Particle Drilling Technologies Inc

Particle Drilling Technologies — Investor Presentation (November 2006)

21 slides from Particle Drilling Technologies's investor presentation, Nov 20, 2006

  1. Slide 1: Investor Presentation: Breaking 'Hard Rock' Records

    November 2006 Particle Drilling Technologies, Inc. (NASDAQ: PDRT) www.particledrilling.com Investor Presentation Breaking 'Hard Rock' Records

  2. Slide 2: Special Note Regarding Forward-Looking Statements

    SPECIAL NOTE REGARDING FORWARD-LOOKING STATEMENTS This Presentation contains forward-looking statements. These statements are subject to a number of risks and uncertainties, many of which are beyond our control. All statements other than statements of historical facts included in this Presentation,

  3. Slide 3: PID System Animation

    PID System Animation ou = BO | Powe Sa- as ride - YP > 2 Jane De © Ow Pam Gane baw News ‘out ENHANCED EFFICIENCY TO MAKE YOUR ‘eee 0 Tecony RESERVES ECONOMICALLY RETRIEVABLE Pee, Corporate Gvemance yin se rae You = Benefit From auntie Parile Impact Diiling? ge 0z006 an Particle = Breaking ‘Hard Rock

  4. Slide 4: We Are

    An oilfield service company with patented, step-change technology First commercial trial completed in May Second commercial trial will be started in mid - November Plug and play service provided directly to oil and gas company Providing a service that enables oil and gas companies to reduce their co

  5. Slide 5: What's Driving Domestic Drilling Activity

    What’s Driving Domestic Drilling Activity ~ 1,750 Rigs Drilling Source: Baker Hughes Rig Count USA Drilling - Oil vs. Gas 82% 18% Gas Oil USA Drilling - Straight vs. Deviated 40% 60% Straight Deviated USA Drilling -Onshore vs. Offshore 6% 94% Offshore Land 5

  6. Slide 6: Hard Rock Drilling Economics

    Hard Rock Drilling Economics 101 The harder the rock, the slower it drills The slower it drills the more the well costs Hard Rock Soft Rock $ $ $ $ $ $ ~ 20% of the footage drilled can equal ~ 70% of the total drilling cost 70% 30% Hard Rock Interval Cost Rest of The Well 6

  7. Slide 7: Drilling Cost Reductions Are a Mandate

    Drilling Cost Reductions Are a Mandate We believe 100% of the Oil and Gas companies drilling through these hard rock intervals want to reduce the cost of their wells We estimate that approximately half of the onshore vertical gas wells encounter hard rock intervals that significantly increase well d

  8. Slide 8: Initial Target Markets: Vertical Wells in Hard Rock

    $ .252 B Permian – 22,270 Current Drilling Days $ .272 B Mid-continent – 24,015 Current Drilling Days Rockies – 46,121 Current Drilling Days $ .523 B Source: IHS Drilling Data In addressing only vertical wells drilled in hard rock in the three major markets in the USA, Particle Drilling technology c

  9. Slide 9: Customer Savings Generate Large Returns for PDRT

    17 days 6 days Approximate time required to drill interval $ 374,000 Cost saved on drilling interval $ 578,000 $ 204,000 Total cost of drilling interval 6 ft/hr 18 ft/hr Expected ROP $ 34,000/d $ 34,000/d Customer’s daily variable cost CONVENTIONAL PID SYSTEM Example 2,500’ Onshore Drilling Interval

  10. Slide 10: Our Solution: The Particle Impact Drilling PID System

    Patented technology, step-change in performance Field tests proved the PID System drills hard rock at 3 to better than 6 times faster than conventional methods Our Solution: The Particle Impact Drilling “PID” System 10

  11. Slide 11: Hardened Steel Particles Do the Real Work

    11 Hardened Steel Particles Do the Real Work Conventional drill bits require high forces to crush and grind the hard rock away The PID System removes hard rock by blasting it away with small hardened steel particles entrained in the drilling fluid These steel particles accelerate through the PID bit

  12. Slide 12: PID Drill Bit – Demonstration of Cutting Process

    PID Drill Bit – Demonstration of Cutting Process 12 Mechanical Action Hydraulic Blasting Action Particle & Fluid Exit Nozzles

  13. Slide 13: PID Footprint – Rig Illustration

    PID Footprint – Rig Illustration 13 Frac Pump Particle and Cuttings Process & Storage Unit Cuttings Return Particle & Cuttings Return

  14. Slide 14: Overview of Field Trials

    Overview of Field Trials Successful PID system deployment & rig Integration on commercial trial #1 Successful performance in terms of penetration rates on trial #1 Suspended trial #2 after only a few hours because of a frac pump failure; however improvements made to simplify system and operations we

  15. Slide 15: Anticipated Return on Assets

    Anticipated Return on Assets 1 5 Anticipated cost of PID unit #2 - $1.6 million Anticipated cost of PID unit #3 and beyond - $600k Anticipated annual EBITDA per PID unit assuming 2 jobs per month - $2.4 million Expected payback period for PID unit #2 – 8 months Expected payback period for future PID

  16. Slide 16: The Way Forward

    PID unit #1 on second commercial field trial in Utah – November 2006 PID unit # 2 should be ready in January 2007 Working to secure operating contracts with new customers Continue to make improvement to hardware and operating processes 16 The Way Forward

  17. Slide 17: Outstanding Shares & Market Capitalization

    Outstanding Shares & Market Capitalization Common Stock 30,087,200 Outstanding Stock Options & Warrants 7,189,391 Total Fully Diluted Shares Outstanding 37,276,591 Approximate Market Capitalization At November 15, 2006 $75,000,000 17 Financial Overview

  18. Slide 18: Balance Sheet – June 30, 2006

    $7,538,229 5,898,287 18,790 $1,621,152 $7,538,229 1,242,178 1,127,031 $5,169,020 Actual Pro Forma For Equity Offering $18,238,229 Total Liabilities & Stockholders’ Equity 16,598,287 Stockholders’ Equity 18,790 Long Term Debt $1,621,152 Current Liabilities $18,238,229 Total Assets 1,242,178 Intangibl

  19. Slide 19: Management Team

    Jim B. Terry, President & Chief Executive Officer - Vice President, Drilling Services for Weatherford International from 2003 until 2005; Over 9 years at Halliburton Company, the last three of those years as Director—Advanced Well Construction Systems; Over 2 years at Smith International; Over 14 ye

  20. Slide 20: Board of Directors

    Ken R. LeSuer, Chairman of the Board - Recently retired from the Vice Chairman role at Halliburton Company where he reported to Dick Cheney; Prior to becoming Vice Chairman at Halliburton, Mr. LeSuer served as both the President and CEO of Halliburton Energy Services and as President and Chairman of

  21. Slide 21: Summary

    Operators searching for improved drilling performance to reduce well cost The vast majority of reserves in North America are not produced because the cost of drilling renders them uneconomic PDRT can save operators significant expense in hard rock formations 21 Summary

Particle Drilling Technologies — Investor Presentation (November 2006) on 6ix