Slide 1: PGE Investor Presentation
PGE Investor Presentation June, 2025

Slide 2: Agenda
Agenda • PGE at glance • Summary of Q1 2025 & 2024 results and operations • Outlook for 2025 • FID Baltica 2 • Ongoing investments • Market overview • Regulatory overview • Financials 2

Slide 3: PGE at glance
PGE at glance

Slide 4: PGE at glance (2024)
PGE at glance (2024) • Electricity net production 56.2 TWh 3.2 TWh in Renewables Segment • Installed electric capacity 18.9 GW • Wind farms 797 MW • Hydro 96 MW Power • 2 Lignite-fired power plants generation (Bełchatów and Turów) 7.2 GW • 3 Hard coal-fired power plants (Opole, Dolna Odra, Rybnik) 5

Slide 5: PGE market position
PGE market position Electricity net generation Volume of distributed electricity Sales volume to final off-takers Other 6% Other PGE Other PGE 23% 26% 33% PGE 28% 36% Tauron 36% Tauron Orlen ZE PAK 12% 20% 1% Tauron Orlen 6% Orlen 16% ENEA ENEA 11% ENEA 19% 13% 14% Data for 9M2024 5

Slide 6: Evolving PGE business model
Evolving PGE business model Current business model Business model 2025+ • Electricity generation basing on lignite and hard coal • Crucial role of electricity distribution in case of coal carve-out • Minor role of other business segments • Generation potential re-built as investments in new generati

Slide 7: Strategic goals and key investments
Strategic goals and key investments (under review, strategy update to be published June 2025) Offshore Wind Energy Storage Onshore Wind CCGTs in coal Decarbonisation Photovoltaic Nuclear Power >6.5 GW +0.8 GW 1.5 GW locations of District Heating 3 GW (under analysis) capacity by 2040 by 2030 capacit

Slide 8: Summary of Q1 2025 & 2024 results and operations
Summary of Q1 2025 & 2024 results and operations

Slide 9: Key financial data
Key financial data [MSR, PLN m] Q1 2025 Q1 2024 y/y 2024 2023 y/y Sales 17 167 16 841 2% 64 483 95 964 -33% EBITDA 4 310 2 536 70% 12 215 10 028 22% 1 Recurring EBITDA 4 334 2 532 71% 10 878 10 722 1% EBIT 3 260 1 408 132% -65 -3 431 -98% Recurring EBIT 1 3 305 1 450 128% 6 337 5 963 6% 2 Net profit

Slide 10: One-off items
One-off items Computation of recurring EBITDA and recurring EBIT: [PLN m] Q1 2025 Q1 2024 y/y 2024 2023 y/y Change of reclamation provision - 622 -527 - Correction of compensation for sold electricity for previous - 614 0 - years Correction of contribution to the Price Difference Payment -28 - 208 8

Slide 11: Development of EBITDA by major value drivers Q1 2025
Development of EBITDA by major value drivers Q1 2025 (PLN m) Q1 2024 EBITDA RAPORTED 2 536 One-offs 4 Q1 2024 EBITDA RECURRING 2 532 - Price of electricity (PLN -1 413m) (-90.7 PLN/MWh) +Volume (PLN +1 021m) (+1.7 TWh) 1 Sales of electricity-Generation 392 + Production Heat sales +921 185 + Price of

Slide 12: Development of EBITDA by major value drivers 2024
Development of EBITDA by major value drivers 2024 (PLN m) 2023 EBITDA Reported 10 028 One-offs 694 2023 EBITDA RECURRING 10 722 -+Price of electricity (PLN -13 652m) (-246.9 PLN/MWh) - Volume (PLN -103m) (-0.1 TWh) 1 Contributions to the PDP Fund-price limit 6 649 Production + Price of CO (PLN +2 38

Slide 13: Key operating data
Key operating data Net generation of electricity by fuels, sales to final clients and distribution [TWh] Q1 2025 Q1 2024 y/y 2024 2023 y/y Net electricity generation, by fuels: 16.08 14.60 10% 56.16 56.77 -1% lignite 8.51 7.63 12% 30.83 29.79 3% incl. Turów 7 unit 0.50 0.39 28% 1.48 1.00 48% hard co

Slide 14: Key operating data: realized prices and CO2 cost
Key operating data Average realized wholesale price of electricity, average cost of CO2 Average realized wholesale price of electricity1 [PLN/MWh] Q1 2025 Q1 2024 y/y 2024 2023 r/r Conv. Generation segment 500.13 582.24 -14% 588.67 728.28 -19% Gas-fired Generation segment 606.89 - - 669.23 - - Distr

Slide 15: Capital expenditures in Q1 2025
Capital expenditures in Q1 2025 PLN 137 m Conventional Generation CAPEX Key projects PLN 61 m in Q1 2025 Railway Energy PLN 155 m Services 3% 8% District PLN 262 m 9% Heating Construction of CCGT unit in Rybnik PLN 261 m Generation Gas-fired 15% Generation TOTAL PLN 22 m Other 1% CAPEX PLN 510 m Con

Slide 16: Capital expenditures in 2024
Capital expenditures in 2024 PLN 1 031 m Conventional Generation CAPEX Key projects PLN 498 m in 2024 Railway Energy Services 4% 9% PLN 1 406 m PLN 2 462 m District Heating Construction of CCGT units in PGE Gryfino 13% PLN 790 m Generation Gas-fired Dolna Odra Generation 22% TOTAL CAPEX PLN 1 648 m

Slide 17: Outlook for 2025
Outlook for 2025

Slide 18: Recurring EBITDA: outlook for 2025
Recurring EBITDA: outlook for 2025* 18 2025 vs 2024 Perspective Main factors (PLN m) + Better result of pumped storage power plants Renewables − Lower revenues from property rights 1 344 Gas-fired + Full year of commercial operation of CCGT Gryfino Dolna Odra Generation 146 + Lack of burdens related

Slide 19: Investment expenditures: outlook for 2025
Investment expenditures: outlook for 2025* 19 2025 vs 2024 Perspective Main factors (PLN m) Renewables 1 815 Significant increase from the start of the Baltica 2 project Gas-fired Level of spending on Rybnik block construction increases as construction advances Generation 1584 Conventional Generatio

Slide 20: Final Investment Decision on OWF Baltica 2
Final Investment Decision on OWF Baltica 2

Slide 21: Major information about the project of OWF Baltica 2
Major information about the project of OWF Baltica 2 Annual generation: 5.4 TWh Installation Terminal T5 in Gdańsk • Base port for pre-assembly of Installation port in Roenne turbine components – rotor nacelle assemblies, blades and • Base port for monopiles towers • Alternative port for pre-assembl

Slide 22: Financing Structure of the Project
Financing Structure of the Project Loan from BGK bank, approx. PLN Ørsted A/S 3.9 bn - financing PGE SA from National Recovery and Resilience Plan for equity contribution1 approx. PLN 11.1 bn HoldCo Ørsted Project financing from bank HoldCo PGE Ørsted Baltica 2 Holding sp. z Finance consortium (25 P

Slide 23: Support for the Project based on CfD scheme
Support for the Project based on CfD scheme Offshore wind support based on CfD scheme 1. Secured CfD strike price: PLN 319.60/MWh (EUR 71.82/MWh) (in 2021 prices) 2. Annual indexation with the consumer price index (CPI) for the previous year 3. Current strike price of CfD (for 2025): PLN 443.49/MWh

Slide 24: Ongoing investments
Ongoing investments

Slide 25: PGE offshore wind projects portfolio
PGE offshore wind projects portfolio 25

Slide 26: PGE Offshore wind program - Baltica
PGE Offshore wind program - Baltica Baltica 3 area – connection agreement of 1 045 MW • Technical assumptions Baltica 2 area – connection agreement of 1 498 MW • (Baltica 2 & Baltica 3) • Project being implemented in cooperation with Ørsted 2.5 GW <2030 • Total capacity: 2.5 GW • Financial advisor -

Slide 27: PGE Offshore wind program – new seabed areas
PGE Offshore wind program – new seabed areas 27 Development of new offshore wind projects • August 2023 - 5 final decisions for PGE offshore projects issued by the Ministry of Infrastructure (permits for construction and exploitation of artificial islands, installations and equipment)- including JV

Slide 28: New gas capacities in PGE Gryfino Dolna Odra
New gas capacities in PGE Gryfino Dolna Odra Gross capacity: 2x683 MWe Net efficiency : approx. 63% Fuel: gas Net emission rate : <0.35 t CO2/MWh Contract value (net): PLN 3.70 billion LTSA value: PLN 1.03 billion (12 years) Commissioning date: August - October 2024 Key dates and events in the proje

Slide 29: New Czechnica CHP project
New Czechnica CHP project Capacity: 179 MWe and 315 MWt + heat accumulator 13000m3 General efficiency of the unit: approx. 85% Fuel: natural gas Net emission rate : <0.35 t CO2/MWh Contract value (net): PLN 1.16 billion* LTSA value (net): PLN 25m & EUR 20.7m (103 months) Commissioning date: Q2 2025

Slide 30: Construction of a new gas unit at Rybnik power plant
Construction of a new gas unit at Rybnik power plant Capacity: 882 MWe General efficiency of the unit: approx. 64% Fuel: natural gas Net emission rate : <0.35 t CO2/MWh Contract value (net): PLN 3.05 billion LTSA value (net): PLN 762.5m (12 years) Commissioning date: Q4 2026 Ecological effects – ass

Slide 31: Development of PV farms
Development of PV farms Strategic objective: 3 GW in 2030 Ca. 4 000 ha of land secured to develop >2GW Projected growth – own developments + acquisition of projects Project managed by PGE Energia Odnawialna S.A. Installed capacity – 230 MW 2024EOY 2024: • Augustynka PV farm with a capacity of 25 MW

Slide 32: Investments in Distribution
Investments in Distribution PLN 12.1bn in preferential long-term financing from the National Recovery and Resilience Plan: • PGE Dystrybucja S.A. (Distribution segment) -PLN 9.5bn for : improving the capacity to integrate renewable energy sources and improving the security of electricity supplies th

Slide 33: Market overview
Market overview

Slide 34: Polish Power System- installed capacity
Polish Power System- installed capacity Installed capacity in the Polish Energy System (MW) December 2024 • Continuous development of new RES capacities: • PV +4 411 MW y/y • (including +1 363 MW y/y prosumers installations) • Wind +721 MW y/y PV 21 157 Biomass 970 Wind 10 140 Biogas 306 other 707 N

Slide 35: Polish Power System- generation mix
Polish Power System- generation mix Share in electricity generation of particular technologies • Total gross generation (%) of generation in 2024 +2% y/y on higher demand for electricity and natural gas lower import of electricity 12% other • Conventional sources 2% -2% y/y • Lignite +4% y/y lignite

Slide 36: Electricity market - balance of energy
Electricity market - balance of energy Decrease in demand while production increases Domestic consumption and generation [TWh] Q1 2024 Q1 2025 16.5 Generation M1-M4 16.0 +3,0% (+1,72 TWh r/r) 15.5 15.0 Balance of foreign exchange 14.5 M1-M4 (-3,08 TWh r/r) 14.0 13.5 Consumption M1-M4 13.0 -2,3% (-1,

Slide 37: Electricity market - price
Electricity market - price Decline in fuel prices reflected in electricity prices BASE Forward next year and CO2 prices Q1 2025 [PLN/MWh] 2.000 Forward Y+1 Average BASE_Y-26 1.800 Average RTT Y+1 1.600 CO2 • Price of BASE_Y-26 contract 1.400 throughout the quarter fluctuated between 420- 1 112 1.200

Slide 38: Electricity market – price volatility in March 2025
38 -1000 0 500 1000 1500 2000 -1500 -500 2025-03-01 2025-03-01 2025-03-01 2025-03-02 2025-03-02 2025-03-03 2025-03-03 2025-03-04 2025-03-04 2025-03-05 2025-03-05 2025-03-06 2025-03-06 2025-03-06 2025-03-07 2025-03-07 2025-03-08 2025-03-08 2025-03-09 2025-03-09 2025-03-10 2025-03-10 2025-03-11 2025-0

Slide 39: Regulatory overview
Regulatory overview

Slide 40: Capacity market derogation for coal units 2025-2028
Capacity market derogation for coal units 2025-2028 ▪ European Parliament amended in June 2024 electricity market regulations 2019/942 and 2019/943 as regards derogation for the generating units that emits more than 550 g of CO2 per kWh (including coal generation) for the capacity mechanism. ▪ Derog

Slide 41: Catch-up capacity auctions for 2029/2030
Catch-up capacity auctions for 2029/2030 ▪ Catch-up capacity auctions for 2029/2030 were incorporated into Polish law by the Act of February 21, 2025 on changes in the bill on capacity markets. ▪ The catch-up auctions are in addition to the 2029 main capacity auction, which was held in December 2024

Slide 42: Major Electricity & Heat regulations for 2025
Major Electricity & Heat regulations for 2025 ▪ Electricity ▪ Reform of balancing market (from June 14, 2024) –market pricing for ancillary services. ▪ Price freeze ▪ Unfreezing the price of distribution services. ▪ Households: limit for electricity price for Q1-Q3 2025 set at PLN 500/MWh. ▪ Obligat

Slide 43: Offshore wind – changing rules for 2025 auction
Offshore wind – changing rules for 2025 auction ▪ The Act of November 27, 2024 amending law on promotion of generation of electricity in offshore wind farms stipulates different prices for different locations of maritime areas. ▪ Ministry of Climate and Environment published in January 2025 ordinanc

Slide 44: Draft law on investment in wind power plants – abolition of 10H
Draft law on investment in wind power plants – abolition of 10H ▪ Status: as at 09/06 2025- the first reading of the bill in the Sejm (the lower house of the Polish Parliament) Key solutions: ▪ Removal of the general 10H rule (minimum distance between a wind turbine and residential buildings is 10x

Slide 45: Reform of balancing market
Reform of balancing market ▪ Implementation of balancing market reform (from June 14, 2024): ▪ Implementation of balancing capacity market - pricing for ancillary services set in daily auctions. ▪ Generators responsible for implementation of notified production plans and covering of start-up costs ▪

Slide 46: Poland’s National Energy and Climate plan till 2030
Poland’s National Energy and Climate plan till 2030 1. Ministry of Climate and Environment presented in Sep. 2024 updated National Energy and Climate plan till 2030 2. Plan should be approved by The Council of Ministers by Dec. 2024 3. Updated plan WAM (with additional measures ) include more ambiti

Slide 47: Capacity market – results of auctions
Capacity market – results of auctions PGE contracts 2029 2021 2022 2023 2024 2025 2026 2027 2028 2029 H2 H2 2025 2025 • 2 111 MW in 349 63 Coal units Clearing price • 63 MW in 240.32 198.00 202.99 259.87 172.85 400.39 406.35 244.90 264.90 431.00 DSR (PLN/kW/year) 1435 2 174 Volume contracted 138 MW

Slide 48: Fundamentals of the distribution business (PGE Dystrybucja S.A.)
Fundamentals of the distribution business (PGE Dystrybucja S.A.) RAB (with RAB-AMI) development1 (PLN m) Regulated revenue composition1 (PLN m) 3 963 2 967 3 863 12 258 12 424 1 475 11 504 2 781 2 099 5 390 8 086 6 007 6 394 24 058 19 620 19 806 21 570 4 513 2 439 2 315 2 101 1 496 1 132 1 402 1 324

Slide 49: Fundamentals of the distribution business (PGE Energetyka Kolejowa S.A.)
Fundamentals of the distribution business (PGE Energtyka Kolejowa S.A.- segment of Railway Energy Services) Regulated Asset Base RAB (PLN m) Sales and distribution of electricity (TWh) 1.13 1.12 1.13 1.01 1.01 0.78 0.78 0.79 0.72 0.73 4 701 4 221 3 559 RAB 2023 RAB 2024 RAB 2025 Q1 2024 Q2 2024 Q3 2

Slide 50: Tariffs in district heating – heat generation
Tariffs in district heating – heat generation Tariffs approved by the Energy Regulatory Office for 12-month period Non-CHP plants CHP plants Full cost method Simplified method* (Planned costs and revenues as an input) (Initial price calculated for year 0 adjusted every year) Yearly adjustment ERO pu

Slide 51: RES support schemes
51 RES support schemes Existing Installations 15-year support (since commissioning or since the commissioned until July 2016 beginning of the system: 2005) Biomass co-combustion Hydro >5 MW (undedicated) Other RES No support from No support from 1 MWh = 1 2016 2021 certificate NEW RES GREEN SUPPORT

Slide 52: RES support schemes for installations commissioned after July 2016
RES support schemes for installations commissioned after July 2016 ≤ 10 kW Coefficient 0.8x Net billing for PROSUMERS Net metering* installations (micro installations) commissioned from 10-50 kW Coefficient 0.7x April 2022 RES support schemes – new installations (commissioned until July 2016) 90% of

Slide 53: RES auctions for wind and PV
RES auctions for wind and PV Capacities contracted at Contracted prices in wind and PV 2018-2024 auctions (MW) auctions>1MW (PLN/MWh) 2 500 2221 400 2070 389 378 2 000 365 350 355 340 320 320 324 1560 1548 314 300 295 1 500 285 MW 1150 250 250 250 250 250 1 000 930 793 760 200 594 514 486 150 500 24

Slide 54: Offshore wind support scheme
Offshore wind support scheme Phase I Phase II Administrative decision Auctions (maximum capacity) of the President of ERO. MW Decision of the European Commission on acceptance of the state aid. 2 000 Drafted total of 2 000 17.9GW in Applications should be years submitted by March 31, 4 000 2021-2031

Slide 55: Offshore wind – CFD price-setting process
Offshore wind – CFD price-setting process Maximum settlement Phase II Phase I price of the electricity Minister of Climate and Maximum bid price for Maximum settlement price Environment/Minister of auction of the electricity State Assets Application for decision on -technical and economic parameters

Slide 56: Offshore wind – settlement of the CFD contract
Offshore wind – settlement of the CFD contract ▪ Contract granted for 25 years (counted from the first feeding into the grid electricity from the offshore windfarm). ▪ Electricity volume limited up to 100 000 hours of generation at full capacity. Indicated load factor assuming 25 years of generation

Slide 57: Cogeneration Support Scheme
57 Cogeneration Support Scheme Support length <1 MW <1-50 MW >=50 MW 15 years from the first EXISTING CHP certificate Individual guaranteed MODERNISED 5-6-7 years from the Guaranteed premium premium (CAPEX >=50%*) modernisation SIGNIFICANTLY Enrollment on 15 years after the MODERNISED Pay-as-bid auc

Slide 58: 2023 Price-freeze mechanism
2023 Price-freeze mechanism (simplified, illustrative only) EFFECT ON SUPPLY COVID-19 EFFECT ON GENERATION FUND Compensation for supply companies Revenue surplus Price cap for eligible retail PRICE Maximum price consumers DIFFERENCE allowed for power PAYMENT generators FUND PLN PLN 7 658m 6 569m PGE

Slide 59: Electricity market – price
Electricity market – price /illustrative only/ Energy prices for households- components of the price ERO approved PGE’s G11 tariff for H2 2024-FY2025 at PLN 628/MWh, down 2 000 by approx. PLN 115/MWh against tariff approved in Dec. 23 for FY2024. Resulting loss in H2 2024 was estimated at PLN 550m.

Slide 60: Financials
Financials

Slide 61: Cash from operations, investments and net debt
Cash from operations, investments and net debt Consolidated Cash Flows . . . . . . PLN m Q1 2025 Q1 2024 2024 2023 Operating CF 4 738 -2 339 10 806 3 269 Investing CF -1 910 -2 140 -10 300 -11 451 Financial CF -1 576 2 769 -2 176 2 328 Change of cash and equivalents 1 252 -1 710 -1 670 -5 854 Consol

Slide 62: Debt development and structure (Mar. 31, 2025)
Debt development and structure (Mar. 31, 2025) Gross debt and net debt (in PLN million) 25 000 20 000 15 000 10 000 5 000 0 -5 000 Gross debt Net debt Currency profile of drawn debt Fixed vs floating rates (including hedging transactions) (drawn debt) 1% 4% Fixed 71% 95% Floating 29% 62 EUR PLN USD

Slide 63: Debt maturity and available financing
Debt maturity and available financing Drawn debt and availability of external financing (in PLN m) as at March 31, 2025 18 000 16 000 14 000 12 000 10 000 8 000 6 000 4 000 2 000 0 Environmental funds EBRD EIB Current account credit Domestic bonds' EMTN program Revolving loans BGK BGK - KPO* loans O

Slide 64: Stable finances
Stable finances Q1 2025 2024 Gross Debt (PLN bn) 13.5 15.2 Net debt (PLN bn) 8.1 11.0 Net Debt/LTM EBITDA 0.58x 0.90x Debt position Net Economic Financial Debt (PLN bn) 16.6 17.2 NEFD/ LTM EBITDA recurring 1.31x 1.58x Net Debt/Equity 0.17x 0.24x MOODY’S FITCH Long-term company rating (IDR) Baa1 BBB

Slide 65: Disclaimer
Disclaimer This presentation has been prepared by the management of PGE Polska Grupa Energetyczna S.A. (the “Company” or “PGE”) and other entities. This presentation does not constitute or form part of and should not be constructed as, an offer to sell, or the solicitation or invitation of any offer

Slide 66: Investor Relations contacts
Investor Relations contacts Filip Osadczuk Krzysztof Dragan Stanisław Ozga CFA IR and ESG Director [email protected] [email protected] [email protected] Tel: (+48 22) 340 12 24 Tel: (+48 22) 340 15 13 Tel: (+48 22) 340 12 69 Mob: +48 695 501 370 Mob: +48 601 334 290 Mob: +48 887
Source: Internet Archive copy of gkpge.pl
More decks from PGE Polska Grupa Energetyczna S.A.
FY2025 Earnings Presentation21 slides · Apr 16, 2026
FY2025 Earnings Presentation21 slides · Apr 16, 2026
Q4 2025 Earnings Presentation53 slides · Apr 15, 2026
FY2025 Earnings Presentation53 slides · Apr 15, 2026
Technical Presentation (March 2026)43 slides · March 2026
Investor Presentation (January 2026)95 slides · January 2026