Breitburn Energy Partners LP — Presentation (May 2017)
163 slides from Breitburn Energy Partners LP's investor presentation, May 25, 2017
Slide 1: Preliminary Discussion Materials
CONFIDENTIAL Highly Confidential Subject to FRE 408 Subject to Express Confidentiality Agreement BREITBURN ENERGY PARTNERS LP PRELIMINARY DISCUSSION MATERIALS DECEMBER 6 2016 Exhibit 99.1
Slide 2: None of Breitburn, Lazard Frères & Co. LLC (“Lazard”) and Alvarez & Marsal North
CONFIDENTIAL None of Breitburn, Lazard Frères & Co. LLC (“Lazard”) and Alvarez & Marsal North America, LLC (“A&M”), and each of their subsidiaries, affiliates, officers, directors, shareholders, employees, consultants, advisors, agents and representatives of the foregoing (collectively, “Representat
Slide 3: Agenda
CONFIDENTIAL AGENDA 1. Company Introduction Hal Washburn 2. Operations Overview and Plan Mark Pease 3. G&A and District Expense Reduction Efforts Jim Jackson 4. Financial Projections Jim Jackson 5. Next Steps Discussion Tim Pohl
Slide 4: Company Introduction
CONFIDENTIAL COMPANY INTRODUCTION
Slide 5: Management – Ten Years of Continuity
CONFIDENTIAL pg. 5 MANAGEMENT – TEN YEARS OF CONTINUITY Halbert S. Washburn – Director and Chief Executive Officer Chief Executive Officer of Breitburn’s General Partner since April 2010 Served as Co-Chief Executive Officer and a director of Breitburn predecessor entities from May 1988 Current
Slide 6: Years of Operatorship
CONFIDENTIAL OVER 28 YEARS OF OPERATORSHIP pg. 6 • Predecessor founded in 1988; IPO in 2006 • Value created - and capital returned - for numerous owners across commodity cycles • Seasoned team, proven innovative solution-finding capability, rich corporate action history KEY MESSAGES • Multi-faceted
Slide 7: Strong History of Operating and Financial Performance
CONFIDENTIAL California Southeast Rockies Mid-Continent MI/IN/KY Ark-La-Tex Permian Basin 4.6 15.1 18.4 17.9 18.4 19.3 22.8 30.0 38.7 55.3 0 10 20 30 40 50 60 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 Mbo ep d Average Daily Reported Production pg. 7 STRONG HISTORY OF OPERATING AND FINANCIAL
Slide 8: Attractive Assets in Producing Areas
CONFIDENTIAL ATTRACTIVE ASSETS IN 7 PRODUCING AREAS pg. 8 ARK-LA-TEX 2015 Avg. Daily Production 10,022 Boe/d Est. Proved Reserves 46.9 MMboe SOUTHEAST 2015 Avg. Daily Production 5,585 Boe/d Est. Proved Reserves 20.4 MMboe MI/IN/KY 2015 Avg. Daily Production 8,468 Boe/d Total Proved Reserves 51.5 MMb
Slide 9: Extensive Capabilities; Broad and Deep Economic Opportunity Set
CONFIDENTIAL pg. 9 EXTENSIVE CAPABILITIES; BROAD AND DEEP ECONOMIC OPPORTUNITY SET Conventional and Unconventional Reservoirs • Shallow gas, natural water drive • Permian shale, tight gas Value via Drill-Bit • Horizontal drilling and completion • Infills, step-outs Secondary and Enhanced Oil Recover
Slide 10: Disciplined capital spending
CONFIDENTIAL As market conditions continually deteriorated over the last two years, the company has maintained disciplined capital spending programs. Budgeting decisions have been influenced by critical factors such as: liquidity conservation, dynamic project economics and preservation of vested cor
Slide 11: LOE reductions
CONFIDENTIAL Organizational structural changes placed the company’s best managers in a position to have maximum impact. The assets were broken into smaller divisions grouping together those with complimentary technical characteristics. Employees met the challenge of changing emphasis from intense ca
Slide 12: G&A reductions
CONFIDENTIAL Beginning in November 2014, Breitburn’s senior management team moved quickly to right-size the organization in light of the unprecedented deterioration of commodity prices and market conditions Instituted a hiring freeze on December 9, 2014 Achieved ~40% reduction in total G&A positio
Slide 13: District expenses
CONFIDENTIAL District expenses are operating costs incurred to manage or supervise the company’s operating assets such that wells, leases, or facilities benefit proportionately. In practice, the company’s technical personnel reporting up to, and including, divisional VPs, who are responsible for day
Slide 14: Accessing and returning capital
CONFIDENTIAL ACCESSING CAPITAL • Accessed $8bn+ of capital via multitude of sources: public and private equity, public and private preferred, public and private debt, at-the-market equity, equity issued as acquisition currency • Track record of innovative matching of assets with capital throughout p
Slide 15: Portfolio offers maximum value creation
CONFIDENTIAL pg. 15 PORTFOLIO OFFERS MAXIMUM VALUE CREATION AND MINIMAL INCREMENTAL CAPITAL EXPOSURE Accelerated Inventory Development Multiple Growth Avenues Embedded Funding Options Low-Risk Play Extension with Minimal Capital Exposure Bolt-on Acquisitions from Distressed Sellers Strategic Consoli
Slide 16: Operations Overview and Plan
CONFIDENTIAL OPERATIONS OVERVIEW AND PLAN
Slide 17: Maintain Strategic Focus
CONFIDENTIAL MAINTAIN STRATEGIC FOCUS pg. 17 • Organized by Division for operating efficiency – but Breitburn to the core • Aim for full resource value capture (have grown inventory through technical enhancement and/or step-out expansion in core fields since entering) • Continue to drive efficiencie
Slide 18: Division VI Permian-Eastern Midland Basin
CONFIDENTIAL DIVISION VI PERMIAN-EASTERN MIDLAND BASIN
Slide 19: Division VI Overview
CONFIDENTIAL DIVISION VI OVERVIEW • Spraberry Trend Acreage as of 9/30/16 – Total Acreage (including vertical/wellbore only & HZ rights): 24,670 gross / 21,580 net – Total HZ Acreage: 20,703 gross / 17,502 net • 6.3 MBoe/d of Q1 2016 net production – 401 gross producing wells • 2016 Capex: $3.3 MM –
Slide 20: Horizontal Midland Basin Development
CONFIDENTIAL 1) Includes Jo Mill Sand, Middle Spraberry, Wolfcamp D/Cline, and a second row of infill wells in the Wolfcamp A and the Lower Spraberry HORIZONTAL MIDLAND BASIN DEVELOPMENT Lower Spraberry Wolfcamp A Wolfcamp B Add. Potential Benches (1) Total Net Locations Operated 53 53 53 207 365 No
Slide 21: Industry Activity Around Breitburn Acreage
CONFIDENTIAL Operated Acreage Non-Operated Acreage INDUSTRY ACTIVITY AROUND BREITBURN ACREAGE Martin Howard Notes: Key horizontal wells; Lateral lengths are stimulated lengths. Lower Spraberry (28) Wolfcamp A (76) Wolfcamp B (20) November 11, 2016 Crownquest - Gratis 32-R 1HB Lateral Length: 9,953’
Slide 22: Primary Development Area Stratigraphy
CONFIDENTIAL U. Spraberry Shale Clear Fork L. Spraberry Shale Dean Wolfcamp A Wolfcamp B Wolfcamp C Cline L. Spraberry Sands M. Spraberry Shale U. Spraberry Sands PRIMARY DEVELOPMENT AREA STRATIGRAPHY System Series Formation San Andres, GlorietaGuad. Cisco Canyon Strawn Bend (Atoka) Woodford Kinderh
Slide 23: Development Plan Supported by Subsurface Model
CONFIDENTIAL DEVELOPMENT PLAN SUPPORTED BY SUBSURFACE MODEL Key Points Technical data includes: logs, cores and 2D seismic data ─ 590 wells with digital triple- combo data ─ Member of Core Lab’s Midland Basin consortium ─ Cored 800’ of section from Lower Spraberry into the Wolfcamp B in the Beall
Slide 24: Wellbore Diagram
CONFIDENTIAL Surface Casing: 13 3/8", 54.5#, K-55, BT&C Hole Size: 17 1/2" set @ 450' ( cement to surface ) 9 5/8" Stage tool @ 3000' Intermediate Casing: 9 5/8", 40#, HCK-55, BT&C set @ 6,150' , 0 degs (special drift to 8.75") Hole Size: 12 1/4"" to 6,150' MD (6,150' TVD) (base of Clearfork) Produc
Slide 25: Pad and Facilities Overview
CONFIDENTIAL Pad and Facilities Design PAD AND FACILITIES OVERVIEW Key Points Pad Design ─ Designed for 2 - 6 wells ─ 450’ by 400’ ─ 2 well facility shown ─ Pad cost: $85,000 Facilities Design ─ HP Separator ─ LP Separator ─ Heater Treater ─ 3x500 bbl oil tanks ─ 2x750 bbl water tanks ─ Facility
Slide 26: Frac Water Management Plan
CONFIDENTIAL FRAC WATER MANAGEMENT PLAN Key Points Frac Pit Water Storage ─ 2,200 Mbbls FW Pipeline Infrastructure ─ 7.4 miles buried 8” line ─ 30 MBWPD transfer capacity Frac Water Sources ─ Fresh water o BBEP:15-20 MBWPD o Non-op: 10-15 MBWPD ─ Other water o Recycled: ~10 MBWPD Water Requi
Slide 27: Salt Water Disposal System
CONFIDENTIAL SALT WATER DISPOSAL SYSTEM Key Points Current Salt Water Disposal System ─ SWD pipeline in place ─ 1 operated SWD well ─ 3 tie-ins to 3rd party systems ─ Capacity of 38 MBWPD 2017 Plans ─ Drill 2 additional SWD wells ─ Capacity increase ~35 MBWPD Lloyd SWD pg. 27
Slide 28: Horizontal Well Program
CONFIDENTIAL pg. 28 HORIZONTAL WELL PROGRAM PRIMARY DEVELOPMENT AREA Key Points Development ─ 189 gross operated locations (LS, WCA,WCB) ─ Six wells across section (880’ spacing) ─ Pad drill initially the Wolfcamp A & Lower Spraberry Land ─ Acreage 100% HBP’d ─ 18 drill ready locations ─ Obtaini
Slide 29: Eastern Midland Basin Summary Information
CONFIDENTIAL EASTERN MIDLAND BASIN pg. 29 SUMMARY INFORMATION Overview Operated Producing Wells (1) 355 Net Acreage Developed 11,001 3Q '16 Daily Production Undeveloped 6,501 Oil (bopd) 2,648 Total 17,502 Gas (mcfpd) 8,019 NGL (galpd) 70,594 Ownership Total (boepd) 5,665 Avg. W.I. 84.5% Avg.
Slide 30: Division V Enhanced Oil Recovery
CONFIDENTIAL DIVISION V ENHANCED OIL RECOVERY
Slide 31: Division V - EOR Overview
CONFIDENTIAL DIVISION V - EOR OVERVIEW Jay/LEC Unit – 0.30 HCPV Injected N2 flood began in 1981; 101 MMBBL tertiary recover to date Flexible OPEX program Robust PDNP Capital Program (RTP, RTI & CTI) Substantial drilling opportunities Postle Units – Range from 0.69-1.09 HCPV Injected CO
Slide 32: Postle Development Inventory
CONFIDENTIAL * Morrow Sands - Net Isopach Maps – ‘A’, ‘A1’, ‘A2’ ** - New ‘A’ Patterns Include Lease Line and Interior Patterns Flooded ‘A’ / Floodable ‘A’ / Developed (MM STB) (MM STB) (%) HMAU – 59.3 / 59.3 / 100 HMU – 70.9 / 85.3 / 83 PUMU – 44.2 / 44.2 / 100 WHMU – 112.7 / 125.7 / 90 Total – 287
Slide 33: Postle Historical & Projected Production
CONFIDENTIAL 100 1,000 10,000 100,000 G ro ss Dail y P ro d u cti o n ( B OPD ) Postle/NEHU Field Oil Production POSS PROB PUD PNP PDP Historic pg. 33 POSTLE HISTORICAL & PROJECTED PRODUCTION Start Waterflood Start CO2 flood – PUMU, HMAU, WHMU Start CO2 flood - HMU Unit OOIP, MMSTB Primary + Seconda
Slide 34: Greater Postle Field Summary Information
CONFIDENTIAL GREATER POSTLE FIELD pg. 34 SUMMARY INFORMATION Overview Operated Producing Wells (1) 248 Net Acreage Developed 32,094 3Q '16 Daily Production Undeveloped - Oil (bopd) 4,330 Total 32,094 Gas (mcfpd) 1,126 NGL (galpd) 38,711 Ownership Total (boepd) 5,440 Avg. W.I. 96.9% Avg. NRI
Slide 35: Jay Field – Inventory
CONFIDENTIAL Future Drill Wells (35) JAY FIELD –INVENTORY Fraction of Pay - High Reservoir Quality 2014-2015 Drill Wells (5) Well Spacing (Prod. + Inj.) Peak Development 100 acres/well Current Active 200 acres/well Future Plan 140 acres/well 3-P View 110 acres/well Immature Miscible Flood N2 Injecti
Slide 36: Jay Historical & Projected Production
CONFIDENTIAL 100 1,000 10,000 100,000 1,000,000 G ro ss D ai ly P ro d u ctio n ( B o p d ) Jay Field Oil Production POSS PROB PUD PNP PDP JAY HISTORICAL & PROJECTED PRODUCTION Unit OOIP, MMSTB Primary + Secondary Actuals and Forecast, MMBO Incremental Tertiary Actuals and Forecast, MMBO Jay/LEC 102
Slide 37: Greater Jay Field Summary Information
CONFIDENTIAL GREATER JAY FIELD pg. 37 SUMMARY INFORMATION Overview Operated Producing Wells (1) 47 Net Acreage Developed 13,871 3Q '16 Daily Production Undeveloped - Oil (bopd) 3,133 Total 13,871 Gas (mcfpd) 77 NGL (galpd) 13,987 Ownership Total (boepd) 3,479 Avg. W.I. 92.8% Avg. NRI 76.4% E
Slide 38: Division IV Ark-La-Tex
CONFIDENTIAL DIVISION IV ARK-LA-TEX
Slide 39: Division IV Overview
CONFIDENTIAL DIVISION IV OVERVIEW 116K gross, 73K net acres 2,024 Gross Producing wells (2105 Year End NSAI) Q1 2016 Net Production: 11,138 BOED (48% Liquids) 120 wells available for immediate reactivation with higher commodity prices yielding additional 200 BOPD Asset Mix: Low-decline oil a
Slide 40: Ark-La-Tex LOE
CONFIDENTIAL ARK-LA-TEX LOE pg. 40 Reduced total LOE by 52% Q1 2016 vs Q1 2015 Reduced Workover Activity Vendor Price Reductions Shut in Uneconomic Wells Cost Saving projects (Overton SWD) Grew Production by 12% Q1 2016 vs Q1 2015 Overton Program Reduced Unit LOE by $13.18/BOE (58%)
Slide 41: Overton Overview
CONFIDENTIAL AMI G R E E N B A Y 1 6 H E CH A RD 9 H H A R M O N -C A M E R O N 1 H C A M E R O N -H A R M O N 1 H G R IM E S 2 H D A V ID W IL S O N 1 1 H M C E LR O Y -S W A NN 2 H M C E LR O Y -S W A NN -M O O R E 2 H M C E LR O Y -S W A NN -M O O R E 1 H E CH A RD 7 H N E O 4 H W G U2 -C -L 1 H
Slide 42: Overton Cotton Valley Target Interval
CONFIDENTIAL pg. 42 Previous Overton Operators Targeted Taylor 4 BBEP’s Southern Acreage has limited Taylor 4 but thicker Taylor 3 BBEP Southern Overton wells Typically land in Taylor 3 Micro-seismic surveys and well performance indicate fracs are contacting all intervals in Southern Overton
Slide 43: East Texas Oil Field Overview
CONFIDENTIAL EAST TEXAS OIL FIELD OVERVIEW Discovered in 1930 Woodbine Sands at ~ 3500’ Original Oil in Place > 7 billion bbls Cumulative Production > 5.5 billion barrels Shallow base decline Low-cost field SWD gathering and reinjection system (ETSWD) Hundreds of low cost/low risk upli
Slide 44: Ark-La-Tex Summary Information
CONFIDENTIAL ARK-LA-TEX pg. 44 SUMMARY INFORMATION Overview Operated Producing Wells (1) 2,490 Net Acreage Developed 75,599 3Q '16 Daily Production Undeveloped 3,451 Oil (bopd) 3,448 Total 79,050 Gas (mcfpd) 34,310 NGL (galpd) 63,785 Ownership Total (boepd) 10,685 Avg. W.I. 75.1% Avg. NRI 58
Slide 45: Division II California, W. Permian
CONFIDENTIAL DIVISION II CALIFORNIA, W. PERMIAN
Slide 46: California
CONFIDENTIAL CALIFORNIA pg. 46 • Concentrated in large oil fields in the Los Angeles Basin and San Joaquin Valley – Company has long history in region with unique operational capabilities – Mature fields (some producing over 100 years) with low risk development opportunities – 2.5 billion Bbl OOIP,
Slide 47: Santa Fe Springs Overview
CONFIDENTIAL Highlights pg. 47 SANTA FE SPRINGS OVERVIEW • Field discovered in 1919; 2.0 BBbl OOIP • Peak production in 1920’s was 345,000 Bo/d • Cum oil production 640 MMBo (32%) • BBEP purchased from Texaco in 1999 for <$10mm; 1,400 Bo/d and 5.8 mmbo Reserves • 100% operated with 100% WI (~94% NRI
Slide 48: Santa Fe Springs Field Production History
CONFIDENTIAL pg. 48 SANTA FE SPRINGS FIELD PRODUCTION HISTORY Foix,Bell, Meyer Nordstrom,Buckbee,Clark-Hathaway,O’Connell Santa Fe, Bell100 Unitization Waterflood Meyer, Clark-Hathaway (1972) BBEP Purchased Field (1999)
Slide 49: Santa Fe Springs Productive Intervals
CONFIDENTIAL pg. 49 SANTA FE SPRINGS PRODUCTIVE INTERVAL(S) • Productive interval consists of 6000’ of massive channelized fan deposits and interbedded sand/shale sequences Upper M io ce n e P li o ce n e A B MEYER NORDSTROM O’CONNELL BELL HATHAWAY SANTA FE BUCKBEE - 10,000 - 2,000 - 8,000 - 6,000 -
Slide 50: Field Development Plan
CONFIDENTIAL FIELD DEVELOPMENT PLAN • Upgrade current Production Handling facilities to maximize throughput and reliability • Optimize well performance through surveillance, pumping diagnostics and lift optimization • Recomplete idle/underperforming wells targeting stratigraphically isolated increme
Slide 51: Belridge Producer Re-Frac Potential
CONFIDENTIAL BELRIDGE PRODUCER RE-FRAC POTENTIAL D-E D-A D-B D-C D-D D-F D-G D-G1 D-H C-8C Spud 5/15/2013 153’ HCFT By-passed Pay pg. 51
Slide 52: Belridge Drilling Potential
CONFIDENTIAL 0 20 40 60 80 100 120 140 160 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 Number of Wells Drilled 2013 BELRIDGE DRILLING POTENTIAL Belridge Surface Map 2013 Drilling EURs Mean EUR = 53 MBO 2014 Drilling EURs Mean EUR = 36 MBO Belridge Surface Map Drilled 2014 Remaining Locations EU
Slide 53: California Summary Information
CONFIDENTIAL CALIFORNIA pg. 53 SUMMARY INFORMATION Overview Operated Producing Wells (1) 538 Net Acreage Developed 3,216 3Q '16 Daily Production Undeveloped 41 Oil (bopd) 3,975 Total 3,257 Gas (mcfpd) 831 NGL (galpd) 69 Ownership Total (boepd) 4,115 Avg. W.I. 81.5% Avg. NRI 77.5% Estimated R
Slide 54: W Permian
CONFIDENTIAL W PERMIAN • 98,951 Gross, 63,872 net acres across Permian Basin as of 9/30/16 • Mature waterflood properties including E. Fuhrman, N. Cowden, Howard Glasscock, and Turner Gregory Fields and OBO interests in Wasson, Westbrook, and Vacuum • Prolific gas properties in the Pegasus, Waha, Co
Slide 55: M State Lease – Lea County, New Mexico
CONFIDENTIAL pg. 55 M STATE LEASE – LEA COUNTY, NEW MEXICO Key Points: • 3,000 acre JV with XTO in Lea Co. NM • BPO 100%/75% • APO 65%/56.875% • 180 continuous development • Next spud date 11/1/2016 • Historically Blinebry, Drinkard, Tubb • Recently discovered deeper potential Leasehold Map Acreage
Slide 56: M State Drilling Results
CONFIDENTIAL M STATE 18 DRILLING RESULTS • MSE technology applied to improve drilling efficiency, with great results • Cut 8 days or 40% off previous drilling performance • Results in better than 30% reduction in capital cost that leverages each additional location • Process and technology transfers
Slide 57: East Fuhrman – Glorietta Waterflood Expansion
CONFIDENTIAL pg. 57 EAST_FUHRMAN – GLORIETTA WATERFLOOD EXPANSION Phase 1A Phase 1B • Phase 1A – $3.3 MM – (2017) • 2 years to peak rate • 2 Injectors • 4 Recompletions/Workovers • Phase 1B – $11.6 MM • Assumes completion of Phase 1A • 2 years to peak rate • 5 Producers, • 4 Injectors • 4 Recompleti
Slide 58: West Permian Summary Information
CONFIDENTIAL WEST PERMIAN pg. 58 SUMMARY INFORMATION Overview Operated Producing Wells (1) 619 Net Acreage Developed 64,027 3Q '16 Daily Production Undeveloped 3,857 Oil (bopd) 2,666 Total 67,844 Gas (mcfpd) 8,600 NGL (galpd) 41,602 Ownership Total (boepd) 5,090 Avg. W.I. 84.3% Avg. NRI 64.6
Slide 59: Division I
CONFIDENTIAL DIVISION I
Slide 60: Michigan Overview
CONFIDENTIAL MICHIGAN OVERVIEW pg. 60 • Breitburn is the largest gas producer in Michigan and one of the top producers in the Antrim Shale as of 9/30/16 – Other Michigan reservoirs include: Praire du Chien, Richfield, Detroit River Zone III, and Niagaran pinnacle reefs – New Albany shale (IN/KY) • A
Slide 61: MI/IN/KY Summary Information
CONFIDENTIAL MI/IN/KY pg. 61 SUMMARY INFORMATION Overview Operated Producing Wells (1) 1,660 Net Acreage Developed 251,085 3Q '16 Daily Production Undeveloped 12,687 Oil (bopd) 797 Total 263,772 Gas (mcfpd) 41,956 NGL (galpd) 4,894 Ownership Total (boepd) 7,906 Avg. W.I. 65.0% Avg. NRI 52.3%
Slide 62: Rockies Overview
CONFIDENTIAL ROCKIES OVERVIEW pg. 62 • Key basins include – Evanston and Green River Basins in southwestern Wyoming (primarily natural gas) – Big Horn and Wind River basins in central Wyoming (primarily oil) • Acreage: 207,778 (gross) / 112,865 (net) as of 9/30/16 • Interests in 970 productive wells
Slide 63: Wyoming Waterfloods
CONFIDENTIAL WYOMING WATERFLOODS pg. 63 SW BIGHORN BASIN OIL FIELDS WATERFLOOD PILOT WF CANDIDATE WF CANDIDATE Ferguson Ranch Field • Two active injectors • Waterflood unit in place • Opportunity to expand to full field flood Hunt Field • Not unitized • Offset operator must be addressed Sheep Point
Slide 64: Rockies Summary Information
CONFIDENTIAL ROCKIES pg. 64 SUMMARY INFORMATION Overview Operated Producing Wells (1) 540 Net Acreage Developed 101,452 3Q '16 Daily Production Undeveloped 8,967 Oil (bopd) 2,771 Total 110,419 Gas (mcfpd) 17,079 NGL (galpd) 1,936 Ownership Total (boepd) 5,664 Avg. W.I. 54.2% Avg. NRI 44.2% E
Slide 65: SW Florida Summary Information
CONFIDENTIAL SW FLORIDA pg. 65 SUMMARY INFORMATION Overview Operated Producing Wells (1) 17 Net Acreage Developed 33,322 3Q '16 Daily Production Undeveloped 3,694 Oil (bopd) 1,079 Total 37,016 Gas (mcfpd) - NGL (galpd) - Ownership Total (boepd) 1,079 Avg. W.I. 100.0% Avg. NRI 83.4% Estimated
Slide 66: G&A and District Expense Reduction Efforts
CONFIDENTIAL G&A AND DISTRICT EXPENSE REDUCTION EFFORTS
Slide 67: G&A reductions
CONFIDENTIAL Beginning in November 2014, Breitburn’s senior management team moved quickly to right-size the organization in light of the unprecedented deterioration of commodity prices and market conditions Instituted a hiring freeze on December 9, 2014 Achieved ~40% reduction in total G&A positio
Slide 68: G&A Position and Cost Reductions
CONFIDENTIAL G&A Position Reductions Division 4Q 2014 Positions Net Reductions 4Q 2015 Positions Net Reductions 2Q 2016 Positions Total Net Reductions CEO 19 (6) 13 (4) 9 (10) CAO 98 (23) 75 (13) 62 (36) CFO 129 (12) 117 (20) 97 (32) COO 40 (9) 31 (10) 21 (19) Subtotal 286 (50) 236 (47) 189 (97) G&A
Slide 69: Current G&A Expense Profile
CONFIDENTIAL pg. 69 CURRENT G&A EXPENSE PROFILE Right-sized G&A structure supports an asset base consisting of producing and non-producing oil, NGL and natural gas reserves located across 12 states • Michigan, Indiana, Kentucky, Arkansas, Louisiana, Texas, New Mexico, Wyoming, Colorado, Florida, Al
Slide 70: 2017 G&A initiatives
CONFIDENTIAL With continued efforts toward driving down administrative costs, management is targeting 2017 G&A costs to be lower than 2016 run-rate Initiatives underway have and will continue to result in run-rate savings, further driving down G&A costs • Reject unfavorable leases - Relocate Housto
Slide 71: District expenses
CONFIDENTIAL District expenses are operating costs incurred to manage or supervise the company’s operating assets such that wells, leases, or facilities benefit proportionately. In practice, the company’s technical personnel reporting up to, and including, divisional VPs, who are responsible for day
Slide 72: District Position Reductions
CONFIDENTIAL District Position Reductions Division 4Q 2014 Positions Net Reductions 4Q 2015 Positions Net Reductions 2Q 2016 Positions Total Net Reductions CEO - - - - - - CAO - - - - - - CFO - - - - - - COO 182 (20) 162 (29) 133 (49) Subtotal 182 (20) 162 (29) 133 (49) District Headcount % Change (
Slide 73: District Expense Initiatives for 2017
CONFIDENTIAL Current expense reduction initiatives offset the bulk of forecasted increases in 2017 District Expense budget Initiatives underway have resulted in run-rate savings, driving down District Non-Payroll costs • Reject unfavorable leases - Relocate Houston office from 5HC to Rosetta - Rej
Slide 74: Preliminary Discussion Materials December 21, 2016
CONFIDENTIAL PRELIMINARY DISCUSSION MATERIALS BREITBURN ENERGY PARTNERS LP DECEMBER 21, 2016 Highly Confidential Subject to FRE 408 Subject to Express Confidentiality Agreement
Slide 75: None of Breitburn, Lazard Frères & Co. LLC (“Lazard”) and Alvarez & Marsal North
CONFIDENTIAL None of Breitburn, Lazard Frères & Co. LLC (“Lazard”) and Alvarez & Marsal North America, LLC (“A&M”), and each of their subsidiaries, affiliates, officers, directors, shareholders, employees, consultants, advisors, agents and representatives of the foregoing (collectively, “Representat
Slide 76: Overview
CONFIDENTIAL OVERVIEW Agenda Introductions Overview • BBEP Asset Base • Operational Management Organization • Portfolio Modeling – Strategic to Tactical • Cost Control Performance • Capital Investment Plan Divisional Reviews • Division VI – Permian Eastern Midland Basin • Division V – Enhanced
Slide 77: Attractive Assets in Producing Areas
CONFIDENTIAL ATTRACTIVE ASSETS IN 7 PRODUCING AREAS ARK-LA-TEX 2015 Avg. Daily Production 10,022 Boe/d Est. Proved Reserves 46.9 MMboe SOUTHEAST 2015 Avg. Daily Production 5,585 Boe/d Est. Proved Reserves 20.4 MMboe MI/IN/KY 2015 Avg. Daily Production 8,468 Boe/d Total Proved Reserves 51.5 MMboe MID
Slide 78: Extensive Capabilities; Broad and Deep Economic Opportunity Set
CONFIDENTIAL EXTENSIVE CAPABILITIES; BROAD AND DEEP ECONOMIC OPPORTUNITY SET Conventional and Unconventional Reservoirs • Shallow gas, natural water drive • Permian shale, tight gas Value via Drill-Bit • Horizontal drilling and completion • Infills, step-outs Secondary and Enhanced Oil Recovery Prof
Slide 79: Portfolio Management
CONFIDENTIAL PORTFOLIO MANAGEMENT • What is Portfolio Management? – A strategic planning process that efficiently models the impact of resource allocation on corporate performance – A methodology to compare the relative attractiveness and trade-offs of alternative investment scenarios • How do we us
Slide 80: Possible Opportunities
CONFIDENTIAL POSSIBLE OPPORTUNITIES • BBEP has a sizeable inventory of identified opportunities • Projects have been matured to varying states of readiness • Portfolio exhibits balance between oil and gas investments pg. 80 PROJECT TYPE DIVISION 1 DIVISION 2 DIVISION 4 DIVISION 5 DIVISION 6 Total CO
Slide 81: Disciplined capital spending
CONFIDENTIAL As market conditions continually deteriorated over the last two years, the company has maintained disciplined capital spending programs. Budgeting decisions have been influenced by critical factors such as: liquidity conservation, dynamic project economics and preservation of vested cor
Slide 82: LOE reductions
CONFIDENTIAL Organizational structural changes placed the company’s best managers in a position to have maximum impact. The assets were broken into smaller divisions grouping together those with complimentary technical characteristics. Employees met the challenge of changing emphasis from intense ca
Slide 83: Division VI Permian-Eastern Midland Basin
CONFIDENTIAL DIVISION VI PERMIAN-EASTERN MIDLAND BASIN
Slide 84: Division VI Overview
CONFIDENTIAL DIVISION VI OVERVIEW • Spraberry Trend Acreage as of 9/30/16 – Total Acreage (including vertical/wellbore only & HZ rights): 24,670 gross / 21,580 net – Total HZ Acreage: 20,703 gross / 17,502 net • 6.3 MBoe/d of Q1 2016 net production – 401 gross producing wells • 2016 Capex: $3.3 MM –
Slide 85: Primary Development Area Stratigraphy
CONFIDENTIAL U. Spraberry Shale M. Spraberry Shale Clear Fork L. Spraberry Shale Dean Wolfcamp A Wolfcamp B Wolfcamp C Cline Jo Mill Sand U. Spraberry Sands PRIMARY DEVELOPMENT AREA STRATIGRAPHY System Series Formation San Andres, GlorietaGuad. Cisco Canyon Strawn Bend (Atoka) Woodford Kinderhook Mi
Slide 86: Horizontal Midland Basin Development
CONFIDENTIAL 1) Includes Jo Mill Sand, Middle Spraberry, Wolfcamp D/Cline, and a second row of infill wells in the Wolfcamp A and the Lower Spraberry HORIZONTAL MIDLAND BASIN DEVELOPMENT Lower Spraberry Wolfcamp A Wolfcamp B Add. Potential Benches (1) Total Net Locations Operated 53 53 53 207 365 No
Slide 87: Development Plan Supported by Subsurface Model
CONFIDENTIAL DEVELOPMENT PLAN SUPPORTED BY SUBSURFACE MODEL Key Points Technical data includes: logs, cores and 2D seismic data ─ 590 wells with digital triple- combo data ─ Member of Core Lab’s Midland Basin consortium ─ Cored 800’ of section from Lower Spraberry into the Wolfcamp B in the Beall
Slide 88: W-E Stratigraphic Cross-Section
CONFIDENTIAL Key Points Reservoirs are present across acreage ─ Lower Spraberry ─ Wolfcamp A ─ Wolfcamp B Thickness and stratigraphic position of carbonate beds vary, present in other areas that are being developed W-E STRATIGRAPHIC CROSS-SECTION DATUM: TOP OF DEAN FM GR RT PHIE West East Sw GR
Slide 89: Industry Activity Around Breitburn Acreage
CONFIDENTIAL INDUSTRY ACTIVITY AROUND BREITBURN ACREAGE Martin Howard Crownquest - Gratis 32-R 1HB Lateral Length: 9,953’ IP/IP30 (Boe/d): 1,343/1,063 Callon– Garrett Unit 37-48 3SH Lateral Length: 6,901’ IP/IP30 (Boe/d): 882/682 Surge - Elrod-Antell Unit A 11-02 4SH Lateral Length: 6,676‘ IP/IP30 (
Slide 90: SM Energy
CONFIDENTIAL SM ENERGY INVESTOR PRESENTATION DECEMBER 7, 2016 pg. 90
Slide 91: Diamondback
CONFIDENTIAL DIAMONDBACK INVESTOR PRESENTATION NOVEMBER 2016 pg. 91
Slide 92: Callon Petroleum
CONFIDENTIAL CALLON PETROLEUM INVESTOR PRESENTATION NOVEMBER 2, 2016 pg. 92
Slide 93: Wellbore Diagram
CONFIDENTIAL Surface Casing: 13 3/8", 54.5#, K-55, BT&C Hole Size: 17 1/2" set @ 450' ( cement to surface ) 9 5/8" Stage tool @ 3000' Intermediate Casing: 9 5/8", 40#, HCK-55, BT&C set @ 6,150' , 0 degs (special drift to 8.75") Hole Size: 12 1/4"" to 6,150' MD (6,150' TVD) (base of Clearfork) Produc
Slide 94: Central Production Facility
CONFIDENTIAL CENTRAL PRODUCTION FACILITY Key Points Design ─ 36 wells per CPF ─ individual well test separators ─ two 18 well systems w/separate - oil processing - electrical transmission ─ shared SWD facilities ─ 450’ by 400’ location size Benefits ─ ~50% reduction in capital costs ─ lower oper
Slide 95: Frac Water Management Plan
CONFIDENTIAL FRAC WATER MANAGEMENT PLAN Key Points Frac Pit Water Storage ─ 2,200 Mbbls FW Pipeline Infrastructure ─ 7.4 miles buried 8” line ─ 30 MBWPD transfer capacity Frac Water Sources ─ Fresh water o BBEP:15-20 MBWPD o Non-op: 10-15 MBWPD ─ Other water o ~10 MBWPD Water Requirements ─
Slide 96: Salt Water Disposal System
CONFIDENTIAL SALT WATER DISPOSAL SYSTEM Key Points Current Salt Water Disposal System ─ SWD pipeline in place ─ 1 operated SWD well ─ 3 tie-ins to 3rd party systems ─ Capacity of 38 MBWPD 2017 Plans ─ Drill 2 additional SWD wells ─ Capacity increase ~35 MBWPD Lloyd SWD pg. 96
Slide 97: Lease Operating Expense
CONFIDENTIAL Key Points Lease operating expenses based on extensive experience operating across the basin Fixed & Variable LOE cost model Produced water disposal is the primary early LOE cost driver Plan to dispose of produced water in operated SWD wells Artificial lift method will be 2 re
Slide 98: Horizontal Well Program
CONFIDENTIAL HORIZONTAL WELL PROGRAM PRIMARY DEVELOPMENT AREA Key Points Development ─ 3 well pad drilling ─ Six wells across section (880’ spacing) ─ 180 base operated locations (LS, WCA,WCB) ─ 236 upside operated locations (WCA,LS, Jo Mill, MS, Cline) Land ─ Acreage 100% HBP’d ─ 18 drill ready
Slide 99: Division V Enhanced Oil Recovery
CONFIDENTIAL DIVISION V ENHANCED OIL RECOVERY
Slide 100: Division V - EOR Overview
CONFIDENTIAL DIVISION V - EOR OVERVIEW Jay/LEC Unit – 0.30 HCPV Injected N2 flood began in 1981; 101 MMBBL tertiary recover to date Flexible OPEX program Robust PDNP Capital Program (RTP, RTI & CTI) Substantial drilling opportunities Postle Units – Range from 0.69-1.09 HCPV Injected CO
Slide 101: CO2 Delivery Infrastructure
CONFIDENTIAL CO2 DELIVERY INFRASTRUCTURE pg. 101 CO2 Sources ►Libby Ranch (Reliant) ►Bravo Dome (Exxon) ►Team CO2 (Whiting) Midstream Facilities ►Libby Ranch Compression ►Libby Ranch PL Lateral ►Transpetco Pipeline ►NE Hardesty PL Lateral Oil Field ►Postle Complex (5 Units) ►NE Hardesty Unit ►Dry Tr
Slide 102: Postle Development Inventory
CONFIDENTIAL * Morrow Sands - Net Isopach Maps – ‘A’, ‘A1’, ‘A2’ ** - New ‘A’ Patterns Include Lease Line and Interior Patterns Flooded ‘A’ / Floodable ‘A’ / Developed (MM STB) (MM STB) (%) HMAU – 59.3 / 59.3 / 100 HMU – 70.9 / 85.3 / 83 PUMU – 44.2 / 44.2 / 100 WHMU – 112.7 / 125.7 / 90 Total – 287
Slide 103: Postle Historical & Projected Production
CONFIDENTIAL 100 1,000 10,000 100,000 G ro ss Dail y P ro d u cti o n ( B OPD ) Postle/NEHU Field Oil Production POSS PROB PUD PNP PDP Historic POSTLE HISTORICAL & PROJECTED PRODUCTION Start Waterflood Start CO2 flood – PUMU, HMAU, WHMU Start CO2 flood - HMU Unit OOIP, MMSTB Primary + Secondary Actu
Slide 104: CO2 EOR PUD Development Methodology
CONFIDENTIAL 1) Dimensionless Typecurve closely fits with Unit where majority of PUDs are located CO2 EOR PUD DEVELOPMENT METHODOLOGY 2) Determine by statistics the likely processing rate of PUDs, again by analog 3) Use geologic parameters to determine OOIPs of PUD pattern areas, allowing us to scal
Slide 105: Proof of Concept – A1/A2 Development
CONFIDENTIAL • In the west end of WHMU, the primary ‘A’ sand doesn’t exist, and the A1/A2 has been developed instead • Variability in tertiary RF% stems from pattern configuration and centrally located injection well PROOF OF CONCEPT – A1/A2 DEVELOPMENT Pattern Tertiary RF% CO2 Start WHMU 216 0.25 0
Slide 106: Jay Field – Location and Inventory
CONFIDENTIAL Future Drill Wells (35) JAY FIELD – LOCATION AND INVENTORY Fraction of Pay - High Reservoir Quality 2014-2015 Drill Wells (5) Future Opportunities PNP PUD PRB POS Wells Wells Wells Wells 10 35 16 0 Well Spacing (Prod. + Inj.) Peak Development 100 acres/well Current Active 200 acres/well
Slide 107: Recovery Profile by Pattern
CONFIDENTIAL RECOVERY PROFILE BY PATTERN Inactive Active – Cum. D&C 2A1AB 4B • Four of the 9 patterns performed below average • Three Patterns have a rounded-curve suggesting gradual decline in production rate • Pattern 1A • Pattern 1B • Pattern 2A • One of these 4 Patterns has a sharp bend in curve
Slide 108: 2627282930 36 30 31 12 13 24 39 40 10 11 12 17 18
CONFIDENTIAL 25 36 2627282930 31 32 33 34 35 1 10 11 2 21 22 3 25 34 35 36 30 31 12 13 24 39 40 10 11 12 17 18 19 2 20 21 22 23 24 2930 3132 4 40 41 42 43 56 7 8 9 2829 32 33 34 35 36 5N 29W 6N 29W 36-2 36-1 31-5 25-16 26-7 36-5 36-6 36-9 25-13 26-15 35-1 36-3 35-4 31-5ST 36-14 32-2 33-4B 30-4B 1 31
Slide 109: Reservoir Quality & Recovery Factor
CONFIDENTIAL 20% 25% 30% 35% 40% 45% 50% 55% 60% 50 100 150 200 250 300 350 400 Pre-Dev RF Total Well Spacing (Acres/Well.) Jay/LEC Unit 2016 (Pre-Development) RESERVOIR QUALITY & RECOVERY FACTOR 1AB 2A 2B 3A 3B 4A 4B 5AB 21,627 10,141 17,502 35,584 58,358 Recovered Remaining Recovered Remaining Rec
Slide 110: Jay Historical & Projected Production
CONFIDENTIAL 100 1,000 10,000 100,000 1,000,000 G ro ss D ai ly P ro d u ctio n ( B o p d ) Jay Field Oil Production POSS PROB PUD PNP PDP JAY HISTORICAL & PROJECTED PRODUCTION Unit OOIP, MMSTB Primary + Secondary Actuals and Forecast, MMBO Incremental Tertiary Actuals and Forecast, MMBO Jay/LEC 102
Slide 111: Division IV Ark-La-Tex
CONFIDENTIAL DIVISION IV ARK-LA-TEX
Slide 112: Division IV Overview
CONFIDENTIAL DIVISION IV OVERVIEW 116K gross, 73K net acres 2,024 Gross Prod wells (Year-end NSAI) 2016 Forecasted Net Production: 10,814 BOED or 9% above Budget 2016 Forecasted LOE: 39.7 MM$ or 39% below Budget 120 wells available for immediate reactivation with higher commodity prices yiel
Slide 113: Ark-La-Tex LOE
CONFIDENTIAL ARK-LA-TEX LOE Reduced total LOE by 52% Q1 2016 vs Q1 2015 Reduced Workover Activity Vendor Price Reductions Shut in Uneconomic Wells Cost Saving projects (Overton SWD) Grew Production by 12% Q1 2016 vs Q1 2015 Overton Program Reduced Unit LOE by $13.18/BOE (58%) Sourc
Slide 114: Overton Overview
CONFIDENTIAL AMI G R E E N B A Y 1 6 H E CH A RD 9 H H A R M O N -C A M E R O N 1 H C A M E R O N -H A R M O N 1 H G R IM E S 2 H D A V ID W IL S O N 1 1 H M C E LR O Y -S W A NN 2 H M C E LR O Y -S W A NN -M O O R E 2 H M C E LR O Y -S W A NN -M O O R E 1 H E CH A RD 7 H N E O 4 H W G U2 -C -L 1 H
Slide 115: Overton Cotton Valley Target Interval
CONFIDENTIAL Previous Overton Operators Targeted Taylor 4 BBEP’s Southern Acreage has limited Taylor 4 but thicker Taylor 3 BBEP Southern Overton wells Typically land in Taylor 3 Micro-seismic surveys and well performance indicate fracs are contacting all intervals in Southern Overton Pote
Slide 116: Overton Cotton Valley Performance
CONFIDENTIAL OVERTON COTTON VALLEY PERFORMANCE Improved Condensate Yields on Southern acreage Initial Yields Exceeding 50 BBL/MMCF on some wells Significantly enhances economics May 2014 Gross Production was 4.7 MMcf/d & 37 BCPD Jan 2016 Gross Production exceeded 58 MMcf/d and 1500 BCPD Gr
Slide 117: Hot Link - Horizontal Cotton Valley
CONFIDENTIAL Development Pace o 2017: Prove Concept • D&C 2 Wells and monitor production o 2018-2021: Continuous Rigline • 8 Wells/Rig/Year HOT LINK - HORIZONTAL COTTON VALLEY Project Development Profile # of Locations Capex ($M) Net EUR (MBOE) Development Cost ($/BOE) 2017 D&C Plan 2 $10,878 1,902
Slide 118: East Texas Oil Field Overview
CONFIDENTIAL EAST TEXAS OIL FIELD OVERVIEW Discovered in 1930 Woodbine Sands at ~ 3500’ Original Oil in Place > 7 billion bbls Cumulative Production > 5.5 billion barrels Shallow base decline Low-cost field SWD gathering and reinjection system (ETSWD) Hundreds of low cost/low risk upli
Slide 119: East Texas Oil Field Opportunities
CONFIDENTIAL EAST TEXAS OIL FIELD OPPORTUNITIES Modest development capital program maintains stable production rate 997 ESP Installations and RTP Uplift Projects 50 Deepenings and Recompletions Future Opportunities (2017 and Beyond) pg. 119
Slide 120: Shongaloo Lower Haynesville Infill Potential
CONFIDENTIAL SHONGALOO LOWER HAYNESVILLE INFILL POTENTIAL Haynesville Sands Type Log • Gross/Net Acreage: 8525/6575 acres – Located on Louisiana/Arkansas State Line • WI/NRI: 88/68% • Q1 2016 Net Production: 746 BOED (33% Liquids) • Produces Primarily from the Haynesville Sand • Current spacing >70
Slide 121: Division II California, W. Permian
CONFIDENTIAL DIVISION II CALIFORNIA, W. PERMIAN
Slide 122: California
CONFIDENTIAL CALIFORNIA • Concentrated in large oil fields in the Los Angeles Basin and San Joaquin Valley – Company has long history in region with unique operational capabilities – Mature fields (some producing over 100 years) with low risk development opportunities – 2.5 billion Bbl OOIP, 1.5 bil
Slide 123: Santa Fe Springs Overview
CONFIDENTIAL Highlights SANTA FE SPRINGS OVERVIEW • Field discovered in 1919; 2.0 BBbl OOIP • Peak production in 1920’s was 345,000 Bo/d • Cum oil production 640 MMBo (32%) • BBEP purchased from Texaco in 1999 for <$10mm; 1,400 Bo/d and 5.8 mmbo Reserves • 100% operated with 100% WI (~94% NRI) in th
Slide 124: Santa Fe Springs Field Production History
CONFIDENTIAL SANTA FE SPRINGS FIELD PRODUCTION HISTORY Foix,Bell, Meyer Nordstrom,Buckbee,Clark-Hathaway,O’Connell Santa Fe, Bell100 Unitization Waterflood Meyer, Clark-Hathaway (1972) BBEP Purchased Field (1999) pg. 124
Slide 125: Santa Fe Springs Productive Intervals
CONFIDENTIAL SANTA FE SPRINGS PRODUCTIVE INTERVAL(S) • Productive interval consists of 6000’ of massive channelized fan deposits and interbedded sand/shale sequences Upper M io ce n e P li o ce n e A B MEYER NORDSTROM O’CONNELL BELL HATHAWAY SANTA FE BUCKBEE - 10,000 - 2,000 - 8,000 - 6,000 - 4,000
Slide 126: Field Development Plan
CONFIDENTIAL FIELD DEVELOPMENT PLAN • Upgrade current Production Handling facilities to maximize throughput and reliability • Optimize well performance through surveillance, pumping diagnostics and lift optimization • Recomplete idle/underperforming wells targeting stratigraphically isolated increme
Slide 127: SFS Additional Drilling Opportunities
CONFIDENTIAL SFS ADDITIONAL DRILLING OPPORTUNITIES HATHAWAY 200 & NORDSTROM EXAMPLE Hathaway 200 (Green structural high) (Red Circles are other potential drill locations) Hathaway 200 Nordstrom Drilling and Completion ($M) 2,100 150 Risked 30 Day IP (BOPD) 81 63 Volumetric Reserve Potential 860 MBO
Slide 128: Belridge
CONFIDENTIAL Belridge BELRIDGE Key UpsideDaily Production (Mboe/d) Asset Highlights • Current Diatomite Gross Production: 800 BOPD, 800 Mcf/d, 16500 BWPD • 114 Active Diatomite Production Wells, 79 Active Water Injection Completions • 320 Acre Lease (100% BBEP WI, 83% Net) Operated by BBEP • 26 Re-F
Slide 129: Belridge Producer Re-Frac Potential
CONFIDENTIAL BELRIDGE PRODUCER RE-FRAC POTENTIAL D-E D-A D-B D-C D-D D-F D-G D-G1 D-H C-8C Spud 5/15/2013 By-passed Pay Re-Frac Reserves and Economics Cost: $175,000 per well 20 MBO Gross Reserves per well pg. 129
Slide 130: Belridge Drilling Potential
CONFIDENTIAL Belridge Diatomite Oil Isopach Current Spacing Remaining Locations BELRIDGE DRILLING POTENTIAL 0 20 40 60 80 100 120 140 160 180 200 1 6 3 1 2 5 1 8 7 2 4 9 3 1 1 3 7 3 4 3 5 4 9 7 5 5 9 6 2 1 6 8 3 7 4 5 8 0 7 8 6 9 9 3 1 9 9 3 1 0 5 5 1 1 1 7 Type Curve Rate Profile G ro ss B OP D Day
Slide 131: LA Basin Fields Capital Opportunities
CONFIDENTIAL 0 20000 40000 60000 80000 100000 120000 140000 160000 180000 200000 1 3 5 7 9 11 13 15 17 19 21 Anaheim 2 and 3 Upside EAST COYOTE Sawtelle Three BBEP Wells Remain to Complete Downhole Pump Conversions Eliminating Kobe Hydraulic Pumps with Significant LOE Savings Resulting 2015 2016 $/M
Slide 132: W Permian
CONFIDENTIAL W PERMIAN • 98,951 Gross, 63,872 net acres across Permian Basin as of 9/30/16 • Mature waterflood properties including E. Fuhrman, N. Cowden, Howard Glasscock, and Turner Gregory Fields and OBO interests in Wasson, Westbrook, and Vacuum • Prolific gas properties in the Pegasus, Waha, Co
Slide 133: M State Lease – Lea County, New Mexico
CONFIDENTIAL M STATE LEASE – LEA COUNTY, NEW MEXICO Key Points: • 3,000 acre JV with XTO in Lea Co. NM • 180 continuous development • Next spud date 11/1/2016 • Historically Blinebry, Drinkard, Tubb • Additional pay opportunities to exploit Leasehold Map Acreage Position Field Production pg. 133
Slide 134: M State Drilling Results
CONFIDENTIAL M STATE 18 DRILLING RESULTS • MSE technology applied to improve drilling efficiency, with great results • Cut 8 days or 40% off previous drilling performance • Results in better than 30% reduction in capital cost that leverages each additional location • Process and technology transfers
Slide 135: East Fuhrman – Glorietta Waterflood Expansion
CONFIDENTIAL EAST_FUHRMAN – GLORIETTA WATERFLOOD EXPANSION Phase 1A Phase 1B • Phase 1A – $3.3 MM – (2017) • 2 years to peak rate • 2 Injectors • 4 Recompletions/Workovers • Phase 1B – $11.6 MM • Assumes completion of Phase 1A • 2 years to peak rate • 5 Producers, • 4 Injectors • 4 Recompletions/Wor
Slide 136: Division I
CONFIDENTIAL DIVISION I
Slide 137: Michigan Overview
CONFIDENTIAL MICHIGAN OVERVIEW • Breitburn is the largest gas producer in Michigan and one of the top producers in the Antrim Shale as of 9/30/16 – Other Michigan reservoirs include: Praire du Chien, Richfield, Detroit River Zone III, and Niagaran pinnacle reefs – New Albany shale (IN/KY) • Acreage:
Slide 138: Rockies Overview
CONFIDENTIAL ROCKIES OVERVIEW • Key basins include – Evanston and Green River Basins in southwestern Wyoming (primarily natural gas) – Big Horn and Wind River basins in central Wyoming (primarily oil) • Acreage: 207,778 (gross) / 112,865 (net) as of 9/30/16 • Interests in 970 productive wells (67% o
Slide 139: Wyoming Waterfloods
CONFIDENTIAL WYOMING WATERFLOODS SW BIGHORN BASIN OIL FIELDS WATERFLOOD PILOT WF CANDIDATE WF CANDIDATE Ferguson Ranch Field • Two active injectors • Waterflood unit in place • Opportunity to expand to full field flood Hunt Field • Not unitized • Offset operator must be addressed Sheep Point Field •
Slide 140: Supplemental Materials Provided Separately
CONFIDENTIAL SUPPLEMENTAL MATERIALS PROVIDED SEPARATELY
Slide 141: Project: Belridge Diatomite
Project: Belridge Diatomite Target: Opal 'A' Diatomite Division: 1 Type: Drilling ‐ Vertical COO/S: 100% Vital Statistics Identified Inventory: 56 WI: 100.00 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 10 NRI: 83.00 % BPO Gross CAPEX/Well: 650 $M % APO Gross CAPEX/Land‐Facility
Slide 142: Project: ETOF Deepening
Project: ETOF Deepening Target: Woodbine Division: 4 Type: Drill ‐ Deepen COO/S: Vital Statistics Identified Inventory (OP/OBO): 60 WI: 100.00 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 10 NRI: 87.50 % BPO Gross CAPEX/Well: 125 $M % APO Gross CAPEX/Facility: 0 $M* * Allocated
Slide 143: Project: ETOF RTP
Project: ETOF RTP Target: Woodbine Division: 4 Type: Recomplete ‐ Return to Production COO/S: Vital Statistics Identified Inventory (OP/OBO): 150 WI: 100.00 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 30 NRI: 87.50 % BPO Gross CAPEX/Well: 70 $M % APO Gross CAPEX/Facility: 0 $M*
Slide 144: Project: Jay Vertical (No Facility Req.)
Project: Jay Vertical (No Facility Req.) Target: Smackover Division: 5 Type: Drilling ‐ Vertical COO/S: Vital Statistics Identified Inventory (OP/OBO): 12 WI: 93.16 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 7 NRI: 76.31 % BPO Gross CAPEX/Well: 4,135 $M % APO Gross CAPEX/Facil
Slide 145: Project: Jay Vertical (Facility Req.)
Project: Jay Vertical (Facility Req.) Target: Smackover Division: 5 Type: Drilling ‐ Vertical COO/S: Vital Statistics Identified Inventory (OP/OBO): 23 WI: 93.16 % BPO Pot. Unidentified Inventory: 15 % APO Max Projects per Year: 7 NRI: 76.31 % BPO Gross CAPEX/Well: 4,135 $M % APO Gross CAPEX/Facilit
Slide 146: Project: MI Antrim
Project: MI Antrim (Type Curve is 10 Well Package) Target: Antrim (Lachine / Norwood) Division: 1 Type: Drilling ‐ Vertical COO/S: Vital Statistics Identified Inventory (OP/OBO): 36 WI: 100.00 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 6 NRI: 87.50 % BPO Gross CAPEX/Well: 2,10
Slide 147: Project: MI Collingwood-Utica
Project: MI Collingwood‐Utica Target: Collingwood / Utica Division: 1 Type: Drilling ‐ Horizontal COO/S: Vital Statistics Identified Inventory (OP/OBO): 141 WI: 94.73 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 25 NRI: 82.12 % BPO Gross CAPEX/Well: 5,610 $M % APO Gross CAPEX/Fa
Slide 148: Project: M State Abo/Drinkard
Project: M State Abo/Drinkard Target: Abo/Drinkard/Blinebry Division: 2 Type: Drilling ‐ Vertical Vital Statistics Identified Inventory: 23 WI: 100.00 % BPO Pot. Unidentified Inventory: 0 65.00 % APO Max Projects per Year: 10 NRI: 75.00 % BPO Gross CAPEX/Well: 1,900 $M 56.88 % APO Gross CAPEX/Land‐F
Slide 149: Project: Permian-EMB Jo Mill Hz
Project: Permian‐EMB Jo Mill Hz (8,400') Target: Jo Mill (Spby) Division: 6 Type: Drilling ‐ Horizontal COO/S: 38% Vital Statistics Identified Inventory (OP/OBO): 50/183 WI: 94.94 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 16 NRI: 72.26 % BPO Gross CAPEX/Well: 6,223 $M % APO G
Slide 150: Project: Permian-EMB Lwr Spraberry Hz - NSAI
Project: Permian‐EMB Lwr Spraberry Hz (8,400')‐ NSAI Target: Lwr Spraberry Division: 6 Type: Drilling ‐ Horizontal COO/S: 100% Vital Statistics Identified Inventory (OP/OBO): 60/202 WI: 94.94 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 16 NRI: 72.26 % BPO Gross CAPEX/Well: 6,60
Slide 151: Project: Permian-EMB Lwr Spraberry Hz
Project: Permian‐EMB Lwr Spraberry Hz (8,400') Target: Lwr Spraberry Division: 6 Type: Drilling ‐ Horizontal COO/S: 100% Vital Statistics Identified Inventory (OP/OBO): 60/202 WI: 94.94 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 16 NRI: 72.26 % BPO Gross CAPEX/Well: 6,223 $M %
Slide 152: Project: Permian-EMB Mid Spraberry Hz
Project: Permian‐EMB Mid Spraberry Hz (8,400') Target: Mid Spraberry Division: 6 Type: Drilling ‐ Horizontal COO/S: 48% Vital Statistics Identified Inventory (OP/OBO): 60/124 WI: 94.94 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 16 NRI: 72.26 % BPO Gross CAPEX/Well: 6,223 $M %
Slide 153: Project: Permian-EMB Wolfcamp 'A' Hz - NSAI
Project: Permian‐EMB Wolfcamp 'A' Hz (8400') NSAI Target: Wolfcamp 'A' Division: 6 Type: Drilling ‐ Horizontal COO/S: 100% Vital Statistics Identified Inventory (OP/OBO): 60/202 WI: 94.94 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 16 NRI: 72.26 % BPO Gross CAPEX/Well: 6,604 $M
Slide 154: Project: Permian-EMB Wolfcamp 'A' Hz
Project: Permian‐EMB Wolfcamp 'A' Hz (8400') Target: Wolfcamp 'A' Division: 6 Type: Drilling ‐ Horizontal COO/S: 100% Vital Statistics Identified Inventory (OP/OBO): 60/202 WI: 94.94 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 16 NRI: 72.26 % BPO Gross CAPEX/Well: 6,223 $M % AP
Slide 155: Project: Permian-EMB Wolfcamp 'B' Hz - NSAI
Project: Permian‐EMB Wolfcamp 'B' Hz (8,400')‐ NSAI Target: Wolfcamp 'B' Division: 6 Type: Drilling ‐ Horizontal COO/S: 100% Vital Statistics Identified Inventory (OP/OBO): 60/202 WI: 94.94 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 16 NRI: 72.26 % BPO Gross CAPEX/Well: 6,223
Slide 156: Project: Permian-EMB Wolfcamp 'B' Hz
Project: Permian‐EMB Wolfcamp 'B' Hz (8,400') Target: Wolfcamp 'B' Division: 6 Type: Drilling ‐ Horizontal COO/S: 100% Vital Statistics Identified Inventory (OP/OBO): 60/202 WI: 94.94 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 18 NRI: 72.26 % BPO Gross CAPEX/Well: 6,223 $M % A
Slide 157: Project: Postle CO2 Pattern - Tier
Project: Postle CO2 Pattern ‐ Tier 1 Target: Morrow A1/A2 Division: 5 Type: EOR Pattern COO/S: 100% Vital Statistics Identified Inventory (OP/OBO): 8 WI: 98.66 % BPO Pot. Unidentified Inventory: 0 98.66 % APO Max Projects per Year: 6 NRI: 85.86 % BPO Gross CAPEX/Well: 1,500 $M 85.86 % APO Gross CAPE
Slide 158: Project: Postle CO2 Pattern - Tier
Project: Postle CO2 Pattern ‐ Tier 2 Target: Morrow A1/A2 Division: 5 Type: EOR Pattern COO/S: 100% Vital Statistics Identified Inventory (OP/OBO): 72 WI: 98.66 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 6 NRI: 85.86 % BPO Gross CAPEX/Well: 1,500 $M % APO Gross CAPEX/Facility/
Slide 159: Project: Santa Fe Springs RCP
Project: Santa Fe Springs RCP ‐ BP3.0 No Risk Target: Bell/Meyer/Nordstrom/Buckbee/Clark/HW Division: 2 Type: Recompletion Vital Statistics Identified Inventory: 65 WI: 100.00 % BPO Pot. Unidentified Inventory: 10 % APO Max Projects per Year: 10 NRI: 93.25 % BPO Gross CAPEX/Well: 150 $M % APO Gross
Slide 160: Project: SW Wyoming Vert
Project: SW Wyoming Vert Target: Frontier/Dakota Division: 1 Type: Drilling ‐ Vertical (Avg. of 3 well groups) COO/S: 100% Vital Statistics Identified Inventory (OP/OBO): 60 WI: 45.00 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 5 NRI: 35.14 % BPO Gross CAPEX/Well: 2,420 $M % AP
Slide 161: Project: East Texas Hz Cotton Valley Taylor
Project: East Texas Hz Target: Cotton Valley Taylor Division: 4 Type: Drilling Horizontal *Actual WI will Vary COO/S: 80% Vital Statistics Identified Inventory (OP/OBO): 86 WI*: 100.00 % BPO Pot. Unidentified Inventory: 32 % APO Max Projects per Year: 16 NRI*: 78.00 % BPO Gross CAPEX/Well: 5,440
Slide 162: Project: East Texas Haynesville Hz
Project: East Texas Haynesville Hz Target: Haynesville Division: 4 Type: Drilling Horizontal COO/S: 72% Vital Statistics Identified Inventory (OP/OBO): 40 WI: 100.00 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 14 NRI: 74.00 % BPO Gross CAPEX/Well: 6,500 $M % APO Gross CAPEX/F
Slide 163: Project: East Texas Haynesville Vt
Project: East Texas Haynesville Vt Target: Haynesville Division: 4 Type: Drilling Vertical COO/S: 70% Vital Statistics Identified Inventory (OP/OBO): 57 WI: 100.00 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 12 NRI: 74.37 % BPO Gross CAPEX/Well: 2,369 $M % APO Gross CAPEX/F