Company news

Cabral Gold, Inc. news in 2025

Cabral Gold, Inc.'s news releases, calls and decks from 2025, newest first.

View company

Cabral Gold Reports on Construction Progress at Cuiú Cuiú Gold Project

December 17, 2025

Cabral Gold Drills New Mineralized Structure Connecting PDM and Central Gold Deposits, Cuiú Cuiú Gold District, Brazil

December 4, 2025

Cabral Gold Announces Closing of US$45.1 Million Gold Loan and Draw Down to Fully Fund Heap Leach Starter Operation

November 26, 2025

Cabral Gold Drills 7m @ 5.1 g/t Gold at the Machichie NE Target and Extends High-Grade Zone Down-Dip, Cuiú Cuiú Gold District, Brazil

November 20, 2025

VIDEO - CEO Clips Cabral Gold: Advancing a High-Grade District in Brazil Through Near-Term Production

October 28, 2025

Cabral Gold Drills 23m @ 4.7 g/t gold at the PDM target, Cuiú Cuiú Gold District, Brazil

October 22, 2025

Cabral Gold Secures US$45 Million Gold Loan to Fully Fund Heap Leach Starter Operation

October 16, 2025

Cabral Gold Expands the Gold-in-Oxide Blanket at PDM by 50% and Discovers Two New Zones of Primary Gold Mineralization at the PDM Target, Cuiu Cuiu Gold District

September 25, 2025

Cabral Gold Announces Filing of NI 43-101 Technical Report for Updated Prefeasibility Study on the Gold-in-Oxide Starter Operation at the Cuiú Cuiú Gold Project, Brazil

September 11, 2025

Cabral Gold Announces the Appointment of Vinícius Resende Domingues to Board of Directors

July 31, 2025

Cabral Gold Announces Results of Updated Prefeasibility Study on the Gold-in-Oxide Starter Operation at the Cuiú Cuiú Gold Project, Brazil

July 29, 2025

Cabral Gold Announces U.S. Listing on OTCQB

July 24, 2025

Cabral Gold Reports 88-96% Gold Recoveries from Metallurgical Test Work at Machichie. Adds Two Drill Rigs to Accelerate Exploration

June 17, 2025

Cabral Gold Drills 49m @ 2.0 g/t Gold at the Jerimum Cima Target, Cuiú Cuiú Gold District, Brazil

May 21, 2025

Cabral Gold Appoints Luiz Celaro as Construction Manager for Cuiú Cuiú Gold Project

May 15, 2025

Cabral Gold Drills 2m @ 52.3 g/t Gold at the Machichie Main Gold Deposit, Cuiú Cuiú Gold District, Brazil

May 13, 2025

Cabral Gold Announces Closing of Upsized Financing for $14.9 Million in Proceeds

May 6, 2025

Cabral Gold Announces Upsizing of Best Efforts Financing to $13 Million

April 25, 2025

Cabral Gold Announces an up to $10 Million Best Efforts Financing Including an Investment by Mr. Eric Sprott

April 23, 2025

Cabral Gold Inc. Final Short Form Base Shelf Prospectus Is Accessible on SEDAR+

April 8, 2025

Cabral Gold Drills 12m @ 27.7g/t Gold at the Machichie NE Target, Cuiú Cuiú Gold District, Brazil

April 3, 2025

Cabral Gold Drills 3m @ 15.9 g/t gold and Discovers New Mineralized Zone at the Machichie Main Gold Deposit, Cuiú Cuiú Gold District, Brazil

March 26, 2025

Cabral Gold Trenches 20m @ 3.6 g/t Gold on Surface at the Machichie Main Gold Deposit, Cuiú Cuiú Gold District, Brazil

March 13, 2025

Cabral Gold Provides Update for Cuiú Cuiú Gold District, Brazil

February 13, 2025

Cabral Gold Reviews Progress During 2024 and Outlines Plans for 2025 at Cuiú Cuiú Gold District, Brazil

January 7, 2025