Scotia Metals Corp. · CSE:SMET

Scotia Metals — Investor Presentation (November 2026)

20 slides from Scotia Metals's investor presentation, November 2026

  1. Slide 1: Acadia Lithium Project

    Acadia Lithium Project Nova Scotia, Canada District-Scale Hard-Rock Spodumene Lithium Opportunity CSE: SMET | scotiametals.com Corporate Presentation | Nov 2026

  2. Slide 2: Investment Highlights

    Investment Highlights FIRST-MOVER ADVANTAGE Largest lithium landholder in Nova Scotia: 43 licenses, 37,268 Ha, 2,320 mineral claims DISTRICT-SCALE FOOTPRINT Covering >80 km of prospective strike for Li pegmatites HIGH-GRADE SPODUMENE AT SURFACE (GREEN WOLF TARGET) Five distinct boulder trains identi

  3. Slide 3: Track Record

    Galaxy Resources & Track Record Orocobre Merger Sigma Lithium C$9+ BILLION IN VALUE CREATION FOR SHAREHOLDERS TSXV: SGML) ¹ Market Capitalization as of Oct, Current Market Cap1 2026. All Amounts in CAD. Dolly Varden Silver Merged with Contango Silver Gladiator Metals Northern Empire (TSXV: GLAD) Res

  4. Slide 4: Leadership Team

    Leadership Team Nick Rowley | Director • 18+ years in corporate development, M&A, and lithium raw materials markets Brian Talbot | Chairman • Director at RTEK International, a global firm specializing in project implementation, capital raising, and offtake structuring across the battery metals suppl

  5. Slide 5: Nova Scotia: A New Spodumene-Rich Hard-Rock Lithium Jurisdiction

    Nova Scotia: A New Spodumene-Rich Hard-Rock Lithium Jurisdiction An Underexplored Lithium Jurisdiction With Proven Spodumene Fertility and Significant Discovery Upside Historically explored for gold and tin with minimal modern lithium exploration Brazil Lake - the only known spodumene deposit in the

  6. Slide 6: Acadia Project Overview

    Acadia Project Overview District-Scale Land Position Along a Proven Lithium-Bearing Structural Corridor ~80 km of prospective strike along a shear-zone controlled system known to host spodumene-rich pegmatites  Directly adjacent to and on strike with Brazil Lake Li deposit (10Mt @ 1.20% Li₂O)1  Fi

  7. Slide 7: Priority: Green Wolf Target

    Priority: Green Wolf Target Surface Sampling Has Refined the Green Wolf Discovery Target Five Distinct Spodumene-Bearing Boulder Trains  32 historical boulder samples graded 1.0% - 3.40% Li2O, including seven grading between 2.0% and 3.40% Li2O  Boulder trains outlined across approximately 3 km ×

  8. Slide 8: Green Wolf Target: Evidence for a Potential Bedrock Source

    Green Wolf Target: Evidence for a Potential Bedrock Source Boulder Characteristics and Structural Setting Guide the Next Exploration Phase Geological Interpretation of Surface Float Consistent High-Grade Mineralization  Spodumene-bearing float occurs across multiple interpreted trains, providing ta

  9. Slide 9: Green Wolf Target: Advanced Targeting Intelligence

    Green Wolf Target: Advanced Targeting Intelligence Independent Datasets Converge to Refine High-Confidence Drill Targets Regional Lithium Anomaly Corridor  Regional lake-sediment geochemistry identifies strong lithium anomalies along the Brazil Lake- Green Wolf trend, supporting further exploration

  10. Slide 10: Neighbouring Deposit: Brazil Lake

    Neighbouring Deposit: Brazil Lake Brazil Lake demonstrates that spodumene-rich pegmatites can be discovered and developed within this exact system  Located directly south of Green Wolf Target: first proven spodumene-rich LCT  Three known spodumene-rich dykes (North, South, and Army Road)  Drillin

  11. Slide 11: 2026 - 2027 Work Program

    2026 - 2027 Work Program Clear Pathway from Discovery Drilling to Maiden Resource Green Wolf Target (Near-Term Focus) modelling  Detailed till sampling to refine high-priority zones  Ground geophysics (IP/AMT, gravity etc.) to prioritize drill targets  Integration of boulder sampling, till geoche

  12. Slide 12: Infrastructure Advantage

    Infrastructure Advantage Acadia Project offers a rare combination of exploration upside and development-ready logistics in a Tier-1 jurisdiction ~300 km from the City of Halifax  Shelburne Port: 1 hour drive from the project; 13 m draft, suitable for deep- water vessels and barges.  Yarmouth Port:

  13. Slide 13: The Lithium Price Cycle: Rebalance & Early Recovery

    The Lithium Price Cycle: Rebalance & Early Recovery Lithium Price Forecast and Scenarios  A 2022–23 supply surge saw lithium prices collapse: too many lithium projects came online at once after the 2022 boom, pushing prices down faster than demand slowed  ‘Oversupply’ sentiment is now correcting:

  14. Slide 14: Near-Term Lithium Market Update

    Near-Term Lithium Market Update1 Spodumene and lithium chemical price Lithium Prices Tighten Near-Term; Producers Show Strong Leverage Market backdrop • Spodumene (SC6) rebounded sharply, from ~US$816/t (Q3 2025) to ~US$1,046/t (Q4 2025 avg) to ~US$2,200/t+ entering 2026 • Supply disruptions (China/

  15. Slide 15: Long-Term Lithium Outlook

    Long-Term Lithium Outlook1 Demand Growth Intact; Surplus Extended Before Structural Deficit Demand Supply  EV and Energy Storage (ESS) remain primary drivers  Higher supply revisions from China & Australia & secondary/recycling  ESS accelerating (data centers and grid storage)  Near-term surplus

  16. Slide 16: Why Hard-Rock (Spodumene) Lithium?

    Why Hard-Rock (Spodumene) Lithium? Rapidly Rising Global Lithium Demand Drives Hard-Rock Supply Needs Conventional hard-rock mines can advance from discovery to production in years, not decades Lithium Supply-Demand Forecast Grades are directly measured in hard-rock drill core, while brine-hosted li

  17. Slide 17: Why Invest Now

    Why Invest Now Dominant Land Position Proven Lithium System Discovery Catalyst 37,268 Ha 3.40% Li₂O Green Wolf Largest lithium land package in Adjacent to Brazil Lake’s confirmed Five high-grade spodumene boulder Atlantic Canada — 43 licences deposit (10 Mt @ 1.20%). Boulders trains identified at Gr

  18. Slide 18: Capitalization Table & Share Structure

    Capitalization Table & Share Structure 45,353,041 1,275,000 Common Shares Options** 6,500,000 2,500,000 Warrants (@ $0.25)* RSUs*** *Exp. May 2027 **1,175,000 @ $0.25, exp. July 2031; 100,000 @ $0.40 exp. Aug 2031 55,628,041 ***Exp. Aug 2028 Fully Diluted 18 S CO T I A M E T A LS CO R P | CS E : S M

  19. Slide 19: Disclaimer

    Disclaimer Disclaimer This presentation does not constitute an offer to sell or the solicitation of an offer to buy, nor shall there be any sale of the securities of Scotia Metals in any jurisdiction in which such offer, solicitation or sale would be unlawful prior to registration or qualification u

  20. Slide 20: Thank you

    Thank you Contact Us Scotia Metals Corp. Acadia Lithium Project | Nova Scotia, Canada CSE: SMET [email protected] | www.scotiametals.com

Scotia Metals — Investor Presentation (November 2026) on 6ix