Sundance Energy Inc

Sundance Energy — Sundance Energy Australia — Investor Presentation (June 2017)

16 slides from Sundance Energy's investor presentation, Jun 5, 2017

  1. Slide 1: Disclaimers

    Slide 1: Disclaimers

    Disclaimers This presentation has been prepared by Sundance Energy Australia Limited (ABN 76 112 202 883). Summary information This presentation contains summary information about Sundance and its activities current as at 22 May 2017 ("Information"). The Information in this presentation is subject t

  2. Slide 2: Executive summary

    Slide 2: Executive summary

    EOG EOG EOG Protege Chesapeake Murphy Anadarko SM-Energy Pioneer Pioneer Pioneer Conoco Conoco Cabot Chesapeake Chesapeake Repsol Repsol Marathon BHP BHP Chesapeake Marathon N Murphy Swift 50 miles Oil Window GOR < 750 Volatile Oil & Condensate Window Dry Gas Window Carrizo PVR Sundance acreage Lewi

  3. Slide 3: Pure play Eagle Ford aggregator

    Slide 3: Pure play Eagle Ford aggregator

    Pure play Eagle Ford aggregator Eagle Ford position has grown to 42,800 net acres since entering basin in 2013 Divested Oklahoma assets for net proceeds of $16.6 million in 2017 Utilize leading edge well designs to maximize economics Top 2 180-day initial production rates in core operating area 2017

  4. Slide 4: 2017 Development Plan: capital expenditures

    Slide 4: 2017 Development Plan: capital expenditures

    Drilling substantially completed for 2017 (10 of 14 new wells drilled by end of May) Schlumberger onsite and completing 3-well Teal-Hoskins pad 2017 Development Plan 13 of 15 net wells in McMullen Area - 5 10 15 20 25 30 35 40 45 - 1 2 3 4 5 6 7 8 9 10 Q1 Actual Q2E Q3E Q4E Cap ex $ millions Net Wel

  5. Slide 5: 2017 Development Plan: production

    Slide 5: 2017 Development Plan: production

    Q2E impacted by sale of OK production (650 boe/d) and 1,000 boe/d of declines & offset shut-ins for fracs Exit rate driven by 11 net wells with initial production rates in the second half of 2017 in highly proven McMullen County area Production mix 70% oil/12% NGLs 2017 Development Plan 15 net well

  6. Slide 6: 2017 Development Plan: cost structure

    Slide 6: 2017 Development Plan: cost structure

    2017 Development Plan Cost structure Note: F&D is PDP Finding & Development costs and G&A represents cash G&A. F&D cost increase due to higher costs on new frac design modelled against recoveries from old designs Production growth in second half of 2017 leads to dilution of fixed operating costs - 5

  7. Slide 7: Balance Sheet & Hedges

    Slide 7: Balance Sheet & Hedges

    Balance Sheet & Hedges Net Debt 31 March 2017 cash of $12.4mm (unaudited) plus net proceeds of Oklahoma asset sale ($16.6mm) As of 22 May 2017. 2017 hedges represent the remaining hedges for 2017. Reserve report based on Ryder Scott valuation (dated as of 1 January 2017) using NYMEX strip prices as

  8. Slide 8: McMullen, Atascosa and Live Oak Counties Asset Overview

    Slide 8: McMullen, Atascosa and Live Oak Counties Asset Overview

    236 gross remaining locations with 35 net remaining refrac candidates(1) 87 Eagle Ford PDP wells Typical well has >525,000 boe EUR and IRR of ~42% McMullen, Atascosa and Live Oak Counties Asset Overview Proven track-record of improving results Eagle Ford producing wells N 5 miles Atascosa Live Oak S

  9. Slide 9: Dimmit County Asset Overview

    Slide 9: Dimmit County Asset Overview

    Dimmit County Asset Overview Upside in Large Contiguous Position Eagle Ford producing wells 260 gross remaining locations with proven stagger stack development 14 EGFD PDP wells Typical well has 464,000 boe EUR and IRR of ~30% N 4 miles Dimmit Volatile Oil Window SEA acreage Web Red Ranch EFS 32HC C

  10. Slide 10: Eagle Ford Inventory Analysis

    Slide 10: Eagle Ford Inventory Analysis

    Eagle Ford Inventory Analysis Remaining Drilling Locations(1) Note: Additional details provided for LLEF, ULEF, Refracs, and Dimmit in the Appendix Based on internal Company estimates as at May 2017. McMullen includes Live Oak and Atascosa ULEF: Upper-Lower Eagle Ford LLEF: Lower-Lower Eagle Ford 10

  11. Slide 11: Summary

    Slide 11: Summary

    Summary 3 well Teal-Hoskins pad IP (July 2017) 3 well Liberstat pad IP (July 2017) Peak rates from new Dimmit completion designs (June 2017) 9,000-10,000 boe/d production rate (exit rate) 5 McMullen well IPs (Aug-Sep 2017)

  12. Slide 12: Appendix

    Slide 12: Appendix

    Appendix

  13. Slide 13: Hedge Summary

    Slide 13: Hedge Summary

    Hedge Summary As of 22 May 2017. 2017 represents the remaining hedges for 2017 HEDGE CONTRACTS (1) PRICING OIL Boe Bbl Per Day Floor Ceiling 2017 509,000 2,379 Bbls of oil hedged for 2017 48.93 59.16 2018 612,000 1,677 Bbls of oil hedged for 2018 49.89 58.91 2019 300,000 822 Bbls of oil hedged for 2

  14. Slide 14: Management Team

    Slide 14: Management Team

    Management Team Eric McCrady, Managing Director & CEO Eric was appointed CEO in April 2011 and Managing Director of the Board in November 2011. He served as CFO from June 2010 until becoming CEO. Eric has over 15 years of entrepreneurial experience with an extensive track record in investment evalua

  15. Slide 15: Board of Directors

    Slide 15: Board of Directors

    Board of Directors Mike Hannell, Chairman 45 years’ experience in upstream and downstream petroleum industry. Previously held senior positions with Santos Ltd and Mobil Oil. Eric McCrady, Managing Director & CEO Previously CFO of Sundance Energy. More than 15 years’ entrepreneurial experience with a

  16. Slide 16: Board of Directors

    Slide 16: Board of Directors

    Board of Directors Mike Hannell, Chairman 45 years’ experience in upstream and downstream petroleum industry. Previously held senior positions with Santos Ltd and Mobil Oil. Eric McCrady, Managing Director & CEO Previously CFO of Sundance Energy. More than 15 years’ entrepreneurial experience with a

Source: SEC EDGAR · 6-K filed Jun 5, 2017

More decks from Sundance Energy Inc