Deccan Gold Mines Limited · NSE:DECNGOLD

Deccan Gold Mines — Q1 FY2027 Earnings Presentation

22 slides from Deccan Gold Mines's earnings presentation, Aug 12, 2026

  1. Slide 1: BSE Cover Letter for Investor Presentation

    August 12, 2026 To, BSE Limited Corporate Relationship Department Phiroze Jeejeebhoy Tower, Dalal Street, Mumbai - 400 001 Scrip Code: 512068 Dear Sir, Sub.: Earnings Call -Q1 of FY 2026-2027 scheduled on August 12, 2026 – Investor Presentation In continuation of our earlier Update made on August 08

  2. Slide 2: Investor Relations Call

    Investor Relations Call 12 August 2026

  3. Slide 3: Forward Looking Statement (Disclaimer)

    Forward Looking Statement (Disclaimer) This Presentation has been prepared by Deccan Gold Mines Limited (“DGML”) for information purposes only. The Presentation does not purport to be all inclusive or to necessarily contain all the information that a prospective investor may desire in investigating

  4. Slide 4: Q1 Financial Results

    Q1 Financial Results

  5. Slide 5: Q1 Financial Results

    Q1 Financial Results ➢ Standalone profit remained positive at ₹11.5 million. ➢ Associates continued to contribute positively, supporting the Group's long-term value creation strategy. ➢ Geomysore contributed to 6.35 Cr of profit due to 59 kg of gold sale. ➢ Consolidated results reflected ongoing inv

  6. Slide 6: Projects & Strategy Update

    Projects & Strategy Update

  7. Slide 7: Two Strategic Verticals

    Two Strategic Verticals…. 100% DGFZCO Stake % 26% 60% 100% Up to 51% 85% 90% GMSI Avelum DGTPL Kalevala Gold DGMOZ DMMOZ Partners LLC Oy 100% Up to 90% Gold Kuikka Gold Lithium & Logrosan Altyn Tor Gold Copper Bhalukona Ni- Jonnagiri Gold exploration Project (+ 2 tantalum Tungsten Mine exploration C

  8. Slide 8: Gold Projects

    Gold Projects

  9. Slide 9: Gold Portfolio and Development Plan

    Gold Portfolio and Development Plan Jonnagiri Gold Mine, AP Altyn Tor, Kyrgyzstan ➢ In production ➢ In production – 1st doré produced August ➢ Q1 doré production – 112.683 kg Au ➢ Merril-Crowe ILS and smelting test run ➢ Q1 ingot production – 89.702 kg Au demonstrate operational viability ➢ Inaugura

  10. Slide 10: Jonnagiri Gold Mine, AP

    Jonnagiri Gold Mine, AP Project inaugurated in June 2026 by AP Chief Minister N Chandrababu Naidu. ➢ Q1 production: ➢ Q1 doré production – 112.683 kg Au ➢ Q1 ingot production – 89.702 kg Au ➢ Sales – 59.001 kg Au ➢ Revenue – 87,16,02,313 Rs ➢ Profit After Tax – 25,62,94,687 Rs ➢ (Deccan Gold share @

  11. Slide 11: Altyn Tor, Kyrgyzstan

    Altyn Tor, Kyrgyzstan ➢ First gold doré at Altyn Tor produced on 5 August. ➢ A batch of gravity circuit concentrate was processed through the newly installed Intensive Leach System (ILS) tanks for a proof-of-concept run. ➢ Gold was recovered from the pregnant leach solution via the Merrill-Crowe pro

  12. Slide 12: Altyn Tor, Kyrgyzstan

    Altyn Tor, Kyrgyzstan Processing Pant Aerial View, Altyn Tor Gold Project in the Kyrgyz Republic ➢ Altyn Tor Gold Project in the Kyrgyz Republic, where every milestone reflects our commitment to responsible mining, operational excellence, and long-term value creation.

  13. Slide 13: Kalevala Gold Oy, Finland

    Kalevala Gold Oy, Finland License Area Kuikankulta Mining 19.5 ha Syrjala2 272.7 ha Pahkalampi 793.5 ha Syrjala 174.5 ha Vassoniemi 562.8 ha Syrjala3 287.3 ha Vinivaara 587.1 ha Kuikankulta2 38.4 ha Total 2735.8 ha ➢ Total licensed area : 27.36 Sq km ➢ Situated in highly potential Archean green ston

  14. Slide 14: Kalevala Gold Oy, Finland

    Kalevala Gold Oy, Finland ➢ Increase holding to majority 51% during 2026/7 – requires investment of about US$1-2M. ➢ Primary focus on two deposits: ➢ Kuikka Gold Deposit in Eastern Finland. ➢ Current inventory is about 1t Au (> 5 g/t avg grade) with significant upside potential. ➢ Part of it is open

  15. Slide 15: Ganajur Gold Project, Karnataka

    Ganajur Gold Project, Karnataka ➢Ganajur Gold Project remains Deccan Gold’s one of the important gold projects and a potential key value driver. ➢Deccan Gold continues to pursue the Mining Lease through legal proceedings before the Hon'ble Karnataka High Court through its Writ Petition. ➢The Writ Pe

  16. Slide 16: Growing our Gold Portfolio

    Growing our Gold Portfolio ➢ Expansion of existing projects plus inorganic growth. ➢ New projects should be able to be brought to production by 2028. ➢ 3 new projects under consideration. ➢ Due diligence in progress. 15

  17. Slide 17: Critical Minerals Projects

    Critical Minerals Projects

  18. Slide 18: Bhalukona, Ni-Cu-PGE

    Bhalukona, Ni-Cu-PGE ➢ ~2,500 m of diamond core drilling in 15 drill holes. ➢ Mineralized zone >1.3 km, significantly extending the previously delineated mineralized trend. ➢ Intersections of disseminated and heavy to massive sulphides in most holes. Next Steps: Bhalukona license area: 30 km2 ➢ Soil

  19. Slide 19: Logrosan Tungsten Project, Spain

    Logrosan Tungsten Project, Spain ➢ Increasing stake to 51% through funding exploration activities. ➢ Drilling of the Dehesa Tungsten-Tin target: ➢ Seven drill holes for ~3,000 m to date. Drilling average depth of approximately 430 m, with the deepest hole reaching 626 m. Logrosan license area: ➢ Eve

  20. Slide 20: Mozambique – LCT Exploration

    Mozambique – LCT Exploration ➢ Total license area is ~150 km2. ➢ Geological mapping and soil sampling have identified 4-5 pegmatite zones in one block and a swarm of about 8 pegmatites on another licence area. ➢ Anomalous rock chip samples range up to 426 ppm Li, 1383 ppm Ta, 378 ppm Cs, and 1828 pp

  21. Slide 21: Critical (Battery) Metals Strategy

    Critical (Battery) Metals Strategy ➢ Focus on Battery metals and high value critical minerals. ➢ Expand operations downstream to produce battery-ready products. ➢ Bhalukona Ni-Cu-PGE, Chhattisgarh ➢ Lithium & Tantalum, Mozambique Exploration ➢ Tungsten & Tin, Spain ➢ Graphite project under due dilig

  22. Slide 22: Thank You

    Thank You