Chaparral Energy — Merger or Acquisition (July 2008)
40 slides from Chaparral Energy's merger presentation, Jul 16, 2008
Slide 1: Operational Update: Merger with Edge Petroleum
Filed by Chaparral Energy, Inc. Pursuant to Rule 165 and 425 under the Securities Act of 1933, as amended Subject Company: Edge Petroleum Corporation Exchange Act File Number: 000-22149 Dated July 15, 2008 Operational Update Merger with Edge Petroleum July 2008 Exhibit 99.1
Slide 2: Additional Information
Additional Information In connection with the proposed merger, Chaparral and Edge intend to file materials relating to the transaction with the SEC, including a registration statement of Chaparral, which will include a prospectus of Chaparral and a proxy statement of Edge. INVESTORS AND SECURITY HOL
Slide 3: Agenda
Agenda Transaction Chaparral Overview Chaparral Strategy and Project Review Review of Edge Petroleum Merger Financing
Slide 4: Strategic Fit and Financing Structure
Strategic Fit Financing Structure Strategic Fit • Chaparral Energy and Edge Petroleum have signed a definitive merger agreement • Edge’s exploratory asset base is highly complementary to CPR’s large low-risk drilling and EOR portfolio • Increase in critical mass with combined proved reserves of 1150
Slide 5: Agenda
Agenda Transaction Chaparral Overview Chaparral Strategy and Project Review Review of Edge Petroleum Merger Financing
Slide 6: Company overview
Company overview Operational summary December Total proved reserves 987 Bcfe % Proved developed 65% % Crude oil 60% SEC pretax PV-10 ¹ $2,672mm R/P ratio 24.3 years Avg. daily production 111 Mmcfe Financial summary ($MM, except ratios) Year Ended 12/31/07 Avg. wellhead price ($/mcfe) $ 9.01 Oil and
Slide 7: Operational Overview
Operational Overview Core area Growth area Acreage Field offices Headquarters Gulf Coast Reserves: 51.5 Bcfe, 5% of total Production: 10.4 Mmcfed, 9% of total Ouachita Uplift Midland Basin Delaware Basin Val Verde Basin Williston Basin Powder River Basin Greater Green River Basin San Juan Basin Anad
Slide 8: Key Investment Considerations
Key Investment Considerations Long-lived reserves with stable and predictable production profiles Reserves are 60% oil and 72% operated with 88% located in the Mid- Continent and Permian Basin Strong track record of replacing reserves at low cost through acquisitions of mature properties and creatin
Slide 9: Strong Record Of Reserve And Production Growth
Year-end reserves (Bcfe) Annual production (Bcfe) 1,000 1,100 Strong Record Of Reserve And Production Growth 2003-2007 CAGR = 34% 2003-2007 CAGR = 28%
Slide 10: Impressive Reserve Replacement At Attractive Costs
Reserve replacement ratio (%) 3-year fully developed FD&A cost ($/Mcfe) 610% 468% 794% 822% 991% 301% 0% 200% 400% 600% 800% 1000% 1200% Impressive Reserve Replacement At Attractive Costs Reserve replacement average of 664% per year 3-year fully developed FD&A cost of $3.00/Mcfe $1.82 $2.37 $3.00 $0
Slide 11: Chaparral
Chaparral
Slide 12: Agenda
Agenda Transaction Chaparral Overview Chaparral Strategy and Project Review Review of Edge Petroleum Merger Financing
Slide 13: Chaparral's Operating Strategy
Chaparral’s Operating Strategy Acquire mature properties and enhance production through recompletions and workovers Increase reserves and production through drilling of low-risk inventory Expand drilling focus to include shorter R/P areas (Gulf Coast, etc.) to increase near-term earnings and balance
Slide 14: Oil And Gas Capital Expenditures
O&G capital expenditures ($MM) Continued focus on drilling 2008 drilling budget by area Oil And Gas Capital Expenditures (1) 2007 amount represents amounts released from escrow related to Calumet acquisition. Note: Excludes service company acquisition ($25 million) and potential ethanol plant invest
Slide 15: Net Daily Production
Net Daily Production Net Daily Production Average net daily production by quarter
Slide 16: Strategy – Acquire, Enhance, Drill
Typical Enhancements Disciplined Acquisitions Low-Risk Dev Drilling Strategy – Acquire, Enhance, Drill 76% of reserves added 2004 - 2007 were through acquisitions Continue to pursue acquisitions in the $1 million to $20 million range Minor acquisitions represent 14% of planned 2008 oil and gas capex
Slide 17: Low-Risk Drilling Inventory: Southwest Antioch Gibson Sand Unit
Low-Risk Drilling Inventory Southwest Antioch Gibson Sand Unit Garvin County, OK Chaparral assumes operations Gas Mcf/mo Oil Bbl/mo Area affected by gas injection Chaparral’s third largest field by proved reserves. 7,000’ depth Chaparral acreage Field shutdown & plugging Unit Statistics OOIP (Mmbo)
Slide 18: Low-Risk Drilling Inventory: Cleveland Sand Play
Low-Risk Drilling Inventory Cleveland Sand Play Horizontal drilling Tight sand play 8,300’ depth Gross reserves/well bcfe: 1.6 Gross CapEx / well $M: $2.3 Company net acres: 6,600 Total seismic sq.mi.: Avg working interest: 60% Potential drill locations: Total net CapEx $MM: $36.0 Wells planned 2008
Slide 19: Low-Risk Drilling Inventory: Carter County, OK
Low-Risk Drilling Inventory Carter County, OK Gross reserves/well bcfe: 0.4 Gross CapEx / well $M: $0.7 Company net acres: 2,235 Total seismic sq.mi.: Avg working interest: 79.4% Potential drill locations: Total net CapEx $MM: $99.6 Wells planned 2008: 2008 net CapEx $MM: $18.8 Fox Deese Springer Un
Slide 20: J. PARKER A-943 M. KYLE A-1158 M. KYLE A-1163 M. KYLE A-1153 T.& P.R.R.CO.
J. PARKER A-943 M. KYLE A-1158 M. KYLE A-1163 M. KYLE A-1153 T.& P.R.R.CO. A-101 T.& P.R.R.CO. A-107 T.& P.R.R.CO. A-113 T.& P.R.R.CO. A-95 C. TYLER A-890 STATE T.& P.R.R.CO. A-119 T&P RR CO BLK 56 T1 1 10 11 12 13 14 15 16 17 18 19 2 20 21 22 23 24 25 26 27 28 29 3 30 30 31 32 33 34 35 36 37 38 39
Slide 21: Low-Risk Drilling Inventory: Haley Area Play
PSL BLK 28 PSL BLK 29 Low-Risk Drilling Inventory PETRA 4/26/2007 9:53:06 AM Haley Area Play Haley Area Play Bone Springs, Strawn, Atoka and Morrow Play (17,700’ depth) Expensive wells High production rates Large reserve potential 2008 Bone Springs Locations 2008 Deep Drilling Locations Add’l Deep D
Slide 22: Diamond Ring Production Map
Low-Risk Drilling Inventory Diamond Ring Production Map Washita County, OK Gunter 4-26H Gunter 4 - 26H - 26H 26H
Slide 23: Exploratory Drilling Inventory: Gulf Coast Plays
Exploratory Drilling Inventory Gulf Coast Plays Gulf Coast Plays 27 sq.mi. + 15 sq.mi. planned 40 sq.mi. + 60 sq.mi. planned Gross reserves/well bcfe: 4.5 Gross CapEx / well $MM: $2.2 Company net acres: 54,642 Total seismic sq.mi.: Avg working interest: 78% Potential drill locations: Total net CapEx
Slide 24: Enhanced Oil Recovery (EOR)
Enhanced Oil Recovery (EOR) Polymer CO
Slide 25: Chemical Flooding (Polymer)
CHEMICAL FLOODING (Polymer) The method shown requires a prefiush to condition the reservoir, the injection of a polymer solution for mobility control to minimize channeling, and a driving fluid (water) to move the polymer solution and resulting oil bank to production wells. Mobility rato is channels
Slide 26: Enhanced Oil Recovery: North Burbank Unit
Enhanced Oil Recovery (EOR) T27N-R6E PETRA 5/1/2007 4:36:57 PM North Burbank Unit WI – 99.25% (operated property) Size – 23,080 acres; Depth - 3,000’ Cum. Recovery – MMBO (primary & secondary recovery) Producing zone - Bartlesville Reservoir – Tier Wells - 237 producing, 160 injection, 555 TA Prod.
Slide 27: Enhanced Oil Recovery (EOR)
Enhanced Oil Recovery (EOR) Polymer CO
Slide 28: Substantial Upside with CO2 Tertiary Recovery
CO 2 tertiary recovery projects Economics (4 proved reserve projects) Substantial Upside with CO Tertiary Recovery CO project inventory 4 proved reserve projects 50 additional projects identified Represents 8% of planned 2008 capex CO pipelines 352 miles of existing line Significant expansion planne
Slide 29: CO2 Pipeline and Oil Recovery Stages
Co2 Pipeline Co2 Pipeline Original Oil in Place Recovered Original Oil in Place Recovered 12-15% Primary Recovery 12 - 15% Primary Recovery - 15% Primary Recovery 15% Primary Recovery 15-20% Secondary Recovery 15 - 20% Secondary Recovery - 20% Secondary Recovery 20% Secondary Recovery 4-11%
Slide 30: Camrick Area CO2 Tertiary Recovery
Actual vs. forecast oil production (BOPM) Overview Enhanced Oil Recovery (EOR) Camrick Area CO Tertiary Recovery NW Camrick Unit, Perryton Unit and Camrick Unit Reservoir Morrow Net acreage 15,200 OOIP (Mmbo) 125.6 Primary oil recovery (Mmbo) 16.6 Secondary oil recovery (Mmbo) 13.1 Estimated tertiar
Slide 31: CO2 Pipeline & Potential Tertiary Fields
Enhanced Oil Recovery (EOR) CO Pipeline & Potential Tertiary Fields Interstate Unit Booker Fields
Slide 32: Chaparral
Chaparral
Slide 33: Oklahoma EOR Potential
Enhanced Oil Recovery (EOR) Oklahoma EOR Potential U.S. Dept of Energy - Office of Fossil Energy (April 2005)
Slide 34: FY 2008 Production Forecast – Chaparral 2008 Guidance
FY 2008 Production Forecast 43 – 45 Bcfe Estimated Per Unit Costs Lease operating expense at $2.55 – 2.60/Mcfe General and administrative expense at $0.52 – 0.56/Mcfe Chaparral 2008 Guidance (Pre-merger)
Slide 35: Agenda
Agenda Transaction Chaparral Overview Chaparral Strategy and Project Review Review of Edge Petroleum Merger Financing
Slide 36: Edge Petroleum
S TX 81% PDP 49% PUD 23% Oil 29% Gas 71% Edge Petroleum High quality, concentrated, gas oriented asset base focused in: South Texas Southeast Texas Mississippi Interior Salt Basin Southeast New Mexico Fayetteville / Moorefield Shale Growth driven by drill-bit and select acquisitions strategy employi
Slide 37: Slide 37
Slide 38: 2007 Pro Forma Reserves and Production by Area
South Texas 91% South Texas 85% Mid-Continent 82% Mid-Continent 74% Mid-Continent 42% Mid-Continent 66% 2007 Pro Forma Reserves and Production by Area Edge Reserves Pro Forma Reserves Chaparral Reserves Edge Production Chaparral Production Pro Forma Production Mississippi & Other 4% Permian 5% Permi
Slide 39: Agenda
Agenda Transaction Chaparral Overview Chaparral Strategy and Project Review Review of Edge Petroleum Merger Financing
Slide 40: Merger Financing
Merger Financing New Credit Facility $825 million or $1.0 billion credit facility Additional hedges will determine final facility size Availability on the facility will be adequate to fund our combined drilling and acquisition needs New Series B Preferred Stock $150 private placement of preferred st