Slide 1: Shaakichiuwaanaan - North America's Next Lithium Powerhouse
For personal use only Shaakichiuwaanaan - North America’s Next Lithium Powerhouse Investor Day Presentation September 2024
Slide 2: Important Information - Cautionary Statements
IMPORTANT INFORMATION This presentation has been prepared by Patriot Battery Metals Inc (Company) and is authorised combination of potential strategic partnering, strategic debt, equity financing, potential operating the Company's ability to meet or achieve estimates, projections and forecasts; the
Slide 3: Important Information - Qualified Persons and Non-IFRS Measures
IMPORTANT INFORMATION QUALIFIED/COMPENTENT PERSONS NON-IFRS AND OTHER FINANCIAL MEASURES interpretation of a consolidated dataset of surface rock sample descriptions and assays, outcrop mapping and descriptions, drill hole logs and core sample assays, geophysical surveys, and remote sensing data. Th
Slide 4: Geology / Resources
For personal use only 1 Geology / Resources 4 TSX: PMET ASX: PMT OTCQX: PMETF WB: R9GA PMET
Slide 5: Largest Lithium Pegmatite Resource in the Americas
SHAAKICHIUWAANAAN – GEOLOGY / RESOURCES Largest Lithium Pegmatite Resource in the Americas For personal use only Lithium Pegmatite Mineral Resource by Grade and Tonnes 1.80% Production Development PMET 1.60% Shaakichiuwaanaan PAK + Spark Grota do Cirilo 1.40% Separation Rapids Bandeira Whabouchi Gal
Slide 6: Mineral Resource
SHAAKICHIUWAANAAN – GEOLOGY / RESOURCES Mineral Resource • The PEA is underpinned by the CV5 Spodumene Pegmatite Oblique view of the CV5 Spodumene Pegmatite Block Model For personal use only component of Shaakichiuwaanaan updated Mineral (classified material unconstrained) (not to scale) Resource Es
Slide 7: Summer-Fall 2024 Exploration
SHAAKICHIUWAANAAN – GEOLOGY / RESOURCES Summer-Fall 2024 Exploration • Drilling began in June and is planned to continue through mid Oct – total of ~55,000 m anticipated For personal use only • Continued infill at CV5 to support conversion of Inferred to Indicated classification to underpin Feasibil
Slide 8: High-Grade Discovery at CV13 – Vega Zone
SHAAKICHIUWAANAAN – GEOLOGY / RESOURCES High-Grade Discovery at CV13 – Vega Zone1 For personal use only • New high-grade spodumene pegmatite zone discovered at CV13: • 34.4 m at 2.90% Li2O, including 21.9 m at 3.58% Li2O (CV24-470), discovery hole. • 51.7 m at 1.77% Li2O, including 9.7 m at 5.16% Li
Slide 9: Exploration Target
SHAAKICHIUWAANAAN – GEOLOGY / RESOURCES Exploration Target 1 • Significant Exploration Target outlines the potential for additional tonnage at the Shaakichiuwaanaan Property For personal use only o 146 to 231 Mt at 1.0 to 1.5% Li2O. The potential quantity and grade of the Exploration Target are conc
Slide 10: Planned 2025 Exploration
SHAAKICHIUWAANAAN – GEOLOGY / RESOURCES CV12 Spodumene Pegmatite Planned 2025 Exploration • Up to approximately 80,000 m of drilling anticipated to 31 Dec 2025 For personal use only • Continued delineation of CV5 & CV13 along strike and to depth, & initial testing of proximal corridors • Initial dri
Slide 11: PEA Highlights
For personal use only 2 PEA Highlights 11 TSX: PMET ASX: PMT OTCQX: PMETF WB: R9GA PMET
Slide 12: Patriot's Phased Development Strategy
SHAAKICHIUWAANAAN – PEA HIGHLIGHTS Patriot’s Phased Development Strategy For personal use only Downstream (Opportunity) Stage 2 (Expansion Phase) Future downstream opportunity (Not included in the PEA) Provides increased access to North American Stage 1 and European lithium supply chains ~800ktpa
Slide 13: PEA Overview
SHAAKICHIUWAANAAN – PEA HIGHLIGHTS PEA Overview PEA highlights the Shaakichiuwaanaan1 Project as a potential North American lithium raw materials supply base For personal use only Preliminary Hybrid Mine Plan PEA Shows the Phased Funding Strategy Upside Economics Stage 1 open-pit Potential to Develo
Slide 14: PEA Highlights
SHAAKICHIUWAANAAN – PEA HIGHLIGHTS PEA Highlights For personal use only After-Tax NPV8% Real After-Tax IRR Stage 1 Net Capex Payback Period C$2.9 Billion 34% C$640 Million 2 3.6 Years (US$2.2 Billion) (US$487 Million) Estimated break-even spodumene 1 US$1,375/t (SC5.5 FOB Bécancour) price (SC6) of U
Slide 15: Mining, Processing and Infrastructure
For personal use only 3 Mining, Processing and Infrastructure 15 TSX: PMET ASX: PMT OTCQX: PMETF WB: R9GA PMET
Slide 16: Mine Plan
SHAAKICHIUWAANAAN – MINING, PROCESSING AND INFRASTRUCTURE Mine Plan Mt For personal use only • Hybrid mine plan which aims to use both open pit 8.0 and underground (UG) mining methods OP Ore Mined OP and UG anticipated to account for 56% and 44% 7.0 of ore mined, respectively • UG benefits relative
Slide 17: CV5 PEA Pit Design
CV5 PEA Pit Design SHAAKICHIUWAANAAN Open-Pit Mining For personal use only • Pit shell optimization resulted in a range of shells for a range of prices, including the base price of US$1,375 per tonne SC5.5 (RF 1). The selected pit shell, for the purpose of guiding the pit design, was generated at an
Slide 18: UG - High-grade Mining Potential
SHAAKICHIUWAANAAN – MINING, PROCESSING AND INFRASTRUCTURE UG - High-grade Mining Potential CV5 Side View Highlighting the High-Grade Nova Zone For personal use only • Selectively targeting high-grade mining areas has the potential to reduce costs during periods of lower lithium pricing, improving op
Slide 19: UG - High-grade Mining Potential
SHAAKICHIUWAANAAN – MINING, PROCESSING AND INFRASTRUCTURE UG - High-grade Mining Potential For personal use only • The hybrid approach potentially provides significant Example of Nova Zone Stope Tonnes and Li2O% Grade flexibility, allowing access to higher-grade zones as needed, which is essential f
Slide 20: Processing and Recovery
SHAAKICHIUWAANAAN – MINING, PROCESSING AND INFRASTRUCTURE Processing and Recovery For personal use only • Simple DMS-only processing plant • Phased approach could see the installation of a 2.5Mtpa1 processing plant in Stage 1 and another 2.5Mpta processing plant to run in parallel in Stage 2 • The c
Slide 21: Simple Mineralogy & Metallurgy
SHAAKICHIUWAANAAN – MINING, PROCESSING AND INFRASTRUCTURE Simple Minerology & Metallurgy Metallurgical Test Work Recovery (global) Results & Industry For personal use only Based Recovery Estimates for 3 x Size Range DMS Process Plant Both CV5 and CV13 — Potentially Processable at the same Plant • Co
Slide 22: Infrastructure
SHAAKICHIUWAANAAN – MINING, PROCESSING AND INFRASTRUCTURE Infrastructure For personal use only • Power – Low-carbon footprint, low-cost and mainly renewable electricity sourced from Hydro-Québec – The electrical substation will be located at approximately 55 km south of the Hydro-Québec’s 315 KV Til
Slide 23: Infrastructure Upside, La Grande Alliance
SHAAKICHIUWAANAAN – MINING, PROCESSING AND INFRASTRUCTURE Infrastructure Upside, La Grande Alliance For personal use only • Road between Renard Mine and the Trans-Taiga1 – During Years 6-15 of LGA plan, a proposed road extension between the Renard Mine and the Trans-Taiga Road is envisioned – This k
Slide 24: Shaakichiuwaanaan Camp
SHAAKICHIUWAANAAN – MINING, PROCESSING AND INFRASTRUCTURE Shaakichiuwaanaan Camp For personal use only The camp is located at KM270 on the Trans-Taiga Road The camp is a critical infrastructure considering upcoming closure of Mirage Outfitters in Q4 2024 and includes the following facilities: • 80 r
Slide 25: All Weather Road
SHAAKICHIUWAANAAN – MINING, PROCESSING AND INFRASTRUCTURE All Weather Road For personal use only • The All-Season Access Road extends south from KM270 on the Trans-Taiga Road a distance of ~20 km south to the CV5 deposit • The road is a critical investment and will enable significant cost savings on
Slide 26: Permitting and Community/First Nations Engagement
For personal use only 3 Permitting and Community/First Nations Engagement 26 TSX: PMET ASX: PMT OTCQX: PMETF WB: R9GA PMET
Slide 27: Cree Engagement
Cree Engagement • Recent site celebrations / ceremony For personal use only and feast • Approximately 40 community members, including the Tallyman and his family • The entire site team • Camp Shaakichiuwaanaan • The name means climbing a hill or a mountain (hills/mountains) • As chosen by the Tallym
Slide 28: Shaakichiuwaanaan: Impact Assessment Process
SHAAKICHIUWAANAAN – PERMITTING AND COMMUNITY/FIRST NATIONS ENGAGEMENT Shaakichiuwaanaan: Impact Assessment Process For personal use only Provincial Assessment & Review Procedure • All mining projects located south of the 55th parallel, in the territory is governed by the James Bay and Northern Quebe
Slide 29: Environmental Baseline Work
SHAAKICHIUWAANAAN – PERMITTING AND COMMUNITY/FIRST NATIONS ENGAGEMENT Environmental Baseline Work For personal use only Gantt chart of Environmental baseline work completed to date and planned to support the submission of the ESIA 29 TSX: PMET ASX: PMT OTCQX: PMETF WB: R9GA PMET
Slide 30: Mining Approval Process
SHAAKICHIUWAANAAN – PERMITTING AND COMMUNITY/FIRST NATIONS ENGAGEMENT Mining Approval Process For personal use only Project Description Environmental Impact Assessment Report • Baseline Data collection (2 years) Impact Benefit Agreement • Project guidelines • Alternatives Assessment (Commitments to
Slide 31: Market Commentary
For personal use only 2 Market Commentary 31 TSX: PMET ASX: PMT OTCQX: PMETF WB: R9GA PMET
Slide 32: Supply Ramping up at a cost…
SHAAKICHIUWAANAAN – MARKET COMMENTARY Supply Ramping up at a cost… For personal use only • Supply-side response from the Chinese producers has Zimbabwe – Hard Rock Cost of Production been successful in the last couple of years, however it has come at a significant cost 1,400 • Just one example, look
Slide 33: Demand at a Tipping Point
SHAAKICHIUWAANAAN – MARKET COMMENTARY Demand at a Tipping Point For personal use only • Chinese dominance of New Energy industries is becoming increasingly Battery margins are being squeezed clear, with its leading position in the lithium-ion supply chain growing China sell spot prices and manufactu
Slide 34: North American Downstream Landscape
SHAAKICHIUWAANAAN – MARKET COMMENTARY North American Downstream Landscape For personal use only Gigafactory Cathode Active Material/precursor Cathode Active Material (CAM/pCAM) plants 34 TSX: PMET ASX: PMT OTCQX: PMETF WB: R9GA PMET
Slide 35: Exploration, Resource Growth and Project Delivery
Exploration, Resource Growth and Project Delivery For personal use only Continue to Drill Exploration/ Community Develop CV5 Development Extend CV5 westward • Surface work on the • Build and enhance Upgraded CV5 mineral to CV13 remaining prospective trend relationships with Chisasibi resource estima
Slide 36: Appendices - Corporate Snapshot
For personal use only Appendices Corporate Snapshot
Slide 37: Proven Management Team with a Track Record of Value Creation
PROVEN MANAGEMENT TEAM WITH A TRACK RECORD OF VALUE CREATION Investor Relations For personal use only Ken Brindsen Natacha Alex Eastwood Darren L. Alix Drapack Greg Barfoot Bradley Seward Olivier B.Eng. (Mining), Garoute BEc, LLB Smith P.Eng., MBA, ICD.D M.Eng., MBA Vice President, Caza-Lapointe MAU
Slide 38: Corporate Snapshot - Trading Update and Shareholder Register
CORPORATE SNAPSHOT Trading Update Shareholder Register For personal use only $20.00 9.0 3% 8.0 4% 3% 0% 5% 7.0 $15.00 19% 15% 36% 6.0 Volume (mm) 5.0 51% C$/sh $10.00 20% 4.0 23% 3.0 21% $5.00 Other 2.0 Australia Canada HNW/family office 1.0 Institutional United States UK $0.00 - Retail Corporate Eu
Slide 39: Corporate Snapshot - Capital Structure and Analyst Coverage
CORPORATE SNAPSHOT Trading Update Analyst Coverage For personal use only Pro-Forma Equity Raise CAD (m) Basic Shares Outstanding 141.1 Dilutive Securities 11.1 Fully Diluted Shares 152.2 Market Cap (as of Aug 30) : $598 Cash (as of June 30th) $102 Potential Cash from FDITM Options & other $6.1
Slide 40: Appendix - Mineral Resource & Peer Comparison
For personal use only Appendix Mineral Resource & Peer Comparison
Slide 41: CV5 and CV13 Mineral Resource Statement
CV5 AND CV13 Mineral Resource Statement For personal use only Li2O Ta2O5 Contained Li2O Contained LCE Pegmatite Classification Tonnes (%) (ppm) (Mt) (Mt) Indicated 80,130,000 1.44 163 1.15 2.85 CV5 & CV13 Inferred 62,470,000 1.31 147 0.82 2.03 • Mineral Resources were prepared in accordance with Nat
Slide 42: CV5 and CV13 Mineral Resource Sensitivity Analysis
CV5 AND CV13 MINERAL RESOURCE * Sensitivity Analysis CV5 Spodumene Pegmatite CV13 Spodumene Pegmatite For personal use only Indicated Inferred Indicated Inferred Cut-off grade Average grade Average grade Average grade Average grade Tonnes ≥ cut- (%) Tonnes ≥ cut-off (Li2O) ≥ cut-off Tonnes ≥ cut-off
Slide 43: Peer Comparison Information – Resources
N O T E S P E E R COMPARISON INFORMATION – RESOURCES (SLIDE 5) Reserves (Mt LCE) Resources (Mt LCE) — Inclusive of Reserves Company Project Stage Information Source(s) Proven Probable Total Reserves Measured Indicated Inferred Total Resources AVZ Minerals Manono (75%) Feasibility 2.0 2.0 4.0 4.0 11.
Slide 44: Peer Comparison Information – Production Capacity
N O T E S P E E R COMPARISON INFORMATION – PRODUCTION CAPACITY (SLIDE 13) Name Ticker Project Name Stage Degree of Study Price Assumption (US$/t SC6) Mine Life Information Source - Current Production Capacity Information Source - Planned Expanded Capacity Pilbara Minerals PLS Pilgangoora Production
Slide 45: Thank you
For personal use only Thank you PATRIOT BATTERY METALS +1 (604) 279 8709 [email protected] patriotbatterymetals.com 45 TSX: PMET ASX: PMT OTCQX: PMETF WB: R9GA PMET