of 57 Years ENKA Operates in 4 Main Segments Engineering & Construction Energy Real Estate Trade 3

Slide 4: Milestones
MILESTONES 1957 – Founded as a Limited Liability Partenership as Şarık Tara & Sadi Gülçelik ENKA Limited Şirketi 1962 – Focused on Design, Engineering and Construction Activities of Industrial Plants, Buildings and Infrastructure 1967 – The Partnership was Transformed into a Joint Stock Company as E

Slide 5: Milestones (Cont'd)
MILESTONES (Cont'd) 1983 – ENKA Sports, Education and Culture Foundation and Sadi Gülçelik Sports Center Establishments 1984 – First Natural Gas Combined Cycle Power Plant in Turkey 600 MW Trakya CCCP 1986 – Multinational Joint Ventures 1986 – Outstanding Achievements with Fast-Track Projects in Lib

Slide 6: Milestones (Cont'd)
MILESTONES (Cont'd) 2000 – Power Generation as Independent Power Producer (IPP) 2001 – Certified by BSI for ISO 9001 Quality Management System 2002 – Merged with Enka Holding under Enka İnşaat ve Sanayi A.Ş. 2002 – Certified by BSI for ISO 14001 Environmental Management System and OHSAS 18001 Occupa

Slide 7: Milestones (Cont'd)
MILESTONES (Cont'd) 2010–ENKA Set a New World Record For Power Plant Availability (with 99,8% which is 7% Over the Industry Average) over the 12-Month Period with GE 9 FA Gas Turbines 2011–First Contract Awarded in Continent America – New US Embassy Compound in Santa Domingo, Dominican Republic 2011

Slide 8: Milestones (Cont'd)
MILESTONES (Cont'd) 2012–Al-Najybia 500 MW Gas Turbine Power Plant and Rumaila Crude Oil Pumping Station Projects have been Awarded. 2012–Steel Works Contract of Izmit Bay Crossing Suspension Bridge Project has been Awarded. 2013–Sulaymaniyah and Dohuk Combined Cycle Plant Conversion Projects have b

Slide 9: Vision and Values
VISION AND VALUES The Following Vision and Values Define What is Meant to be ENKA. - Excellence - Innovation - Speed - Safety - Being a Good Member of the Community - Its People 9

Slide 10: Shareholder Structure
SHAREHOLDER STRUCTURE 31,45% 50,08% TARA FAMILY 12,59% ENKA FOUNDATION 5,88% FREE FLOAT GÜLÇELİK FAMILY As of June 19, 2014 10

Slide 11: Consolidated Financial Highlights
CONSOLIDATED FINANCIAL HIGHLIGHTS ( Million USD ) 2014 (3Q) 2013 2012 2011 TOTAL ASSETS 8.339 8.471 8.238 7.460 TOTAL EQUITY 5.478 5.597 5.099 4.533 CASH & MARKETABLE SECURITIES 2.782 2.752 2.707 2.164 REVENUE 4.369 6.547 5.746 5.037 EBITDA 655 1.032 708 857 EBITDA MARGIN % 15,0 15,8 12,3 17,0 NET P

Slide 12: Revenues by Business Lines
REVENUES BY BUSINESS LINES 2014 (3Q) 2013 2012 ( Million USD ) USD % USD % USD % CONSTRUCTION 1.621 37,1 2.550 38,9 1.384 24,1 POWER GENERATION 2.364 54,1 3.284 50,2 3.653 63,6 REAL ESTATE 369 8,4 478 7,3 442 7,7 TRADE 230 5,3 447 6,8 395 6,9 ELIMINATION (215) (4,9) (212) (3,2) (128) (2,3) TOTAL 4.3

Slide 13: EBITDA by Business Lines
EBITDA BY BUSINESS LINES 2014 (3Q) 2013 2012 ( Million USD ) USD % Margin USD % Margin USD % Margin CONSTRUCTION 193 29 12 357 35 15 126 18 9 POWER GENERATION 176 27 7 273 27 8 267 38 7 REAL ESTATE 257 39 70 346 34 73 288 41 70 TRADE 25 4 11 48 5 11 19 3 6 ELIMINATION 4 1 7 1 8 1 TOTAL 655 100 1.031

Slide 14: Share Capital Increases and Dividends
Share Capital Increases and Dividends (Turkish Liras) Date Previous Share Capital Increase Increase (%) Increased Share Capital 25.05.2010 1.800.000.000 400.000.000 22,22% 2.200.000.000 02.06.2011 2.200.000.000 300.000.000 13,64% 2.500.000.000 25.05.2012 2.500.000.000 300.000.000 12,00% 2.800.000.00

Slide 15: Top Management
TOP MANAGEMENT BOARD OF DIRECTORS M.Sinan Tara Chairman of the Board Haluk Gerçek Vice Chairman of Board Erdoğan Turgut Member of Board (Non-executive Member) E. Melih Araz Member of Board (Non-executive, Independent Member) V. Ergin İmre Member of Board (Non-executive, Independent Member) EXECUTIVE

Slide 16: Work Force
WORK FORCE As of Technical Administrative Workers Total September 2014 Staff Staff ENKA Istanbul 295 103 73 471 Head Quarters ENKA Subsidiaries 918 550 2.100 3.568 in Turkey ENKA Construction Abroad 857 323 15.444 16.624 ENKA Construction 69 46 1.618 1.733 Subsidiaries Abroad Total 2.139 1.022 19.23

Slide 17: Engineering & Construction
ENGINEERING & CONSTRUCTION Specifically in O&G&PC Industry, ENKA Provides Engineering, Fabrication Construction, Commissioning and Start Up Services for Major Internatioal Clients Such as; Exxon Mobil, Shell, Chevron, Lukoil etc. ENKA has also Solid Relations with Leading OEMS & Extensive Experience

Slide 18: Resources
RESOURCES ENKA Owns a Construction Machinery & Equipment Fleet Comprising of 3.740 Pieces Worth of USD 314 Million; and 800.000 Square Meters of Site Facilities (Work Shops, Camps, Warehouses, Offices and etc.) Mobilized in Different Countries where Fabrication and Construction Works are Being Perfo

Slide 19: Awards
AWARDS ENKA’s 411MWe CCPP Yajva State District Power Plant EPC Project has been Awarded “The Best Project in the Power/Industrial category” in 2013 Global Best Projects Competition of ENR (Engineering News- Record) ENKA’s Kosovo Motorway EPC Project (Sections 1,2,3 & 4a) has been Awarded “The Be

Slide 20: Certificates
CERTIFICATES ISO 9001: 2008 ISO 14001: 2004 OHSAS 18001: 2007 QUALITY MANAGEMENT SYSTEM ENVIRONMENTAL MANAGEMENT SYSTEM HEALTH & SAFETY MANAGEMENT SYSTEM ASME S ASME A ASME U ASME U2 POWER BOILERS POWER BOILER ASSEMBLIES PRESSURE VESSELS ALTERNATIVE RULES FOR PRESSURE VESSELS 20

Slide 21: Certificates (Cont'd)
CERTIFICATES (Cont’d) ASME Nuclear NPT STAMP ASME Nuclear NA STAMP ASME Nuclear NS STAMP EnBW KTA 1401 's Nuclear Certificates 21

Slide 22: Engineering & Construction
| ENGINEERING SCONSTRUCTION = Tygon) a 57%» YEAR

Slide 23: Backlog as of 30.09.2014
BACKLOG AS OF 30.09.2014 COUNTRY (Million USD) % IRAQ 1.538 45,6 KOSOVO 381 11,3 US EMBASSY PROJECTS 379 11,2 GEORGIA 260 7,7 OMAN 241 7,1 RUSSIA 108 3,2 GABON 106 3,1 TURKEY 101 3,0 KAZAKHSTAN 85 2,5 UNITED STATES 84 2,5 LIBYA 21 0,6 OTHERS 71 2,1 TOTAL 3.375 100,0 23

Slide 24: Selected Projects Under Construction
SELECTED PROJECTS UNDER CONSTRUCTION Erbil Combined Cycle Power Plant Project – Erbil, Iraq Sulaymaniyah Combined Cycle Power Plant Project – Sulaymaniyah, Iraq Dohuk Combined Cycle Power Plant Project – Dohuk, Iraq Al Najybia 4x125 MW Gas Turbine Power Plant Project – Basra, Iraq US Embassy Project

Slide 25: Selected Projects Under Construction
SELECTED PROJECTS UNDER CONSTRUCTION Ufa Medical Center Project – Ufa, Russia Route 6 Hani i Elezit Motorway Project - Kosovo Development of Muscat International Airport Project – Muscat (MC3), Sultanate of Oman Presidential Palace Project – Gabonese Republic Conference Center Project – Gabonese Rep

Slide 26: Combined Cycle Power Plant Projects – Iraq
SELECTED PROJECTS UNDER CONSTRUCTION Combined Cycle Power Plant Projects – Erbil, Sulaymaniyah and Dohuk, Iraq Job Owner: MGH - Mass Group Holding Ltd. Scope: To Convert its Erbil Independent Power Project (IPP) from Simple-Cycle to Combined-Cycle Technology. The Project is on an EPC basis. Erbil Ga

Slide 27: Al Najybia Gas Turbine Power Plant Project
SELECTED PROJECTS UNDER CONSTRUCTION Al Najybia 4x125 MW Gas Turbine Power Plant Project – Basra, Iraq Located in Basra, Iraq Contract Price: USD 237 Million The Project is in the Scope of “Mega Deal Projects” by Ministry of Electricity of Iraq. Engineering, Procurement, Construction, Commissioning

Slide 28: US Embassy Projects
SELECTED PROJECTS UNDER CONSTRUCTION US Embassy Projects – Afghanistan, Dominican Republic, Papua New Guinea, Russia, Equatorial Guinea The Netherlands and Mauritania The Collaboration between ENKA and CADDELL Construction Co. of USA Started in Early 2000’s Companies Agreed to Jointly Carry Out the

Slide 29: Berezovskaya Coal Fired Power Plant
SELECTED PROJECTS UNDER CONSTRUCTION Berezovskaya Coal Fired Power Plant, Mechanical Erection Works Krasnoyarsk, Russia End Customer: OJSC “E.ON Russia” EPC Contractor: Energoproekt ENKA is Mechanical Erection Works Contractor for the Construction of the 800 MW Berezovskaya Coal Fired Power Plant Pr

Slide 30: Khabarovsk Refinery Works
SELECTED PROJECTS UNDER CONSTRUCTION Khabarovsk Refinery Structural Steel and Mechanical Erection Works Khabarovsk, Russia Expansion of the Existing Refinery, which was Built During the 1930’s. The Scope of Works Include the Erection of Several Main Units, which are the New Combined Hydrocracking an

Slide 31: South Caucasus Pipeline Expansion Project
SELECTED PROJECTS UNDER CONSTRUCTION South Caucasus Pipeline Expansion (SCPX) Project - Georgia Contract Price: USD 528 Million Contract for the Construction and Commissioning Support of the SCPX Project Facilities in Georgia has been Awarded to the BECHTEL-ENKA Joint Venture The Scope of Work Under

Slide 32: Route 6 Motorway Project – Kosovo
SELECTED PROJECTS UNDER CONSTRUCTION Route 6 Hani i Elezit Motorway Project - Kosovo BECHTEL – ENKA General Partnership (50% - 50%) Contract Price: EUR 600 Million 60-Kilometer Motorway Linking the Capital, Pristina, to Neighboring Macedonia. The New Motorway, Route 6, will Connect Kosovo with the S

Slide 33: Muscat International Airport Development
SELECTED PROJECTS UNDER CONSTRUCTION Development of Muscat International Airport Project (MC3)– Muscat, Sultanate of Oman Consortium of BECHTEL – ENKA Joint Venture with Bahwan Engineering Company The Contract Price : USD 1,8 Billion ( ENKA’s Share = USD 702 Million ) Job Owner : The Ministry of Tra

Slide 34: Gabonese Republic Projects
SELECTED PROJECTS UNDER CONSTRUCTION Gabonese Republic Projects Presidential Palace – Conference Center – Mausoleum The Total Contract Price of 3 Projects: USD 260 Million Job Owner : Gabonese Republic Location: Franceville and Libreville The Projects Include Construction of a Mausoleum, a Mosque, a

Slide 35: Bazian Simple Cycle Power Plant Project
SELECTED PROJECTS UNDER CONSTRUCTION Bazian Simple Cycle Power Plant Project Contract Price : USD 240 Million Job Owner : Qaiwan Group Location : Bazian, Sulaymaniyah – Iraq ENKA is awarded to Build the First Phase of Bazian Combined Cycle Power Plant, the Simple Cycle Portion. The Green Field Proje

Slide 36: Bismayah Combined Cycle Power Plant Project
SELECTED PROJECTS UNDER CONSTRUCTION Bismayah Combined Cycle Power Plant Project – Bismayah, Iraq Contract Price : USD 555 Million Job Owner : Mass Energy Group Holding Ltd. Location : Bismayah, Baghdad – Iraq ENKA is awarded to Build the First Phase of Bismayah Combined Cycle Power Plant. The Green

Slide 37: 57th Year
57t> YEAR

Slide 38: Real Estate
REAL ESTATE Type Location Size (NLA) Occupancy Rate Class A Office Area Moscow 337.000 m2 94% USD 850/m2/Year Retail Area Moscow** 233.000 m2 97% USD 650/m2/Year 5 Star Hotel Moscow 235 Rooms * * * Occupancy and Rate of rooms of the Hotel may vary daily. * * 1 out of 10 Shopping Centers is located i

Slide 39: Real Estate Revenue and EBITDA
REAL ESTATE Year Rental Revenue Change Change (%) 2014 (3Q) USD 369 Million USD 14 Million* 3,9%** 2013 USD 478 Million USD 36 Million 8,1% 2012 USD 442 Million USD 35 Million 8,6% 2011 USD 407 Million USD 35 Million 9,4% Year EBITDA EBITDA Margin Change Change (%) 2014 (3Q) USD 257 Million 69,7% US

Slide 40: Real Estate Tenants
REAL ESTATE Some of the Tenants are; STATOIL LG ELECTRONICS HSBC E.ON LINKLATERS IATA LINDE GAS MITSUI & CO. MEDTRONIC CITIBANK FORTUM RENAISSANCE CAPITAL UNIVERSAL PICTURES BASF UBS CLEARY GOTTLIEB STEEN & HAMILTON GENERAL ELECTRIC RICHEMONT ELI LILLY PFIZER POLYCOM NATIONAL OILWELL VARCO IBM KPMG

Slide 41: Real Estate (New Investment Projects)
REAL ESTATE (NEW INVESTMENT PROJECTS) Kuntsevo Multifunctional Complex Job Owner : ENKA TC (Fully Owned By ENKA) Total Investment : USD 425 Million The Existing Shopping Center which was Opened In 1997 with a Total of 19.400 m2 is demolished in 2012 The Complex will Include: Shopping Center with a

Slide 42: Real Estate (New Investment Projects)
REAL ESTATE (NEW INVESTMENT PROJECTS) Kuntsevo Multifunctional Complex (Cont’d) It is Planned to be Operative in the second half of 2014 Won the “Cityscape Awards for Emerging Markets, 2012 Category Best Retail Project Future” Prize between 36 Projects from 13 Different Countries in the Internationa

Slide 43: Real Estate (New & Further Investment Projects)
REAL ESTATE (NEW & FURTHER INVESTMENT PROJECTS) Vernadskovo Office Center Job Owner : ENKA TC (Fully Owned By ENKA) Total Investment : USD 40 Million The Complex will Include: A-Class Office with a Net Leasable Area of 22.000 m2 Multistorey Car Park will have Total Area of 12.000 m2 Further Inve

Slide 44: Energy
BINJEIRGYW

Slide 45: Financial Overview
FINANCIAL OVERVIEW Operator Ownership: 100% ENKA Debt-to-Equity Ratio: 75/25 Export Credit Agency (ECA) and OPIC Facilities Fully Covered Political and Commercial Risk is Approximately 94% Exhaustive Due Diligence Over 2 Years by ECA and OPIC No Local Currency Risk: Payments Calculated in USD and Pa

Slide 46: Project Overview
PROJECT OVERVIEW 3 Gas-Fired Combined Cycle Power Plants (Total 3,854 MW) – Gebze 1,554 MW – Adapazarı 777 MW – Izmir 1,523 MW Annual Generation is 32 Billion kWh Net and the Annual Natural Gas Consumption is around 6.5 Billion cbm, Capability of Meeting 13% of Turkey’s Total Demand, since Turkey’s

Slide 47: Project Overview (Cont'd)
PROJECT OVERVIEW (Cont’d) BOTAŞ Turkish Pipeline Corporation, a Turkish State Entity, Supplies Natural Gas Under 16-Year-Term Contract (Will expire at the end of 2018) Turkish Undersecreteriat of Treasury Guarantees Back Obligations of TETAŞ and BOTAŞ, Very Competitive Tariffs - 4.2 Cent/kWh Average

Slide 48: Project Rationale
PROJECT RATIONALE Strong and Growing Projected Demand for Electricity (8%p.a. at that Time) Existing and Forecasted Energy Shortage at that Time, Improving Economic Situation in Turkey. Proximity to Main Electricity Load Centres – Will Reduce Transmission Losses from Plants in East (Near Domestic Co

Slide 49: Debt Funding
DEBT FUNDING TOTAL COMMITTED AMOUNTS (Million USD) TOTAL DEBT (75%) 1.530 TOTAL EQUITY (25%) 510 TOTAL PROJECT COST 2.040 49

Slide 50: Debt Funding
DEBT FUNDING PROJECT FINANCE TOTAL AS OF 31.12.2012 US EXIM, USA 860 55 HERMES, GERMANY 185 1 OND, BELGIUM 125 6 OPIC, USA 300 37 OTHER BANKS 60 0 TOTAL 1.530 99 All Outstanding Project Finance Loans have been Fully Paid Back in 2013 50

Slide 51: Overview of Project Agreements
OVERVIEW OF PROJECT AGREEMENTS NATURAL GAS EPC SALES CONTRACT BECHTEL AGREEMENT BOTAŞ ENKA JV PARTS & TREASURY PROJECT SERVICES TREASURY GUARANTIES COMPANY GE AGREEMENT ENKA TETAŞ OPERATIONS SANTRAL ELECTRICITY & BAKIM SALES MAINTENANCE AGREEMENT AGREEMENT 51

Slide 52: Turkey's Energy Consumption in 2013
TURKEY’S ENERGY CONSUMPTION IN 2013 SOURCES MILLION KWH % NATURAL GAS + LNG 105.116 42,7 HYDRO 59.421 24,1 COAL 63.054 25.6 WIND, GEO & OTHERS 12.563 5.1 TOTAL PRODUCTION 240.154 97,5 IMPORT 7.429 3,0 EXPORT (1.227) (0.5) TOTAL CONSUMPTION 246.356 100 Source: TEIAS 52

Slide 53: Turkey's Energy Demand
TURKEY’S ENERGY DEMAND 14% 250 12% 10% 200 8% 6% 150 4% 2% 100 0% -2% 95 106 114 119 128 127 133 141 150 161 175 190 198 194 210 230 242 246 50 -4% 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 Billion KWh Change % 53
Source: Internet Archive copy of enka.com
More decks from Enka Insaat ve Sanayi A.S.
Q3 2026 Earnings Presentation43 slides · November 2026
Q2 2026 Earnings Presentation45 slides · August 2026
Q1 2026 Earnings Presentation45 slides · May 2026
FY2025 Earnings Presentation46 slides · 2026
Q3 2025 Earnings Presentation46 slides · November 2025
H1 2025 Earnings Presentation47 slides · August 2025