Silver Bull Resources, Inc. · TSX:SVB
Silver Bull Resources — Investor Presentation (March 2016)
32 slides from Silver Bull Resources's investor presentation, March 2016
Slide 1: Silver Bull Resources Corporate Presentation
SVBL: AMEX | SVBL: TSX | Web: www.silverbullresources.com
Slide 2: Forward Looking Statements
Forward Looking Statements Cautionary Note to U.S. Investors concerning estimates of Measured, Indicated, and Inferred Resources: This press release uses the terms "measured resources", "indicated resources", and "inferred resources" which are defined in, and required to be disclosed by, NI 43-101.
Slide 3: Capital Structure
Capital Structure CAPITALIZATION SHAREHOLDERS Shares Outstanding 159,072,657 Directors and Officers: 5.4% Options 11,288,808 Coeur D’Alene Mines Corporation: 10.9% Fully Diluted 170,361,465 Lazarus Investment Partners: 9.0% Sprott, RBC Precious Metals: 3.5% Share Price US$0.12 Goodman, US Global: 1.
Slide 4: Who We Are
Who We Are MANAGEMENT BOARD OF DIRECTORS TIM BARRY BRIAN EDGAR President, CEO & Director Chairman * Full management bios in Appendix SEAN FALLIS TIM BARRY Chief Financial Officer President, CEO & Director MARK PFAU DANIEL KUNZ VP Exploration Director BILL PENNSTROM JOHN McCLINTOCK Consulting Metallu
Slide 5: Sierra Mojada – 2 Deposits in 1
SIERRA MOJADA – 2 Deposits in 1 NORTHERN MEXICAN CARBONATE REPLACEMENT TYPE DEPOSIT (CRD) 5
Slide 6: Sierra Mojada: Two Deposits in One
Sierra Mojada: 2 DESPOSITS IN 1 Sierra Mojada: TWO DEPOSITS IN ONE: GLOBAL RESOURCE (ENCOMPASSES ALL MINERALIZATION SEEN AT SIERRA MOAJADA): 4.67Blbs Zn, 90.8Moz Ag, 56.3Mlbs Cu, 392.8Mlbs Pb (M&I) HIGH GRADE ZINC AND SILVER ZONES (“ZONES” WITHIN THE GLOBAL RESOURCE): Zinc Resource of 10.03Mt @
Slide 7: Regional CRD Occurrences
Regional CRD Occurrences + Pb + Cu 7
Slide 8: CRD System – Idealized Geologic Model
CRD System – Idealized Geologic Model 8
Slide 9: Infrastructure
Infrastructure • Excellent infrastructure Railway to site Paved road Grid power 5 company owned water wells • Open pittable project with favorable ground conditions • Mining district with skilled labour force 9
Slide 10: Infrastructure
LEGEND State Highway Exisiting Gas Line x Railway SIERRA MOJADA (a Registered Water Well
Slide 11: NI43-101 Global Resource
NI43-101 Global Resource Global Resource = open pit + underground Resource 11
Slide 12: High Grade Zinc and Silver Zones
High Grade Zinc and Silver Zones (zones within the NI43-101 “Global Resource) N 12
Slide 13: High Grade Zinc and Silver Zones
High Grade Zinc and Silver Zones (zones within the NI43-101 “Global Resource) 13
Slide 14: High Grade Zinc Zone – Measured & Indicated
High Grade Zinc Zone (zone within the NI43-101 “Global Resource) ZINC ZONE Zn Ag Cu Pb Cutoff Zn (%) Tonnes (Mt) Zn % Ag g/t Cu % Pb % (MLbs) (Mozs) (MLbs) (MLbs) Measured & Indicated 4 15.54 8.8 25.4 0.02 0.36 3,023.2 12.7 7.8 123.3 6 10.03 11.0 20.5 0.02 0.34 2,426.0 6.6 3.9 74.7 8 6.81 12.9 17.0
Slide 15: Underground workings within the zinc zone
Underground workings within the zinc zone (zones within the NI43-101 “Global Resource) Zinc Block model (red) model shown at a 6% cutoff 15
Slide 16: High Grade Zinc Metallurgy – Waelz Kiln
High Grade Zinc Metallurgy – Waelz Kiln * based on kilning test work on the high grade Zinc completed by Silver Bull 16
Slide 17: High Grade Zinc Metallurgy – Waelz Kiln
High Grade Zinc Metallurgy – Waelz Kiln 17
Slide 18: High Grade Silver Zone – Measured & Indicated
High Grade Silver Zone (zone within the NI43-101 “Global Resource) SILVER ZONE Ag Zn Cu Pb Cutoff Ag (g/t) Tonnes (Mt) Ag g/t Zn % Cu % Pb % (Mozs) (MLbs) (MLbs) (MLbs) Measured & Indicated 25 37.2 70.2 1.9 0.06 0.35 84.0 1519.5 50.2 289.7 35 28.9 81.8 1.7 0.07 0.38 76.0 1096.8 46.3 241.3 45 21.9 95
Slide 19: Silver Zone
ba Silver Zone Silver Ball RESOURCES, INC 58.7Mt silver @ 50g/t for 90.8Moz of silver (measured and indicated)
Slide 20: Silver Drill Results Across Resource
Silver Drill Results Across Resource 20
Slide 21: Silver and Low Grade Zinc Metallurgy
Silver and Low Grade Zinc Metallurgy Recovery of Silver = 75% SART Operation Examples: Recovery of Zinc = 41% Mining Company Project Location * based on extensive Metallurgical test work completed by Silver Bull Kinross Maricunga Chile Newmont Yanacocha Peru Crush & Grind NWM Mining Lluvia de Oro Me
Slide 22: Near Resource Upside & Exploration Upside
NEAR RESOURCE UPSIDE & EXPLORATION UPSIDE 22
Slide 23: Near Resource Extension Zones
Near Resource Extension Zones 23
Slide 24: Sulphide targets
ba Sulphide targets Silver Bull RESOURCES, INC LEGEND Lael Zz ft High Chi ability | High Grade Zinc Zone (Blue) eee nee B11144—SULPHIDE DRILLHOLE 8.45m (from 193m) @ 60g/t Ag, 5.45% Pb, 17% Zn CHARGEABILITY High Grade Silver Zone (Red) [i ? ali elie SULPHIDE SAMPLE RESULTS Sample 26708: 268g/t Ag, 1
Slide 25: Regional Exploration
Regional Exploration 2 MAIN TARGETS OUTSIDE THE MAIN ZONE OF MINERALIZATION: DORMIDOS PALMOS NEGROS DORMIDOS & PALAMOS NEGROS SHALLOW SILVER ZONE HISTORICAL MINING AREAS WITH EXTENSIVE UNDERGROUND AND SURFACE WORKINGS: NEVER EXPLORED WITH MODERN TECHNIQUES NEXT STEPS RESULTS FROM INITIAL SAMPLING IN
Slide 26: Palamos Negros
X\ Palamos Negros Silver Bull RESOURCES, INC Approximate trace of Sierra Mojada Fault (black line) oO 20-40g/t Ag oii 33g/t Ag, 11.25% Pb,| = Cs) 10-20g/t Ag . : : = - ZB 0.7% Mo SS —— : . a 149g/t Ag, 2.02% Zn, 0.6% Pb Ss ~ DLE = Ba. 2 Silver Bull RESOURCES INC . Raia.
Slide 27: Palomas Negros Sulphide target
Palomas Negros Sulphide target 27
Slide 28: Dormidos
Dormidos Approximate trace of the Sierra Mojada Fault (black line) 1 ae 7% Zn, = ; . 111g/t Ag, 5.91% Zn, 10.3% Pb =) 8ig/t Ag, 11.25% Zn, im 2 4.6% Pb = a wo 29g/t Ag, 27.9% Zn, rene 1.21% Pb 63g/t Ag, 7.4% Zn, [% me 9.4% Pb —_ “. ; ; } y. Led aoe
Slide 29: Appendix
APPENDIX SVBL: AMEX | SVBL: TSX | Web: www.silverbullresources.com
Slide 30: Management Resumes
Management Resumes Tim Barry, CEO, President and Director - Mr. Barry is the President and CEO of Silver Bull Resources, Inc. Between September 2010 to March 2011, Mr. Barry served as Vice President of Exploration for Metalline Mining (now renamed to Silver Bull Resources), before stepping into the
Slide 31: Board of Directors - Resumes
Board of Directors - Resumes Brian Edgar, Chairman of the Board - Mr. Edgar was appointed Chairman of the Board of Directors in April 2010. Mr. Edgar has broad experience working in junior and mid-size level natural resource companies. He previously served as Dome's President and Chief Executive Off
Slide 32: SVBL: AMEX | SVBL: TSX | www.silverbullresources.com
SVBL: AMEX | SVBL: TSX | Web: www.silverbullresources.com
Silver Bull Resources — Investor Presentation (March 2016) on 6ix