Brigham Exploration — Investor Day (April 2008)
101 slides from Brigham Exploration's investor day presentation, Apr 18, 2008
Slide 1: Brigham Exploration Company Analyst Day
1 Brigham Exploration Company Analyst Day Stephen F. Austin Hotel Austin, Texas April 18, 2008
Slide 2: Forward Looking Statements / Note Regarding Reserves
Forward Looking Statements / Note Regarding Reserves Except for the historical information contained herein, the matters discussed in this presentation are forward looking statements that are based upon current expectations. This presentation / communication may include estimates, projections and ot
Slide 3: Agenda
Agenda Introduction Bud Brigham - Chairman & CEO Williston Basin Overview Bud Brigham Williston Basin Geologic Overview Jeff Larson - EVP Exploration Williston Basin Operational Review Lance Langford - EVP Operations Bakken Economics Review Bud Brigham Vicksburg Erik Hoover - Operations Manager Sout
Slide 4: Key Takeaways
Key Takeaways As Was the Case Historically, Our Recent Long-Term Land and Seismic Investments Position Us for a Multi-Year Period of Higher Rate Reserve Growth & Lower Finding Costs Potentially Highly Impactful 240,000 Net Acre Position in Williston Basin Targeting Multiple Objectives in ND and MT B
Slide 5: Brigham Core Operating Areas
Brigham Core Operating Areas TEXAS GULF COAST Acreage: 30,121 Reserves: 83 Bcfe Production: 19.6 MMcfe/d Brigham Major Field Discoveries ROCKIES Acreage: 306,000 Reserves: 11 Bcfe Production: 0.8 MMcfe/d ANADARKO BASIN Acreage: 33,647 Reserves: 35 Bcfe Production: 8.2 MMcfe/d S. LOUISIANA Acreage: 1
Slide 6: Corporate Strategy
Corporate Strategy Concept Emerging Play Exploration Development
Slide 7: Land & G&G Capex vs. Finding Costs
Land & G&G Capex vs. Finding Costs Historically, our longer term investments in acreage and seismic preceded a multi-year period of low finding costs and reserve growth (upper chart) Increased levels of land and G&G spending in 2005 though 2008 to capture resource play opportunities (lower chart) 20
Slide 8: 2008 Opportunity Set
2008 Opportunity Set Significant activity in Mountrail County and extensional areas 88,000 net acres in Mountrail County and extensional areas Currently, one rig drilling with opportunity to add additional rig in 2H 2008 Testing advance completion technologies on 51,000 net acres west of Nesson Anti
Slide 9: Williston Basin Overview
Williston Basin Overview
Slide 10: The Bakken Formation is the Largest Oil Accumulation Assessed by USGS in the Lower 48
The Bakken Formation is the Largest Oil Accumulation Accessed by USGS in the Lower 48
Slide 11: Williston Basin USGS Assessment
Williston Basin USGS Assessment BEXP's 240,000 Net Acres Attractively Located
Slide 12: Mountrail County and Extensional Areas
Mountrail County and Extensional Areas High Potential Acreage Position 88,000 net acres In Mountrail and Extensional Areas potentially provides 137 net drilling locations Other operator currently testing 320 acre spacing Market Capitalization as of April 16, 2008 Peer group comprised of Continental,
Slide 13: Williston Basin Overview: Bakken Relative to the Barnett
Williston Basin Overview A Quick Look at the Bakken Relative to the Barnett
Slide 14: Bakken vs. Barnett
Bakken vs. Barnett Barnett Play Unproven & in R&D in 1990, Similar to the Bakken in 1998 1990 2004 2006 Present 1998 Barnett Shale Early Wise County drilling generated inconsistent & generally marginal results Bakken Shale Pioneering early horizontal drilling in late 80's to mid 90's by Burlington g
Slide 15: Bakken vs. Barnett
Bakken vs. Barnett Barnett Play Unproven & in R&D in 1990, Similar to the Bakken in 1998 1990 2004 2006 Present 1998 Barnett Shale Technical improvements resulted in accelerated development of Wise County area in early 2000's Bakken Shale Technical advancements and Middle Bakken horizontal drilling
Slide 16: Bakken vs. Barnett
2004 Bakken vs. Barnett Barnett Play Unproven & in R&D in 1990, Similar to the Bakken in 1998 1990 2004 2006 Present 1998 Barnett Shale Operators continue to refine operations. Bakken Shale Techniques continually evolving. 2000 2006 Present Drilling begins to accelerate in Johnson County & adjacent
Slide 17: Bakken vs. Barnett
Bakken vs. Barnett Barnett Play Unproven & in R&D in 1990, Similar to the Bakken in 1998 2004 2006 Present Barnett Shale Operators continue to refine operations. Drilling accelerates in Johnson County & adjacent areas. Bakken Shale Techniques continually evolving. Drilling in Mountrail & Dunn County
Slide 18: Bakken vs. Barnett
Bakken vs. Barnett Approximate aerial extent of Bakken oil play is roughly double that of Barnett gas play Assuming 100% of Barnett drilled on 160 acre spacing indicates 31,831 total wells drilled, or 23,893 additional wells. Assuming 100% of Bakken drilled on 640 acre spacing indicates 17,906 total
Slide 19: Williston Basin Overview: BEXP's Bakken Opportunity
Williston Basin Overview BEXP's Bakken Opportunity
Slide 20: Williston Basin Historical Overview
Williston Basin Historical Overview Multiple Objective Potential - 240,000 Net Acres Bakken Elm Coulee Field (Richland County, MT) discovered 2001 3 years later declared economic BEXP drilled 3 Bakken wells in Williams / McKenzie Counties, ND in 2006 51,500 Net Acres in counties Field / Erickson wel
Slide 21: Williston Basin Overview - Expansive Bakken Reservoir
Williston Basin Overview - Expansive Bakken Reservoir Bakken Cross Section West to East Across Williston Elm Coulee Field Richland Co., MT Pale Rider Roosevelt Co., MT Rough Rider McKenzie Co. ND South Nesson Dunn Co., ND East Nesson Mountrail Co., ND BEXP Acreage Area 100,000 Net Acres in Eastern M
Slide 22: Williston Basin - Mountrail County Area Drilling Plan
2007 PUDs 2007 BEXP Wells 2008 BEXP Wells 2008 PUDs Williston Basin - Mountrail County Area Current 2007 - 2008 Drilling Plan '08 Total 51 32 83 '08 Non Op. 44 19 63 13 20 '08 Oper. 7 '07 3 6 9 PDP PUD TOTAL After Proved Credit for 9 Gross or ~5 Net Booked Locations in 2007 Current 2008 Plan Provide
Slide 23: Mountrail County Area Fully Developed Assuming 640 Acre Development
Williston Basin - Mountrail County Area Fully Developed Assuming 640 Acre Dev. (Potentially >Gross 300 Wells) Assuming 640 Acre Spacing Potential to Drill Over 300 Gross or 137 Net Wells East of the Nesson Anticline Parshall/Austin Area Stanley Area Ross Area
Slide 24: Comparison of Elm Coulee & Mountrail Bakken Drilling Areas
Williston Basin Overview Brief Comparison of Elm Coulee & Mountrail Bakken Drilling Areas
Slide 25: Bakken Oil Production Elm Coulee vs Dunn & Mountrail Counties
Williston Basin Bakken Oil Production Elm Coulee vs Dunn & Mountrail Counties Elm Coulee Mountrail Dunn 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 With Continued Drilling Success Mountrail & Dunn County Production Will Both Eclipse Elm Coulee
Slide 26: Elm Coulee/Mountrail County Overlay
Williston Basin Elm Coulee/Mountrail County Overlay To Approximate Scale Parshall/Austin Area Stanley Area Ross Area Estimated BEXP Leasehold Over 88,000 Net Acres & Growing Approximately 2 laterals in each section thus far in Elm Coulee (some long laterals from other sections, some tri-laterals) 9
Slide 27: Current View on Mountrail Bakken Drilling Economics
Williston Basin Overview Brief Look at Our Current View on Mountrail Bakken Drilling Economics
Slide 28: Bakken Reserves & Economics: Break Even
Williston Basin Bakken Reserves & Economics Break Even Today ~ 158 Mbo Break Even ~158 Mbo * Based on NYMEX strip at 4/07/08. Price differentials: $1.256/Mcf & -$5.337/Bbl. CWC of $4.95 million in Ross, $5.5 million in Parshall/Austin. OPEX at $8397/month. Monthly average rate which given natural de
Slide 29: Bakken Reserves & Economics: Ross Area
Williston Basin Bakken Reserves & Economics Ross Area Avg. Res/Well Currently Est. @ 200 - 400 Mbo Ross Area 200 - 400 Mbo Drill Net PV10%/$ $/Mcfe PV10% (mill.) Coverage ROR * Based on NYMEX strip at 4/07/08. Price differentials: $1.256/Mcf & -$5.337/Bbl. CWC of $4.95 million in Ross, $5.5 million
Slide 30: Bakken Reserves & Economics: Parshall/Austin
Drill Net PV10%/$ $/Mcfe PV10% (mill.) Coverage ROR Williston Basin Bakken Reserves & Economics Parshall/Austin Avg. Reserves Currently Est. @ 400 - 1,000 Mbo Ross Area 200 - 400 Mbo Parshall/Austin Area 400 - 1,000 Mbo 200 Mbo $4.37 $1.58 1.3 18% 300 Mbo $2.93 $5.14 2.1 41% 400 Mbo $2.20 $8.98 2.9
Slide 31: Elm Coulee & Dunn County EURs vs Mountrail Area
Williston Basin Bakken Reserves & Economics Elm Coulee & Dunn County EUR's vs Mountrail Area Parshall/Austin Area Midpoint ~ 700 Mbo Ross Area Midpoint ~ 300 Mbo Elm Coulee Avg. ~ 437 Mbo Dunn County Avg. ~ 258 Mbo * Based on NYMEX strip at 4/07/08. Price differentials: $1.256/Mcf & -$5.337/Bbl. CWC
Slide 32: Williston Basin Geologic Overview
Williston Basin Geologic Overview Jeff Larson
Slide 33: Williston Basin Structure Map
Williston Basin Structure Map Base of Mississippian Large Intra-Cratonic 'Sag' Basin 'Inside' Stable Continent Illinois & Michigan Basins Circular Geometry Over 125,000 sq miles Parts of Three States and Two Provinces Old Basin Began Subsiding in the Late Cambrian (490 m.y.a) Bakken Occupies Only No
Slide 34: Williston Basin Regional Cross-Section
After Peterson 1987 Williston Basin Regional Cross-Section After Peterson 1987 Resembles a Giant Cereal Bowl Over 15,000 ft of Strata in Center Feather Edges Formations 'Pinch-out' Elm Coulee Field Variable Amounts of Subsidence Through Time Some Formations Very Thick, 'Rapid Subsidence' Variable De
Slide 35: Generalized Williston Basin Stratigraphic Section
Generalized Williston Basin Stratigraphic Section Majority of the Geologic Section Represented in Basin Paleozoic Through Tertiary Paleozoic Section is Dominated by Marine Limestones and Dolomites 99% Hydrocarbons 90% From Paleozoic Carbonates Numerous Producing Intervals Mesozoic and Cenozoic Secti
Slide 36: Mountrail County Bakken Type Log
Mountrail County Bakken Type Log Lear Petroleum East Parshall S #1 Sanish
Slide 37: Mountrail County Bakken Type Log
Mountrail County Bakken Type Log Lear Petroleum East Parshall S #1 Upper Devonian / Lower Mississippian Aged Age of Fishes Equivalent to Chattanooga, New Albany, Woodford Shales Depths Range from 8,500' to 11,000' Maximum Total Thickness: 170 ft Divided into 3 Members: Upper and Lower Shale Members
Slide 38: Upper and Lower Bakken Core Photograph
Upper and Lower Bakken Core Photograph Upper and Lower Shales are Lithologically Similar: Black Color, Anoxic 'Oxygen Starved' Deposition Few Burrows, Pyrite (Reducing Environment) High Organic Content ('World Class Source Rock') Average 10% TOC Thin Laminations Quiet Water Deposition Scattered Stor
Slide 39: Middle Bakken Core Photograph
Middle Bakken Core Photograph Mountrail Area Example Higher Energy Deposition Coarser Grains, Marine Near Shore Environment Laminations Bioturbation (Burrowing) Oxygenated Sediments Illustrates Variable 'Heterogeneous' Lithologies Upper Part is Dolomite Lower Part Quartz-Rich Sandstone Several Diffe
Slide 40: Bakken Depositional Model
Bakken Depositional Model Seaward Landward
Slide 41: Bakken Depositional Model
Bakken Depositional Model Fossil Record Indicates Marine Conditions Throughout Upper & Lower Shale Deposition Basin Partially Restricted (Little Water Flow) Stratified Water Column (No 'Turn -Over') Quiet Water, Anoxic (Oxygen Starved) Bottom Conditions Reducing Environment Ideal of Organic Preserva
Slide 42: Bakken Hydrocarbon Generation Model
Bakken Hydrocarbon Generation Model Bakken Upper Middle Lower
Slide 43: Bakken Hydrocarbon Generation Model
Bakken Hydrocarbon Generation Model Shales Experienced Several Important Hydrocarbon Generating Conditions with Burial Increasing Temperatures & Significant Timeline Onset of Hydrocarbon Generation 9,000 ft with Intense Window at 10,000 ft Thermal Maturation Temperatures Estimated 100 C / 212 F Late
Slide 44: Williston Basin Basement Block Faulting
Williston Basin Basement Block Faulting Lineament Lineament
Slide 45: Structural Block Diagram
Structural Block Diagram Illustrate Structural Implications in Basin Critical to Understanding of Predicting New Areas to Explore Williston Basin Underlain by Very Old (Pre-Cambrian) Granitic Basement Rocks Broken Up into Large Blocks Township to 1/2 County Scale Blocks Separated by Zones Structural
Slide 46: Williston Basin Historical Bakken Activity Map
Williston Basin Historical Bakken Activity Map Antelope Field 1953 Nesson Anticline 1950's-1960's Elkhorn Ranch 1961 Bicentennial 1987-1999 Elm Coulee 2001 Nesson Anticline 2004 Saskatchewan 2004 West Side of Nesson 2005 Parshall Field 2006 Elm Coulee Extension 2007 Production 'Bakken Kitchen' (Resi
Slide 47: Bakken Historical Activity
Bakken Historical Activity Antelope Field (1953) Sanish Production, Several Bakken Tests 90 Vertical Wells 41 MMBO & 60 BCF Cumulative Nesson Anticline (1950's - 1960's) Scattered Early Vertical Development Elkhorn Ranch Field (1961) Shell, Vertical Wells Bicentennial / Elkhorn Ranch (1987 - 1999) M
Slide 48: Williston Basin Geologic Overview Summary
Williston Basin Geologic Overview Summary "Our Technical Team has Developed a Comprehensive Understanding of Geologic & Geophysical Aspects of the Williston Basin Which Will Greatly Aid Our Successful Exploration for Hydrocarbons in the Bakken and Other Formations in the Basin"
Slide 49: Bakken Operations Overview
Bakken Operations Overview Lance Langford
Slide 50: Williston Basin Historical Bakken Drilling Activity
Williston Basin Historical Bakken Drilling Activity Antelope Field 1953 Nesson Anticline 1950's-1960's Elkhorn Ranch 1961 Bicentennial 1987-1999 Elm Coulee 2000 Nesson Anticline 2004 Saskatchewan 2004 West Side of Nesson 2005 Parshall Field 2006 Elm Coulee Extension 2007 1950 to late-1980s - vertica
Slide 51: Bakken Drilling and Completions
Bakken Drilling and Completions
Slide 52: Williston Basin Map
Williston Basin Map
Slide 53: Well Bore Design West of Nesson Anticline
Well Bore Design West of Nesson Anticline Initiated Bakken drilling program in Williams & McKenzie Cos., ND (Rough Rider) in 2006 Drilled 3 wells utilizing the following design: 1280 acre spacing with 8,100' lateral Preperforated uncemented liner Large single uncontrolled fracture stimulation Typica
Slide 54: Well Bore Design East of Nesson Anticline
Well Bore Design East of Nesson Anticline Initiated Bakken drilling in Mountrail Co., ND (Easy Rider) in 2007 Drilled 5 wells to date utilizing the following design: 640 Acre Spacing with 4,900' lateral Uncemented liner with swell packers Multiple isolated fracture stimulations between swell packers
Slide 55: Bakken Swell Packer Tools
Bakken Swell Packer Tools Swell Packer Frac Sleeve
Slide 56: Bakken Technology Consortium
Bakken Technology Consortium
Slide 57: Bakken Consortium Overview
Seven E&P Companies & Schlumberger E&P Companies share costs / revenues Schlumberger provides discounted and free services 3 wells drilled east flank of Nesson Anticline Within 3D Seismic shoot 4/17/2008 57 DDM Bakken Consortium Overview Bakken Consortium
Slide 58: Technology Consortium Major Objectives
Compare 3 major completion designs Preperforated uncemented liners Uncemented liners with Swell Packers Cemented liners Study refracture stimulations Optimize fracture stimulation designs Correlate with 3-D Study long-term production results 4/17/2008 58 DDM Technology Consortium Major Objectives
Slide 59: Fracture Stimulation Monitoring with Vertical Wells
3 Optimally Placed Sub-Bakken Vertical Penetrations with wellbores suitable for geophone deployment. 6,000 ft Horizontal Producer 2,000' between vertical wells 2,000' between vertical wells 2,000' between vertical wells Typical Fracture Stimulation Monitoring 640 Acre Section Typical fracture stimul
Slide 60: Technology Consortium Plan
4/17/2008 Monitoring Well (Cemented liner) Producer #1 (Pre-perforated liner) Producer #2 (liner with swell packers) ~1500 ft ~1500 ft Technology Consortium Plan 1500 ft 1500 ft of geophones 1500 ft First industry attempt with horizontal monitoring well 3 horizontal wells drilled: 2 producing wells
Slide 61: Consortium Current Status/Conclusions
All 3 wells TD'd Drilling and Logging data quality has been good Geophones expected to deploy the week before fracture stimulation Expected to fracture stimulate both producers in May Seismic interpretation will be begin in May 4/17/2008 61 DDM Consortium Current Status/Conclusions
Slide 62: Bakken Full Scale Field Development
Bakken Full Scale Field Development
Slide 63: Full Scale Field Development
Full Scale Field Development Growing Bakken staff Preparing additional locations in Ross and Stanley areas Rig availability Evaluating field yard opportunities Evaluating further field optimizations such as equipment acquisitions Evaluating water supply and water disposal alternatives
Slide 64: Bakken Oil and Natural Gas Marketing
Bakken Oil and Natural Gas Marketing
Slide 65: Oil Pipelines and Refineries
Oil Pipelines and Refineries Keystone Pipeline Enbridge Pipeline Oil Refineries Oil Pipelines Platte Pipeline Butte Pipeline Suncor 88,000 Frontier 52,000 Tesoro 58,000 Sinclair 22,500 Conoco Phillips 58,000 ExxonMobil 60,000 Cenex 56,000 Big West 25,000 Chevron Texaco 45,000 Holly Corp 25,000 Silve
Slide 66: North Dakota Oil Marketing Overview
North Dakota Oil Marketing Overview Markets for Williston Basin crude oil production are: Refineries within the Rocky Mountain Region Refineries in the Midwest via two "export" pipelines Regional Refining Capacity 15 refineries in the Rocky Mountain Region Capacity exceeds local production so substa
Slide 67: North Dakota Oil Marketing Export Capacity
North Dakota Oil Marketing Export Capacity Enbridge Pipeline moves 110,000 BOPD to Clearbrook, MN. Platte Pipeline moves 150,000 BOPD to Wood River, IL. Expansion Projects Enbridge will expand capacity from 110,000 to 161,000 BOPD by early 2010 Keystone planning 435,000 BOPD to Patoka, IL. by late 2
Slide 68: North Dakota Oil Marketing
North Dakota Oil Marketing ROCKIES OIL PRICE DIFFERENTIALS TO NYMEX S—MOUNTRAIL, ND’ $ $ s S$ $ g $ SEL EPP IPFSPPEPEPESH
Slide 69: Natural Gas Pipelines
Natural Gas Pipelines Headington Hess EOG Whiting Bear Paw McKenzie County 148N-105W Brigham Carkuff 22-1-H Proposed Brigham Manitou State 36-1H Drilling Brigham Hynek 2-1H IP: 585 BOEPD Brigham Bakke 23-1-H IP: 380 BOEPD Brigham Bergstrom 26-1H IP: 202 BOEPD Brigham Hallingstad 27-1H Est 400 BOEPD
Slide 70: North Dakota Natural Gas Marketing
North Dakota Natural Gas Marketing West of Nesson Anticline Bear Paw Energy purchases all of Brigham's gas under long term percentage of proceeds contract Plant capacity is expanding from 60 MMcfd to 100 MMcfd in 2008 East of Nesson Anticline Area is in early stages of gas gathering infrastructure d
Slide 71: North Dakota Natural Gas Marketing Interstate Take away
North Dakota Natural Gas Marketing Interstate Take away Williston Basin Interstate Pipeline is the major Transporter of gas from North Dakota Expansion of these facilities could be in service by late 2008. Brigham's Plan Continue negotiations with producer owned gathering systems for connection of t
Slide 72: Bakken Economics
Bakken Economics
Slide 73: Bakken Reserves & Economics: Break Even
Williston Basin Bakken Reserves & Economics Break Even Today ~ 158 Mbo Break Even ~158 Mbo * Based on NYMEX strip at 4/07/08. Price differentials: $1.256/Mcf & -$5.337/Bbl. CWC of $4.95 million in Ross, $5.5 million in Parshall/Austin. OPEX at $8397/month. Monthly average rate which given natural de
Slide 74: Bakken Reserves & Economics: Ross Area
Williston Basin Bakken Reserves & Economics Ross Area Avg. Res/Well Currently Est. @ 200 - 400 Mbo Ross Area 200 - 400 Mbo Drill Net PV10%/$ $/Mcfe PV10% (mill.) Coverage ROR * Based on NYMEX strip at 4/07/08. Price differentials: $1.256/Mcf & -$5.337/Bbl. CWC of $4.95 million in Ross, $5.5 million
Slide 75: Bakken Reserves & Economics: Parshall/Austin
Drill Net PV10%/$ $/Mcfe PV10% (mill.) Coverage ROR Williston Basin Bakken Reserves & Economics Parshall/Austin Avg. Reserves Currently Est. @ 400 - 1,000 Mbo Ross Area 200 - 400 Mbo Parshall/Austin Area 400 - 1,000 Mbo 200 Mbo $4.37 $1.58 1.3 18% 300 Mbo $2.93 $5.14 2.1 41% 400 Mbo $2.20 $8.98 2.9
Slide 76: Ross & Parshall/Austin Price Sensitivities
Williston Basin Bakken Reserves & Economics Ross & Parshall/Austin Price Sensitivities Parshall/ Austin Midpoint ~ 700 Mbo * Based on NYMEX strip at 4/07/08. Price differentials: $1.256/Mcf & -$5.337/Bbl. CWC of $4.95 million in Ross, $5.5 million in Parshall/Austin. OPEX at $8397/month. Ross Area M
Slide 77: Ross & Parshall/Austin Price Sensitivities
Williston Basin Bakken Reserves & Economics Ross & Parshall/Austin Price Sensitivities Parshall/ Austin Midpoint ~ 700 Mbo * Based on NYMEX strip at 4/07/08. Price differentials: $1.256/Mcf & -$5.337/Bbl. CWC of $4.95 million in Ross, $5.5 million in Parshall/Austin. OPEX at $8397/month.. Ross Area
Slide 78: Current 2008 Drilling Plan
Current 2008 Drilling Plan
Slide 79: Extensive Bakken Drilling Inventory
Extensive Bakken Drilling Inventory Net Wells Proved in 2007, Expected to be Proved in 2008 & Potential Locations Approximately 2.5 net wells were proved developed @ YE 2007, estimate roughly 8.6 net proved developed wells @ YE 2008 Estimate to have ~19 net wells added to proved @ YE 2008, assuming
Slide 80: Mountrail County & Extensional Areas 2007-2008 Drilling Plan
2007 PUDs 2007 BEXP Wells 2008 BEXP Wells 2008 PUDs Mountrail County & Extensional Areas Current 2007 - 2008 Drilling Plan '08 Total 51 32 83 '08 Non Op. 44 19 63 13 20 '08 Oper. 7 '07 3 6 9 PDP PUD TOTAL After Proved Credit for 9 Gross or ~5 Net Booked Locations in 2007 Current 2008 Plan Provides P
Slide 81: BEXP Net Bakken Production
BEXP Net Bakken Production Estimated Exit Q1 2008 ~ 450 Boepd Net ~400 Net Boepd from 2.5 net wells completed late 2007 & early 2008. Estimated 8.6 net wells online by YE 2008 Manitou State (100% WI, Ross Area) currently completing Johnson (38% WI, N. Stanley Area) currently drilling Non Operated Pa
Slide 82: Vicksburg Overview
Vicksburg Overview
Slide 83: Vicksburg ExxonMobil Joint Venture Overview
Formed the first JV with ExxonMobil in 1997 4 additional JVs implemented Since 1999, 39 completions in 41 attempts In 2007, completed all 5 100% initial WI wells Anticipate 2008 wells at initial 100% WI 3 Year Total Proved F&D of $2.77/Mcfe 54 drilling locations at year-end 2007 34 proved, 12 probab
Slide 84: Exploiting the Vicksburg
Exploiting the Vicksburg Two Rigs Currently Running Operating Overview Difficult drilling environment: High mud weights: 18.0+ ppg >300° bottom hole temperature Laminated lithology Casing collapse has been an issue Large fracture stimulations required Condensate ranges from 10-100 BO/MMcf 2008 Wells
Slide 85: Driving Operational Excellence
Driving Operational Excellence Implementing Optimal Drill & Complete Technologies Early wells drilled with oil based drilling fluids Experienced severe losses and casing problems / collapses Switched to water based mud and alleviated most lost circulation issues Continual evolution of drilling and c
Slide 86: Brooks County Vicksburg Drilling Curves
Brooks County Vicksburg Drilling Curves
Slide 87: Brooks County Vicksburg Drilling Curves
Brooks County Vicksburg Drilling Curves
Slide 88: Brooks County Vicksburg Drilling Curves
Brooks County Vicksburg Drilling Curves
Slide 89: Brooks County Vicksburg Drilling Curves
Brooks County Vicksburg Drilling Curves
Slide 90: Brooks County Vicksburg Drilling Curves
Brooks County Vicksburg Drilling Curves BEXP drilled the fastest well (Sullivan C-36) in Brooks County to 13,500': 20 days
Slide 91: Brooks County Vicksburg Drilling Costs 2006-2007 Wells
Brooks County Vicksburg Drilling Costs 2006-2007 Wells
Slide 92: Southern Louisiana Overview
Southern Louisiana Overview
Slide 93: Southern Louisiana JV
Southern Louisiana JV Relatively Low Risk Shallow 3-D Delineated Prospects Diane Breton SD 52 Romere Pass SE Tiger Pass Main Pass 66 Chandeleur Sound Executed JV to drill 6 wells in next 18 months Retain option to terminate if 3 of first 5 wells not completed Currently plan to drill approximately 5
Slide 94: Finance Overview
Finance Overview
Slide 95: Financial Discussion and Strategy
Financial Discussion and Strategy Balance Sheet - Maintain strong balance sheet 2008 E&D Capex - Fund majority through internally generated cash flow and proceeds from Granite Wash asset sale Hedge Portfolio - Hedged during 2008 with a $8.11 per Mcfe floor price NAV per Share - Currently trading at
Slide 96: Balance Sheet
Balance Sheet Maintain Strong Balance Sheet Current balance sheet ratios in-line with that of peer companies Conservative 2008 capex budget funded largely with cash flow and proceeds from Granite Wash asset sale Target total debt / EBITDA and total debt / book capitalization ratios below 2.0x and 45
Slide 97: 2008 Capital Expenditure Plan Funding Review
2008 Capital Expenditure Plan Funding Review 2004 2005 2006 2007 2008E East 81.2 110.5 174 102.4 120.8 $81 $110 $174 E&D CAPEX ($ MILLIONS) $102 $121 GC AB Rockies WT & Other S LA East 28 11 43 3 15 Gulf Coast 28% Anadarko Basin 11% W. TX/Other 3% Rockies 43% S. LA 15% Anadarko Basin 11% Allocation
Slide 98: Hedge Portfolio
Hedge Portfolio 2008 Hedged at $8.11/Mcfe Floor Price 2008 Hedged at $8.11/Mcfe Floor Price 2008 Hedged at $8.11/Mcfe Floor Price
Slide 99: Currently Valued at a Discount to Proved NAV
Currently Valued at a Discount to Proved NAV Bakken, Mowry and Exploration Portfolio Represent Upside NAV Calculation: Proved reserves at Year-End 2007 April 14, 2008 Strip Prices PV10 Value $ 629.2 Million Less: Debt 180.1 Million Net Asset Value $ 449.1 Million Shares Outstanding ÷ 46.1 Million Sh
Slide 100: Key Takeaways
Key Takeaways
Slide 101: Key Takeaways
Key Takeaways As Was the Case Historically, Our Recent Long-Term Land and Seismic Investments Position Us for a Multi-Year Period of Higher Rate Reserve Growth & Lower Finding Costs Potentially Highly Impactful 240,000 Net Acre Position in Williston Basin Targeting Multiple Objectives in ND and MT B