  1. Slide 1: Setting the Standard in Mine Development

    Setting the Standard in Mine Development April, 2011

  2. Slide 2: Forward-Looking Statements

    Forward-Looking Statements Some of the statements contained in the following material are "forward-looking statements". All statements in this release, other than statements of historical facts, that address estimated mineral resource and reserve quantities, grades and contained metal, and possible

  3. Slide 3: The Taseko Advantage

    The Taseko Advantage • ~$200 million cash on hand ($1/share) Financial • Significant cash flow at current metal prices Strength • Debt free • Diversified project pipeline of 100% owned, near-term gold, copper and Growth niobium projects • 90% copper production increase by 2014 • Assets located in se

  4. Slide 4: Assets Located in British Columbia

    Assets Located in British Columbia British Columbia Aley (Niobium) Mackenzie Gibraltar Harmony (Copper / Moly) (Gold) Williams Lake Prosperity (Gold / Copper) Vancouver

  5. Slide 5: Financial Strength

    Financial Strength Strong Balance Sheet $800 $700 $600 $500 (C$, millions) $400 $300 $200 $100 $0 2007 2008 2009 2010 Cash and Equivalents Total Assets Shareholders' Equity

  6. Slide 6: Asset Stability: Gibraltar Copper Mine

    Asset Stability Gibraltar Copper Mine Location: 65 km north of Williams Lake, British Columbia Ownership: 75% Mineral Reserves: 2.7 billion pounds recoverable copper under review 30 million pounds recoverable molybdenum Mine Type: Open-pit, 55,000 tpd mill throughput Mine Life: +20 years under revie

  7. Slide 7: Asset Growth: GDP3 Project Scope and Reserve Update

    Asset Growth Gibraltar Copper Mine GDP3 Project Scope • Construction of a new 55,000 tpd concentrator • Expansion of mining fleet to allow 85,000 tpd ore delivery; 330,000 tpd mining rate • Construction of a new molybdenum separation facility • Upgrade site infrastructure to support higher mining ra

  8. Slide 8: Asset Growth: Project Rationale

    Asset Growth Gibraltar Copper Mine Project Rationale • Based on a conservative $1.50/ pound margin, the project has a simple payback of 3 years • Project completion by December 2012 • Take advantage of current copper curve • Transitional growth until Prosperity Federal EA Certificate received • Low

  9. Slide 9: Asset Growth: Production Profile

    Asset Growth Gibraltar Copper Mine Production Profile • By 2013 copper production will have increased by 70% and molybdenum production will increased by 170% GDP3 Construction GDP3 Ramp Up Commenced Annual Estimated Production 2011 2012 2013 2014 2015 (million lbs) Copper 95 115 165 180 180 Molybden

  10. Slide 10: Asset Growth: Capital Costs & Financing

    Asset Growth Gibraltar Copper Mine Capital Costs & Financing Source of Funds: Use of Funds: C$M % of total C$M % of total Cash and debt* $ 176 54% Concentrator & Moly Plant $ 235 72% Equipment financing $ 90 28% Mining Equipment $ 90 28% JV Partner $ 59 18% Total $325 100% Total $325 100% *Company e

  11. Slide 11: Asset Growth: Preliminary GDP3 Timeline

    Asset Growth Gibraltar Copper Mine Preliminary GDP3 Timeline Drill Program Reserve update Project Engineering Procurement Construction Commissioning 2011 2012 2013 2014

  12. Slide 12: Growth: Project Pipeline

    Growth: Project Pipeline 100% Owned Assets British Columbia • Prosperity Gold/Copper Project Aley (Niobium) Mackenzie • Aley Niobium Project Gibraltar • Harmony Gold Project Harmony (Copper / Moly) (Gold) Williams Lake Prosperity (Gold / Copper) Vancouver

  13. Slide 13: Growth: Prosperity Gold-Copper Project

    Growth Prosperity Gold-Copper Project Location: 125 km south-west of Williams Lake, British Columbia Ownership: 100% 7.7 million ounces recoverable gold Mineral Reserves: 3.6 billion pounds recoverable copper Mine Type: Open-pit, 70,000 tpd mill throughput Mine Life: +20 years 5-year production prof

  14. Slide 14: Project Economic Criteria: Prosperity Gold-Copper Project

    Project Economic Criteria Prosperity Gold-Copper Project Old Project: Revised Project: 2005 Project Economic Criteria 2011 Project Economic Criteria Cu = US $1.50 Cu = US $2.25 Au = US $ 575 Au = US $ 875 $2.40 $1,200 $1.80 $900 (Au - US$/oz) (Cu - US$/lb) $1.20 $600 $0.60 $300 $0.00 $0 2005 2006 20

  15. Slide 15: Growth: Prosperity Timeline

    Growth Prosperity Gold-Copper Project Timeline Provincial EA Certificate Granted Mine Permit Process New Engineering for Project New CEAA Review Federal EA Certificate Detailed Facility Engineering & Site Prep Construction Commissioning 2010 2011 2012 2013 2014 2015 2016

  16. Slide 16: Growth: Aley Niobium Project

    Growth Aley Niobium Project Location: Northern British Columbia Ownership: 100% Mine Type: Open Pit, 5000 tpd mill throughput Mine Life: +20 years Niobium • Similar usage as molybdenum in steel • Specifically used in manufacturing high strength, low alloy steels • Green technologies, turbines, aeros

  17. Slide 17: Aley Deposit History

    Growth Aley Niobium Project Aley Deposit History Cominco: Discovered in 1980 • Spent $2 million on a 20 hole drill program from 1983-1986, outlined significant niobium mineralization • Divested in 2006, non-core Taseko: Acquired in 2007 for $5 million • Preliminary drilling in 2007, 18 holes which c

  18. Slide 18: Copper-gold deposit comparison by gold resources

    Total Au Resources (MM ozs) - 2 4 6 8 10 12 14 16 18 20 94M Pebble - Northern Dynasty Minerals 44M Reko Diq - Antofagasta Oyu Tolgoi - Ivanhoe Mines 32M Tampakan - Xstrata Lookout Hill - Ivanhoe Mines Salobo - Vale SA Prosperity - Taseko Mines Bougainville - Rio Tinto Frieda River - Xstrata Agua Ric

  19. Slide 19: Appendix 2: Key Accomplishments

    Appendix 2: Key Accomplishments January 2010 • Received British Columbia Environmental Assessment Certificate for Prosperity March 2010 • Completed transaction to sell 25% Gibraltar Mine for ~$187 million May 2010 • Signed gold stream agreement with Franco-Nevada to sell 22% of future gold productio

  20. Slide 20: Appendix 3: Investment Summary

    Appendix 3: Investment Summary Share Structure Cash on Hand: ~C$212, as at December 31, 2011 Listed: TSX; TKO / NYSE Amex; TGB S&P/TSX Composite : S&P/TSX Small Cap Indices: S&P/TSX Global Mining : S&P/TSX Global Base Metals Shares 188.9 million Outstanding: Market $1.1 billion Capitalization: 52 We

  21. Slide 21: Appendix 4: Experienced Management Team

    Appendix 4: Experienced Management Team Russell Hallbauer, P. Eng - President & CEO and Director – Mr. Hallbauer is a professional engineer with over 35 years of mining experience. He has a strong background in open pit and underground mining, overseeing operating joint ventures and revitalizing min

  22. Slide 22: Appendix 4: Experienced Management Team

    Appendix 4: Experienced Management Team Robert Rotzinger, P. Eng - General Manager, Projects – Robert is a mechanical engineer and has worked at the Gibraltar Mine since 1994 where he has taken on increasingly senior positions. He has been tasked with the management of diverse engineering, environme

  23. Slide 23: Appendix 5: Reserves and Resources

    Appendix 5: Reserves and Resources Prosperity Mineral Reserves @ C$5.50 NSR/t Cut-Off1 Size Grade Recoverable Metal Contained Metal M Tonnes Au (g/t) Cu (%) Au (M oz) Cu (B lb) Au (M oz) Cu (B lb) P&P reserves 830 0.41 0.23 7.7 3.6 11.0 4.2 M&I Resources 181 0.40 0.30 - - 2.3 1.1 Total 1,011 0.41 0.