ACS, Actividades de Construccion y Servicios SA · BME:ACS

ACS, Actividades de Construccion y Servicios SA — Investor Day (November 2026)

18 slides from ACS, Actividades de Construccion y Servicios SA's investor day presentation, Nov 12, 2026

  1. Slide 1: 2026 Capital Markets Day: Digital & Energy Infrastructure

    Slide 1: 2026 Capital Markets Day: Digital & Energy Infrastructure

    2026 Capital Markets Day Digital & Energy Infrastructure November 12th, 2026

  2. Slide 2: From Concept to Execution: Our 3-Year Evolution

    Slide 2: From Concept to Execution: Our 3-Year Evolution

    FROM CONCEPT TO EXECUTION: OUR 3-YEAR EVOLUTION SCALED INTO A WORLD- STRONG COMMERCIAL LAYING THE LEADING DATA CENTER TRACTION ACROSS THE GROUNDWORK FOR AN DEVELOPER PORTFOLIO EXPANSION INTO THE TECH STACK >2.1 GW IT AI GIGAFACTORY 2030 development target already LARGE Consortium partner in the reac

  3. Slide 3: A Rapidly Changing Market Landscape

    Slide 3: A Rapidly Changing Market Landscape

    A RAPIDLY CHANGING MARKET LANDSCAPE GRID CONSTRAINTS SOCIAL LICENCE TIME-TO-MARKET SOVEREIGN BLURRING STACK & TIGHTER RULES TO OPERATE CHALLENGE MIGRATION SHIFT BOUNDARY Extended connection Community expectations Compressing delivery Increasing reliance on Traditional boundaries queues, curtailment

  4. Slide 4: Rigorous Capital and Development Discipline

    Slide 4: Rigorous Capital and Development Discipline

    Fungible Data Center Capacity Sites and configurations for broad market appeal, ensuring asset liquidity across diverse tenant profiles Early Portfolio De-Risking Selection of sites with highly visible pathway to power and zoning rights Early involvement of ACS construction capabilities, to ensure g

  5. Slide 5: Geographically Diversified >2 GW IT Portfolio, with Active Power Banking

    Slide 5: Geographically Diversified >2 GW IT Portfolio, with Active Power Banking

    GEOGRAPHICALLY DIVERSIFIED >2 GW IT PORTFOLIO, WITH ACTIVE POWER BANKING ACROSS REGIONS FOR FURTHER CAPACITY CORAVEL – MW IT OWN DEVELOPMENT – MW IT OWN DEVELOPMENT – MW PV SMALL SCALE DATA CENTER SITES AMERICAS 432 MW IT >830 MW IT EUROPE 670 MW IT TBD c.350 MW PV APAC 180 MW IT GERMAN GIGAFACTORY

  6. Slide 6: Engineered to deliver. Built to last.

    Slide 6: Engineered to deliver. Built to last.

    @ACS comme «= CORAVEZ Engineered to deliver. Built to last. We deliver mission-critical digital infrastructure with certainty, speed, and resilience to power the next generation of Al and cloud technologies.

  7. Slide 7: Coravel: 50/50 Joint Venture with Global Infrastructure Partners

    Slide 7: Coravel: 50/50 Joint Venture with Global Infrastructure Partners

    CORAVEL | 50/50 JOINT VENTURE WITH GLOBAL INFRASTRUCTURE PARTNERS1 WITH TARGET OF 1.2 GW IT OPERATIONAL BY 2032 AND THE FIRST HYPERSCALER LEASE SIGNED Operational Capacity Coravel (GW IT) 50/50 Joint Venture with ACS total expected €2.2bn investment2 1.2 1.1 0.9 1.2 GW IT Portfolio under development

  8. Slide 8: Coravel: Initial Projects at Advanced Stage with Significant Commercial Traction

    Slide 8: Coravel: Initial Projects at Advanced Stage with Significant Commercial Traction

    CORAVEL | INITIAL PROJECTS ARE AT AN ADVANCED STAGE OF DEVELOPMENT WITH SIGNIFICANT COMMERCIAL TRACTION Expected IT capacity1 Development status Power status COD2,3 MAD I, ESP 94 MW IT • Generator long-lead equipment released for 2nd building Power available on 2027-2029 (3 buildings) • LOI4 in nego

  9. Slide 9: Coravel: Value Proposition

    Slide 9: Coravel: Value Proposition

    CORAVEL | VALUE PROPOSITION AN INTEGRATED, DEMAND-LED PLATFORM COMBINING POWER, CAPITAL AND CONSTRUCTION TO COMPRESS TIMELINES FROM SITE ORIGINATION TO OPERATIONAL DATA CENTER DELIVERY DFW I, TX (232 MW IT) MAD I (94 MW IT) - MEL I (180 MW IT) Steel structure Aerial view of the pad DC & Substation E

  10. Slide 10: ACS Own Developments: Projects at Different Stages of Development

    Slide 10: ACS Own Developments: Projects at Different Stages of Development

    ACS OWN DEVELOPMENTS | PROJECTS ARE AT DIFFERENT STAGES OF DEVELOPMENT, TARGETING COD FOR 0.9 GW IT BY 2030 Expected IT capacity1 Development status Power status COD2,3 • Power applied for (1st • Land secured SCL I, CHI 24 MW IT • Preliminary design completed in substation queue) 2029-2030 (1 buildi

  11. Slide 11: ACS Own Developments: 810MW IT CMH I Campus in Ohio

    Slide 11: ACS Own Developments: 810MW IT CMH I Campus in Ohio

    ACS OWN DEVELOPMENTS | 810MW IT CMH I CAMPUS IN OHIO, TARGETING COMMERCIALIZATION IN 2027 CMH I, OH Washington County, Ohio CMH I, OH 1.2 GW capacity (810 MW IT) secured through AEP Tier I adjacent market, close to established hyperscalers c.$400mn invested to date Engaging with key local stakeholde

  12. Slide 12: Energy Infrastructure Capabilities Are a Key Differentiator

    Slide 12: Energy Infrastructure Capabilities Are a Key Differentiator

    ENERGY INFRASTRUCTURE CAPABILITIES ARE A KEY DIFFERENTIATOR IN THE MARKET, DE-RISKING OUR DEVELOPMENTS WHAT WE HAVE BUILT ALONGSIDE DATA CENTERS 01 WE HAVE THE CAPABILITIES TO DESIGN AND BUILD SECURED GRID ACCESS GENERATION, STORAGE AND CONNECTION Securing grid capacity by working closely with major

  13. Slide 13: Our Vision: Staying at the Forefront of End-to-End Infrastructure

    Slide 13: Our Vision: Staying at the Forefront of End-to-End Infrastructure

    OUR VISION STAYING AT THE FOREFRONT OF END-TO-END INFRASTRUCTURE OFFERS THE OPPORTUNITY TO BRIDGE PHYSICAL ASSETS WITH ADVANCED TECHNOLOGY SOLUTIONS Large scale Small scale Hyperscale campuses, long-duration leases with Modular sites ensuring sovereignty, proximity, Hyperscalers and AI players effic

  14. Slide 14: Small Scale DC Offering: Modular Efficient Data Centers

    Slide 14: Small Scale DC Offering: Modular Efficient Data Centers

    SMALL SCALE DC OFFERING | MODULAR EFFICIENT DATA CENTERS WITH SOVEREIGN INFRASTRUCTURE AS A SERVICE SOLUTION SMALL, EFFICIENT SOVEREIGN European sovereign AI and compute services DATA CENTERS INFRASTRUCTURE Inference services Power, cooling & sensors AS A SERVICE Platform as a service Construction &

  15. Slide 15: Small Scale DC: From First Sites in Germany to >30 Sites Across Europe

    Slide 15: Small Scale DC: From First Sites in Germany to >30 Sites Across Europe

    SMALL SCALE DC | FROM THE FIRST SITES IN GERMANY TO >30 SITES ACROSS EUROPE BY 2030, 2 FIRST SITES ALREADY COMMERCIALIZED Ramping up construction of small scale DCs Commercialization successes Cumulative installed small scale DCs per year (#) 2DC commercialized and 4 in adv. negotiations 45-60 Sover

  16. Slide 16: Portfolio Value Scale: Targeting €16-18bn Equity Value by 2032

    Slide 16: Portfolio Value Scale: Targeting €16-18bn Equity Value by 2032

    PORTFOLIO VALUE SCALE: TARGETING €16-18BN EQUITY VALUE BY 2032 (FROM €4.2BN) ACS DC Portfolio Equity Value yearly evolution (€bn) €16-18bn Equity Value expected by 2032 with current portfolio and pipeline Current DC Business valuation 16-18 more than quadrupled since the 13-15 2025 Investor Day 7-9

  17. Slide 17: The Horizon Ahead: Unlocking Long-Term Value

    Slide 17: The Horizon Ahead: Unlocking Long-Term Value

    THE HORIZON AHEAD: UNLOCKING LONG-TERM VALUE THROUGH THE DELIVERY OF INTEGRATED DIGITAL & ENERGY ASSETS 03 Next-Generation Digital 02 Infrastructure: Redefining asset boundaries through Visible value creation integrated off-grid/BTM 01 and with a clear path energy capabilities and a Commercial Momen