Melbana Energy Limited · ASX:MAY

Melbana Energy — 3rd Annual Cuba Energy Oil and Gas Conference 2019

14 slides from Melbana Energy's conference presentation, Nov 26, 2019

  1. Slide 1: Melbana Energy in Cuba – An international perspective

    Slide 1: Melbana Energy in Cuba – An international perspective

    Melbana Energy in Cuba – An international perspective 3rd Annual Cuba Energy Oil and Gas Havana, Cuba 26 – 29 November 2019

  2. Slide 2: Company Overview

    Slide 2: Company Overview

    Company Overview Company Data Listed 1998 Exchange ASX (“MAY”) Shareholders Cadence Capital ~ 7% Board/Management ~5% Top 20 ~ 28% Board and Management Board of Directors Experienced Board and Management Andrew Purcell Peter Stickland Michael Sandy  Decades of international experience in Oil & Non-

  3. Slide 3: Major Projects Summary

    Slide 3: Major Projects Summary

    Major Projects Summary Cuba (Block 9, 100%) USA • Onshore block in proven hydrocarbon system • Potential of ~15.7 billion barrels of oil in place, USA USA recoverable Prospective Resources of 676 Cuba million barrels of oil1 Block 9 Santa Cruz IOR Cuba (Santa Cruz) • Binding agreement signed Dec 201

  4. Slide 4: Cuba – Why?

    Slide 4: Cuba – Why?

    Cuba – Why? • Under-explored • Huge oil potential • Produce half of domestic needs • Reported low operating costs • Investment climate − No evidence of corruption − Government support for oil industry − Tax rate − Tax holiday • Good local infrastructure • Educated workforce • Early mover advantage a

  5. Slide 5: Cuba, Block 9 – Resource Assessment

    Slide 5: Cuba, Block 9 – Resource Assessment

    Cuba, Block 9 – Resource Assessment McDaniel & Associates assess Prospective Resources up to 1.5 billion barrels • Large footprint - 2,344km2 • Lightly explored • Along trend from Varadero oil field • 3 prospects, 16 leads identified • Potential for large Varadero type structures • Cuba experts McDa

  6. Slide 6: Cuba, Block 9 – 19 Leads in Conventional Play

    Slide 6: Cuba, Block 9 – 19 Leads in Conventional Play

    Cuba, Block 9 – 19 Leads in Conventional Play Highlights • Along trend from Varadero • Varying qualities of oil recovered • Motembo, oldest oil field in Cuba is very light oil • Sherritt drilling in Block 10 • Discussions with potential partners − 2 wells starting Q3 2020 − Alameda and Zapato curren

  7. Slide 7: Cuba, Block 9 - Alameda Prospect

    Slide 7: Cuba, Block 9 - Alameda Prospect

    Cuba, Block 9 - Alameda Prospect Multi-target exploration drilling close to historic oil recoveries • Three individual target zones for Alameda, two up-dip of known oil recoveries • Marti-5 (1988) recovered oil (24°API) with oil shows over an 850 metre gross interval • 32% chance of success at Alame

  8. Slide 8: Cuba, Block 9 – Zapato Prospect

    Slide 8: Cuba, Block 9 – Zapato Prospect

    Cuba, Block 9 – Zapato Prospect Multiple structures with 200 million barrel oil exploration potential • Large fractured carbonate objective • Working oil system - adjacent to shallower Motembo oil field which produced high quality light crude (50 – 64.5° API) • Crest of structure ~2,000 metres with

  9. Slide 9: Block 9 - Preparations for drilling

    Slide 9: Block 9 - Preparations for drilling

    Block 9 - Preparations for drilling Securing people, permits, equipment and services • Field work surveys completed for Alameda-1 and Zapato-1 well and camp sites • Civil engineering design completed • Preferred civil works contractor identified Permitting • Well defined regulatory process • Stakeho

  10. Slide 10: Great things about Cuba

    Slide 10: Great things about Cuba

    Great things about Cuba • People & Culture − No evidence of corruption − Excellent access to well educated and experienced people − Excellent health care system − Friendly − Resilient • Physical Environment − Safe environment for foreign workers − Well located for long term access to markets in Lati

  11. Slide 11: Some challenges when operating in Cuba

    Slide 11: Some challenges when operating in Cuba

    Some challenges when operating in Cuba • Like every country, operating in Cuba has some challenges • “Cuba-time” effect • Restrictions on sourcing of staff • Banking system and usage interface is ready for modernisation • Internet infrastructure improving, but still needs improvement for business •

  12. Slide 12: Near term business events in Cuba for Melbana

    Slide 12: Near term business events in Cuba for Melbana

    Near term business events in Cuba for Melbana……. Sign binding agreement for Block 9 farmout (Q1 2020) Sign binding agreement for Santa Cruz (Q1 2020) Block 9 drilling of first exploration well (Q4 2020) Block 9 drilling of second exploration well (Q1 2021)

  13. Slide 13: Disclaimer

    Slide 13: Disclaimer

    Disclaimer Forward-looking Statements and Resources Summary of information: This presentation contains general and background information about Melbana Energy’s activities current as at the date of the presentation and should not be considered to be comprehensive or to comprise all the information t

  14. Slide 14: Please visit our website for more information

    Slide 14: Please visit our website for more information

    Please visit our website for more information and/or follow us on LinkedIn and Twitter Andrew Purcell Melbana Energy Limited [email protected] Telephone: +61 (3) 8625 6000 www.melbana.com

Source: Internet Archive copy of melbana.com

More decks from Melbana Energy Limited

All 90 Melbana Energy decks