Highfield Resources Limited · ASX:HFR

Highfield Resources — Investor Presentation (April 2023)

26 slides from Highfield Resources's investor presentation, April 2023

  1. Slide 1: Fully Permitted Potash Mine in Europe: Ready for Construction

    Fully Permitted Potash Mine in Europe: Ready for Construction Corporate Presentation April 2023 ASX: HFR

  2. Slide 2: Competent Persons Statement for Muga Ore Reserves and Mineral Resources

    COMPETENT PERSONS STATEMENT FOR MUGA ORE RESERVES, MUGA MINERAL RESOURCES and EXPLORATION TARGET This update was prepared by Mr. Ignacio Salazar Director of Highfield Resources. The information in this update that relates to Ore Reserves is based on information prepared under the direction of Dr Mik

  3. Slide 3: Global Potash Prices on the Move at the Right Time

    Global Potash Prices on the Move at the Right Time Strong market fundamentals Upward price forecasts 2.5 10.0 800 Billions of tonnes 2.0 8.0 700 Soybean prices are the 1.5 6.0 highest in 5 years Billions of tonnes 600 USD/t 1.0 4.0 500 0.5 2.0 400 0.0 0.0 300 1980 1983 1986 1989 1992 1995 1998 2001

  4. Slide 4: Muga is strategically important for Europe

    Muga is strategically important for Europe European markets accessible to Muga mine European Imports • 47% of European imports are from Russia and Belarus (4 year 6Mt average) 4Mt Muga Mine MOP trade • Russia and Belarus accounted for 38% of worldwide production 26% routes in 2021, or about 27 Mt of

  5. Slide 5: An Investment Opportunity in the Next Major European Potash Mine

    An Investment Opportunity in the Next Major European Potash Mine Muga Potash Mine Highfield Resources Strong market fundamentals Strong financial position and Global potash prices on the move financial markets support Location is a major strategic advantage Experienced Management Shallow mineralizat

  6. Slide 6: Corporate Snapshot

    Corporate Snapshot 1.40 60 Capital Structure Share Price (31 March 2023) $0.630 1.20 50 Shares on Issue 387 million 1.00 Volume (100,000 shares) 40 Share price (A$) Options & Performance Rights - 0.80 30 Market Capitalisation $243.8 million 0.60 Cash (31 March 2023) $9.0 million 20 0.40 Drawn Debt -

  7. Slide 7: Strong Board with Global Mining Industry Experience and Robust Governance Processes

    Strong Board with Global Mining Industry Experience and Robust Governance Processes Paul Harris Ignacio Salazar Independent Non-Executive Director MD & Chief Executive Officer Chairman Paul has over 25 years’ experience in financial markets Ignacio has over 30 years’ experience, most of which and in

  8. Slide 8: Management with strong mining experience and local background

    Management with strong mining experience and local background Jorge Feito Javier Aguado Head of Mining, Construction and Chief Financial Officer Operation Javier has over 20 years’ accounting and Jorge is a Mining Engineer with 20 years financial experience. He has worked for of experience in mining

  9. Slide 9: Muga Project Overview

    Highfield 7 Resources MUGA PROJECT OVERVIEW

  10. Slide 10: Highfield Resources and the Muga Project

    Highfield Resources and the Muga Project Conventional Underground A potash developer listed on Muga is a two-phase project Room and Pillar mining. Conventional Flotation and the ASX (HFR) with projects which will produce a total of Declines accessing shallow Crystallisation processing in Northern Sp

  11. Slide 11: Logistical advantage, Shallow Mineralization, Conventional Mining, with Tier-One Infrastructure in Place

    Logistical advantage, Shallow Mineralization, Conventional Mining, with Tier-One Infrastructure in Place Higher netback with local market within trucking distance National Electricity Grid Substation in Sangüesa National Electricity Grid Substation is in close proximity to mine site​ First class inf

  12. Slide 12: Significant Logistical Competitive Advantage

    Significant Logistical Competitive Advantage Extremely competitive and versatile export options ~1,750km from mines to port ~1,700km from mines to port Muga will be one of only two potash mines located in Southern Europe ~130- 220km from ~6,800 nautical miles mine to ports ~8,700 nautical miles ~5,0

  13. Slide 13: MOU signed for more than phase 1 production

    MOU signed for more than phase 1 production MOP sales (pa) Wider Europe: Salt sales (pa) • ~250-300 kt MOP • ~200-250 kt salt US East Coast: • ~50 kt MOP Local: Potash MOUs signed • ~200-250 kt salt • ~450-500 kt MOP • ~400-500 kt salt MOP Ameropa 250,000 tpa Africa: Keytrade 300,000 tpa • ~50 kt MO

  14. Slide 14: Project Economics

    Highfield 7 Resources PROJECT ECONOMICS

  15. Slide 15: Top Quartile Margins in the Industry

    Top Quartile Margins in the Industry European prices continue to trade at a premium to Margin curve forecast for 2026 (real US$) other markets​ 200.0 1,150.0 1,050.0 150.0 950.0 850.0 750.0 100.0 USD/t 650.0 USD/ t 550.0 50.0 450.0 350.0 0.0 250.0 0 10 20 30 40 50 60 70 150.0 -50.0 2016 2017 2018 20

  16. Slide 16: Low Capex Intensity and Strong Project Economics

    Low Capex Intensity and Strong Project Economics Phase 1 capex of €436 million + Phase 2 capex of €226 million MUGA: HALF THE CAPEX INTENSITY OF OTHER GLOBAL DEVELOPMENT PROJECTS (US$ per tonne of potash) 1,800 1,600 1,400 Capex intensity $/t 1,200 1,000 800 600 400 200 - BHP (Jansen) Phase 2 Canadi

  17. Slide 17: Updated Feasibility Study Reconfirms Muga's Strong Economics

    Updated Feasibility Study Reconfirms Muga’s Strong Economics Updated capex numbers with NPV8 of €1.82 Billion More advanced engineering higher degree of accuracy: 21% IRR reconfirming a 30-year mine life1 phase 1 €436 million phase 2 of €226 million Credit for €300 million Senior At current spot pri

  18. Slide 18: Muga Mine – Key Physicals and Financials

    Muga Mine – Key Physicals and Financials November 2022 CAPEX phase 1 (500,000 tpa MOP) €436 million CAPEX phase 2 (Additional 500,000 tpa MOP) €226 million Total CAPEX €662 million ROM tonnes 173.7 million tonnes Average plant tonnage feed rate 800 tph K2O grade 10.5% KCl recovery 91% LOM MOP produc

  19. Slide 19: Status and Next Steps

    Highfield 7 Resources STATUS AND NEXT STEPS

  20. Slide 20: Muga Moving to Construction

    Muga Moving to Construction 2022 2023 2024 2025 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Key permits obtained: • Environmental approval (DIA) • Mining Concession • Electricity line Authorisation • Mine gate and decline construction licence • Process plant construction licence Equity Strategic

  21. Slide 21: Construction started at the Muga Mine

    Construction started at the Muga Mine • June 2022: Townhall of Undués de Mine gates Lerda in Aragón issued the licence for Declines the construction of the mine gate and ramps Electricity substation • July-Dec 2022: Initial construction Fresh water ponds work at Muga started around the minegate Boxc

  22. Slide 22: Construction milestones achieved to date

    Construction milestones achieved to date • Preliminary works around the mine gate finalised in 2022 • All major supply contracts for the processing plant equipment signed • Compactors and granulators manufactured and received • The remaining equipment to be manufactured during construction Highfield

  23. Slide 23: Main construction: work breakdown structure

    Main construction: work breakdown structure 3 Construction workstreams: • Process Plant. Includes RoM storage, flotation plant, crystallization, drying and compacting plant, product storage and truck loading. • Urbanization. Access road to the plant, internal roads, general urbanization, water, gas

  24. Slide 24: Sustainability

    Highfield 7 Resources SUSTAINABILITY

  25. Slide 25: Industry Leading ESG Credentials

    Industry Leading ESG Credentials Environmental Factors • Progressively rehabilitate mine: Backfilling and salt sales • Muga will be the only mine not to leave residue on the surface after production Social Factors • Social Baseline Study prepared by Government of Navarra Governance Factors • First j

  26. Slide 26: ASX:HFR

    ASX:HFR REGISTERED OFFICE 169 Fullarton Road Dulwich SA 5065 Australia SPAIN HEAD OFFICE Avenida Carlos III, 13-15, 1B, 31002 Pamplona, Spain T: +34 948 050 577 | F: +34 948 050 578 FURTHER INFORMATION Ignacio Salazar CEO T: +34 948 050 577 Olivier Vadillo Investor Relations T: +34 609 811 257