    ISAAC PLAINS Coking Coal Mine Site Visit 23 November 2016

  2. Slide 2: Important Information

    IMPORTANT INFORMATION This document has been prepared by Coal shares and has been prepared Indications of, and guidance on, future will not in any way rely upon this Stanmore Coal Limited (“Stanmore without taking into account the earnings and financial position and document. Coal”) for the purpose

  3. Slide 3: Stanmore Coal Company Overview

    STANMORE COAL COMPANY OVERVIEW The business at a glance: Independent coal company with focus on coking coal Isaac Plains operational with ramp-up achieved 1-2Mtpa sales opportunity (FY17 1.25Mt) December 2016 quarter SSCC settled at USD 130 per tonne Mining, port and rail contracts in place Mid-rang

  4. Slide 4: Overview of Stanmore Assets

    OVERVIEW OF STANMORE ASSETS BOWEN BASIN – Coking Coal ISAAC PLAINS – 100% MACKENZIE – 85% Operations Exploration ISAAC PLAINS EAST – SURAT BASIN – Thermal Coal 100% Development THE RANGE – 100% Development pending infrastructure path to market SURAT BASIN BELVIEW – 100% CLIFFORD – 60%* Exploration E

  5. Slide 5: Development History: The History of Isaac Plains

    DEVELOPMENT HISTORY THE HISTORY OF ISAAC PLAINS Located near Moranbah in the heart of the Bowen Basin, 172 km from Dalrymple Bay Coal Terminal (DBCT) via Goonyella rail line Commenced production in 2006 as a truck shovel operation 4.0Mtpa run of mine (ROM) production approvals currently in place Dra

  6. Slide 6: Combined Isaac Plains Complex

    COMBINED ISAAC PLAINS COMPLEX SIGNIFICANT SYNERGIES & MINE LIFE OPTIONS Opportunities to utilise Isaac Plains infrastructure including underutilised CHPP and rail loop CURRENT ISAAC PLAINS OPEN CUT Current 3 year mining services contract producing coal ISAAC PLAINS EAST – OPEN CUT EXTENSION Extends

  7. Slide 7: Geology

    GEOLOGY The Leichhardt seam (Rangal Coal Measures) averages 3.5m thick across the deposit. The seam splits into an upper and lower section in the far northern area Within the open-cut, depth of cover commences at 60m, dipping to the east (~5 degrees), before stepping back up over a 15- 20m upthrust

  8. Slide 8: Site Operations: Contracting Structure

    SITE OPERATIONS CONTRACTING STRUCTURE Stanmore Coal PRINCIPAL CONTRACT OVERVIEW Owner Head Contractor paid on a rolled-up rate basis a, which requires assumption of certain efficiency and operational risks Golding Waste rate ($/bcm) covering blasting Head Contractor and all overburden removal. Goldi

  9. Slide 9: Open Cut Mining

    OPEN CUT MINING AN OPTIMISED APPROACH Open cut coal mining Northern pits, N1 North (N1N) and N1 South (N1S) which are the main operating pits The mining flow is typically south to north until the economic coal from N1N and N1S is extracted, before mining out the identified graben zone toward the end

  10. Slide 10: Dragline

    DRAGLINE STANMORE OWNED DRAGLINE Dragline purchased in 2006. Relocated to site in 2008 and originally refurbished and recommissioned 2011 Contractor is responsible for planning and carrying out minor maintenance of the dragline. All maintenance activities are based on a plan developed jointly betwee

  11. Slide 11: Coal Handling & Processing Plant

    COAL HANDLING & PROCESSING PLANT STANMORE OWNED Designed nameplate feed capacity of 500tph “Dry” Rejects (i.e. no tailings dam) System uses: • A 2 Stage Dense Medium Cyclone • Jamieson Cell technology • Teetered Bed Separation CHPP MONTHLY PRODUCTION STATISTICS Overall CHPP performance and 100.0% 90

  12. Slide 12: Sales & Marketing

    SALES & MARKETING Produced around 75% semi-soft coking coal Indicative Parameter1 Isaac Plains and 25% thermal, with a total product yield of Coking Thermal 74% (project to date) Product split (%) 80% 20% Inherent Moisture (%) 2.5 3.1 FY17 year to date show an improvement in Ash (%) 9.4 14.0 coking

  13. Slide 13: Isaac Plains East: Low Strip Ratio, Adjacent Resource

    ISAAC PLAINS EAST LOW STRIP RATIO, ADJACENT RESOURCE Coking coal adjacent tenures – improved coking properties and coking fraction compared to existing Isaac Plains operation Low strip ratio coal starting <6:1, average over first 4 years sub 10:1 (lower than Isaac Plains) Environmental Authority ame

  14. Slide 14: Isaac Plains East: De-risking the Project

    ISAAC PLAINS EAST DE-RISKING THE PROJECT Significant number of holes drilled by former owners in the 1980’s Staged de-risking of the project by undertaking an initial exploration program in late 2015 Further drilling campaign commencing December 2016, providing closer points of observation for detai

  15. Slide 15: Isaac Plains Underground: Project Overview

    ISAAC PLAINS UNDERGROUND PROJECT OVERVIEW Concept mining studies indicated operation via bord & pillar operation most viable Further exploration activities are planned in 2017 to de- risk the project 15

  16. Slide 16: Stronger Pricing Outlook

    STRONGER PRICING OUTLOOK CONTINUED STRENGTH IN COKING COAL MARKET Contracted December quarter reflecting trend in spot market Historical coking coal prices 350 Hard coking coal USD200 (up 300 USD107.50 from Sep QTR) 250 Semi soft coking coal USD130 (up US$/tonne USD56 from Sep QTR) 200 Thermal coal

  17. Slide 17: Strategic Objectives

    STRATEGIC OBJECTIVES Time horizon Internal External Short Establish reliability and Assess potential assets in repeatability of production proximity to IP Complex from Isaac Plains Medium Develop Isaac Plains East Pursue realistically and complete assessment attainable assets with of Isaac Plains pr