Btu Metals Corp · TSXV:BTU

Btu Metals — Investor Presentation (January 2018)

17 slides from Btu Metals's investor presentation, January 2018

  1. Slide 1: Corporate Presentation January 2018

    BI METALS CORP. CORPORATE PRESENTATION JANUARY 2018 LOCAL TOLL-FREE EMAIL ONLINE & 7-604-683-3995 © 1-888-945-4770 [email protected] © BTUMETALS.COM TSX.V BTU

  2. Slide 2: Executive Summary

    EXECUTIVE SUMMARY ▪ Exploration focused on Gold in safe jurisdictions ▪ BTU holds options for 100% of two highly prospective projects ▪ Galway Gold, Ireland ▪ Six contiguous claims, 160 km2+ ▪ Dalradian supergroup ▪ Multiple high grade samples ▪ Geophysical work & drill target selection underway ▪ S

  3. Slide 3: Why Ireland

    WHY IRELAND ▪ A top mining jurisdiction ▪ Ranked 9th in the world overall ▪ Ranked 1st in the world for policy perception ▪ Excellent infrastructure ▪ Good road network ▪ Power, water ▪ Skilled workforce & technical expertise ▪ Safe ▪ Home to successful mines including Europe’s #1 zinc producer Tara

  4. Slide 4: Management & Directors

    MANAGEMENT & DIRECTORS PAUL WOOD MIKE ENGLAND DON MCKINNON CEO & DIRECTOR PRESIDENT & DIRECTOR VP OF EXPLORATION Paul Wood has led and executed Mike England has been involved in the Mr. McKinnon has been involved in the numerous transactions across the globe public markets starting in 1983 working m

  5. Slide 5: Management & Directors

    MANAGEMENT & DIRECTORS RICHARD O’SHEA DIRECTOR DENNIS LOGAN DOUGLAS HUNTER, M.SC., P. GEO Richard O’Shea brings over 20 years of experience in CFO DIRECTOR the mining and exploration sector, most recently as Mr. Logan is a Chartered Professional Mr. Logan is a Chartered Professional CEO and Director

  6. Slide 6: Galway Gold: Location & Key Features

    GALWAY GOLD LOCATION & KEY FEATURES ▪ Located within the Caledonian (Lower Paleozoic) orogenic zone The 160 km2 + Galway property is ▪ Favorable lithologies for metal precipitation (chemical traps) within the Dalradian Supergroup part of the Dalradian Supergroup metasediments, e.g., graphitic schist

  7. Slide 7: Total Size of Six PLs

    49.6 7.25 26.3 3.73 160 km2 TOTAL SIZE OF SIX PLS

  8. Slide 8: Galway Gold Lee

    GALWAY GOLD PL 2295 – 11.1km 2 LEE The Lee occurrence is a high grade in situ gold occurrence with a coincident overlapping auger soil anomaly. Gold values of up to 66 g/t occur in qtz veins with associated galena, pyrite and minor chalcopyrite. ▪ Float samples as high as 195 g/t Au and 240 g/t Ag ▪

  9. Slide 9: Galway Gold Dooros

    GALWAY GOLD PL 3145 - 21.95 km 2 DOOROS The Dooros occurrence hosts a 3000' anomalous Au zone with copper gold occurrence with strike lengths of up to 120' averaging 1.1% Cu and 5.6 g/t Au. ▪ Grab sample of 26.3 g/t Au and 3.73% Cu RESULTS TRENCHING* 0.5 g/t Au to 73 g/t Au from several trenches wit

  10. Slide 10: Galway Gold: Clements Mine and Glenlusk

    GALWAY GOLD PL 3145 - 21.95 km 2 CLEMENTS MINE The Clements Mine is a past producing mine located on the Galway Gold Trend in between th Lee and Dooros occurrences. ▪ Massive sulphides: Max values of 0.5% Cu, 22.5% Pb, 5.2% Zn ▪ 2.2 g/t Au, 68 g/t Ag ▪ 35.3% Cu, 4.6 oz / ton Ag ▪ NNW vein up to 8.5

  11. Slide 11: Galway Gold Work Plan

    GALWAY GOLD WORK PLAN ▪ Detailed compilation of historic data updated into digital formats ▪ Systematic approach to locate and assess geochemical pathfinder elements ▪ Prospecting, sampling, and mapping of entire property ▪ Bulk overburden sampling and heavy mineral concentrate preparation on the Le

  12. Slide 12: Shakespeare Gold Project, Ontario, Canada

    SHAKESPEARE GOLD PROJECT ONTARIO, CANADA ▪ Past producing mine located in Shakespeare Township, Sudbury Mining Division, a favourable mining jurisdiction with ease of access ▪ Situated in rocks of the northeast-trending folded ~2.4 billion-year old Huronian Supergroup, intruded by the ~2.21 billion-

  13. Slide 13: Shakespeare Gold Project Claims Map

    SHAKESPEARE GOLD PROJECT CLAIMS MAP ▪ Nine claims comprising 528 hectares ▪ Storied past producing mine SHAKESPEARE GOLD MINE APPROX. 1910 13

  14. Slide 14: Shakespeare Gold Project Storied History

    SHAKESPEARE GOLD PROJECT STORIED HISTORY ▪ Production reported from 1905-48 of 2,959 ounces from 8,599 tons (~0.33 ounces per ton) SELECTED SIGNIFICANT HISTORIC ASSAY DATA ▪ Historic sampling in the western part of the Hole ID From (m) To (m) Interval Length (m) Au (g/t) mine area was traced for 15

  15. Slide 15: Shakespeare Gold Project Work Plan

    SHAKESPEARE GOLD PROJECT WORK PLAN ▪ Re-establishing 2012 control grid to cost- effectively lever existing geophysical work ▪ Prospecting of the 2012 Induced Polarization (IP) charge-ability anomalies that appear to extend from the historic underground working to the NE and SW ▪ Delineate drill targ

  16. Slide 16: Capitalization

    CAPITALIZATION OPTIONS Amount Price Proceeds 400,000 $0.05 $20,000 1,300,000 $0.12 $156,000 SHARE STRUCTURE AS OF NOVEMBER 1 2017 st 200,000 $0.19 $38,000 250,000 $0.22 $55,000 SHARES ISSUED 24,534,334 2,150,000 - $269,000 OPTIONS 2,150,000 WARRANTS 9,425,060 WARRANTS Amount Price Proceeds FULLY DIL

  17. Slide 17: Disclaimer

    DISCLAIMER Mr. Andris Kikauka is a Professional Geologist with over 30 years experience in the minerals mining, consulting, exploration and research industries. Mr. Kikauka acts as the Company's Qualified Person for technical disclosure per National Instrument 43-101. Mr. Kikauka has reviewed and ap

BTU Metals — Investor Presentation (January 2018) on 6ix