St. Augustine Gold & Copper Ltd. · TSX:SAU
St. Augustine Gold & Copper — Investor Presentation (October 2011)
17 slides from St. Augustine Gold & Copper's investor presentation, Oct 6, 2011
Slide 1: King-king Gold and Copper Project
King-king Gold and Copper Project October 2011 T: 509.343.3193 SAU.TO www.sagcmining.com
Slide 2: Forward-Looking Statements
St. Augustine Gold & Copper Ltd. Forward-Looking Statements This presentation contains “forward-looking statements” that were based on St. Augustine Gold & Copper Ltd’s expectations, estimates and projections as of the dates which those statements were made. These forward- looking statements include
Slide 3: Summary Information
St. Augustine Gold & Copper Ltd. Summary Information Price Per Total Asset - King-king Gold & Copper Cash Raised Share Shares deposit in the Philippines RTO 1/7/2011 $7,000,000 90,000,000 60% earn-in and operations Tranche 1 $25,900,000 $0.30 86,333,334 Tranche 2 $40,016,000 $1.22 32,800,000 T
Slide 4: A Unique Investment Opportunity
St. Augustine Gold & Copper Ltd. A Unique Investment Opportunity Management controlled, Independently owned, world class gold/copper development with a 60% earn-in right located in Asia Limited global supply of large scale copper projects Low cost operation that is highly economical Front en
Slide 5: King-king Deposit: World-Class Project
St. Augustine Gold & Copper Ltd. King-king Deposit: World-Class Project 962.3 million tonne M&I resource: Philippine Fault 10.3 million oz. gold 5.4 billion lbs. copper Average annual production first 5 years*: 529,000 oz. gold 193 million lbs. copper *Based on 112,000 TPD 110,000–130,
Slide 6: King-king Geology & Upside Potential
St. Augustine Gold & Copper Ltd. King-king Geology & Upside Potential Gold-rich porphyry copper deposit w/ epithermal vein systems (1,656 ha) Epithermal Prospect: Resources based on 289 holes/93,869 meters Epithermal; low sulfidation quartz- We Control 100%: We Control 25%: Potential King-ki
Slide 7: King-king Deposit Area
St. Augustine Gold & Copper Ltd. King-king Deposit Area Confirmation drilling underway Primary development opportunities to the north and northeast No holes outside planned pit Significant surface sampling in northeast tenement areas Two major potential gold deposits are approximately 3 km
Slide 8: Corporate Structure
St. Augustine Gold & Copper Ltd. Corporate Structure St. Augustine Gold and Copper Ltd. (BVI Corp) TSX: SAU.TO Technical Services Group Off Shore Services Asset Holder MDC America, Inc. St. Augustine Mining Limited (US C Corp) (Cayman Islands Corp) (ExPat Employees) Subsidiary of SAMI Kingking Pantu
Slide 9: JV Companies: Corporate Structure
St. Augustine Gold & Copper Ltd. JV Companies: Corporate Structure Nadecor Joint Venture SAML 60% Kingking Pantukan 40% Holdings. Inc. MINING 50% 10% Kingking Gold and 40% Copper Mines, Inc. Ore Sales Transfer at: Mining Cost + 10% MILLING Pantukan Gold and 40% Copper Milling 60% Corporation … The “
Slide 10: King-king Project Earn-in
St. Augustine Gold & Copper Ltd. King-king Project Earn-in Total Earn-In $7.5M Payments to Nadecor 6% $43.5M BFS 45% $45.7M Capex [$32M Commit + $13.7 TPD] 9% $96.7M 60% Amount (M$) % Earn-in Earn-in to date $53.7M 33% Tot Earn-in (May ’12) $96.7M 60% www.sagcmining.com 10
Slide 11: King-king Near Term Deliverables
St. Augustine Gold & Copper Ltd. King-king Near Term Deliverables BFS, Permitting and DMPF Wrap Up Q2 2012 Internal SAG&C Use Only 11
Slide 12: Project Accomplishments to date
St. Augustine Gold & Copper Ltd. Project Accomplishments to date Signing of LOI with Philippine partner, Nadecor July 2009 Internal assessment and update of project data Q3/4 2009 Signing of legally binding MOU Apr 2010 60% earn-in with total commitment of US$96.7m Operation control Agre
Slide 13: Management Team
St. Augustine Gold & Copper Ltd. Management Team Chairman/ Robert Russell • Executive VP and GM – Freeport McMoRan Copper and Gold Director • GM – Freeport Indonesia • GM – Nchanga Division, Zambian Consolidated Copper Mines • Chairman/CEO/Founder – General Moly/Idaho General Mines President/ Andrew
Slide 14: Cautionary Note and Compliance
St. Augustine Gold & Copper Ltd. Cautionary Note and Compliance The information contained in this document has not been independently verified. No representation or warranty, express or implied, is made as to, and no reliance should be placed on, the fairness, accuracy, completeness, or correctness
Slide 15: Major Consultants and Deliverables
St. Augustine Gold & Copper Ltd. Major Consultants and Deliverables AATA and ECI: Philippine Environmental Impact Assessment/Environmental Impact Statement, Environmental Compliance Certificate (ECC) International Social and Environmental Impact Assessment M3 Engineering and Technology: Main
Slide 16: Feasibility Studies In Progress
St. Augustine Gold & Copper Ltd. Feasibility Studies In Progress Metallurgical Studies: Process Engineering Crushing – Complete 15% Complete Grinding – 75% Complete Land Based Tailing System Flotation – 40% Complete 35% Complete Gravity Gold Recovery – Started in July Mine Design S
Slide 17: Nadecor
St. Augustine Gold & Copper Ltd. Nadecor Nationwide Development Corp. (Nadecor) was incorporated in 1956 and was one of the first companies to undertake mineral exploration in the resource rich island of Mindanao Prior to its entry into mineral prospecting, Nadecor’s parent firm, Aguinaldo Devel