Breitburn Energy Partners LP

Breitburn Energy Partners LP — Presentation (May 2017)

163 slides from Breitburn Energy Partners LP's investor presentation, May 25, 2017

  1. Slide 1: Preliminary Discussion Materials

    CONFIDENTIAL Highly Confidential Subject to FRE 408 Subject to Express Confidentiality Agreement BREITBURN ENERGY PARTNERS LP PRELIMINARY DISCUSSION MATERIALS DECEMBER 6 2016 Exhibit 99.1

  2. Slide 2: None of Breitburn, Lazard Frères & Co. LLC (“Lazard”) and Alvarez & Marsal North

    CONFIDENTIAL None of Breitburn, Lazard Frères & Co. LLC (“Lazard”) and Alvarez & Marsal North America, LLC (“A&M”), and each of their subsidiaries, affiliates, officers, directors, shareholders, employees, consultants, advisors, agents and representatives of the foregoing (collectively, “Representat

  3. Slide 3: Agenda

    CONFIDENTIAL AGENDA 1. Company Introduction Hal Washburn 2. Operations Overview and Plan Mark Pease 3. G&A and District Expense Reduction Efforts Jim Jackson 4. Financial Projections Jim Jackson 5. Next Steps Discussion Tim Pohl

  4. Slide 4: Company Introduction

    CONFIDENTIAL COMPANY INTRODUCTION

  5. Slide 5: Management – Ten Years of Continuity

    CONFIDENTIAL pg. 5 MANAGEMENT – TEN YEARS OF CONTINUITY Halbert S. Washburn – Director and Chief Executive Officer  Chief Executive Officer of Breitburn’s General Partner since April 2010  Served as Co-Chief Executive Officer and a director of Breitburn predecessor entities from May 1988  Current

  6. Slide 6: Years of Operatorship

    CONFIDENTIAL OVER 28 YEARS OF OPERATORSHIP pg. 6 • Predecessor founded in 1988; IPO in 2006 • Value created - and capital returned - for numerous owners across commodity cycles • Seasoned team, proven innovative solution-finding capability, rich corporate action history KEY MESSAGES • Multi-faceted

  7. Slide 7: Strong History of Operating and Financial Performance

    CONFIDENTIAL California Southeast Rockies Mid-Continent MI/IN/KY Ark-La-Tex Permian Basin 4.6 15.1 18.4 17.9 18.4 19.3 22.8 30.0 38.7 55.3 0 10 20 30 40 50 60 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 Mbo ep d Average Daily Reported Production pg. 7 STRONG HISTORY OF OPERATING AND FINANCIAL

  8. Slide 8: Attractive Assets in Producing Areas

    CONFIDENTIAL ATTRACTIVE ASSETS IN 7 PRODUCING AREAS pg. 8 ARK-LA-TEX 2015 Avg. Daily Production 10,022 Boe/d Est. Proved Reserves 46.9 MMboe SOUTHEAST 2015 Avg. Daily Production 5,585 Boe/d Est. Proved Reserves 20.4 MMboe MI/IN/KY 2015 Avg. Daily Production 8,468 Boe/d Total Proved Reserves 51.5 MMb

  9. Slide 9: Extensive Capabilities; Broad and Deep Economic Opportunity Set

    CONFIDENTIAL pg. 9 EXTENSIVE CAPABILITIES; BROAD AND DEEP ECONOMIC OPPORTUNITY SET Conventional and Unconventional Reservoirs • Shallow gas, natural water drive • Permian shale, tight gas Value via Drill-Bit • Horizontal drilling and completion • Infills, step-outs Secondary and Enhanced Oil Recover

  10. Slide 10: Disciplined capital spending

    CONFIDENTIAL As market conditions continually deteriorated over the last two years, the company has maintained disciplined capital spending programs. Budgeting decisions have been influenced by critical factors such as: liquidity conservation, dynamic project economics and preservation of vested cor

  11. Slide 11: LOE reductions

    CONFIDENTIAL Organizational structural changes placed the company’s best managers in a position to have maximum impact. The assets were broken into smaller divisions grouping together those with complimentary technical characteristics. Employees met the challenge of changing emphasis from intense ca

  12. Slide 12: G&A reductions

    CONFIDENTIAL Beginning in November 2014, Breitburn’s senior management team moved quickly to right-size the organization in light of the unprecedented deterioration of commodity prices and market conditions Instituted a hiring freeze on December 9, 2014 Achieved ~40% reduction in total G&A positio

  13. Slide 13: District expenses

    CONFIDENTIAL District expenses are operating costs incurred to manage or supervise the company’s operating assets such that wells, leases, or facilities benefit proportionately. In practice, the company’s technical personnel reporting up to, and including, divisional VPs, who are responsible for day

  14. Slide 14: Accessing and returning capital

    CONFIDENTIAL ACCESSING CAPITAL • Accessed $8bn+ of capital via multitude of sources: public and private equity, public and private preferred, public and private debt, at-the-market equity, equity issued as acquisition currency • Track record of innovative matching of assets with capital throughout p

  15. Slide 15: Portfolio offers maximum value creation

    CONFIDENTIAL pg. 15 PORTFOLIO OFFERS MAXIMUM VALUE CREATION AND MINIMAL INCREMENTAL CAPITAL EXPOSURE Accelerated Inventory Development Multiple Growth Avenues Embedded Funding Options Low-Risk Play Extension with Minimal Capital Exposure Bolt-on Acquisitions from Distressed Sellers Strategic Consoli

  16. Slide 16: Operations Overview and Plan

    CONFIDENTIAL OPERATIONS OVERVIEW AND PLAN

  17. Slide 17: Maintain Strategic Focus

    CONFIDENTIAL MAINTAIN STRATEGIC FOCUS pg. 17 • Organized by Division for operating efficiency – but Breitburn to the core • Aim for full resource value capture (have grown inventory through technical enhancement and/or step-out expansion in core fields since entering) • Continue to drive efficiencie

  18. Slide 18: Division VI Permian-Eastern Midland Basin

    CONFIDENTIAL DIVISION VI PERMIAN-EASTERN MIDLAND BASIN

  19. Slide 19: Division VI Overview

    CONFIDENTIAL DIVISION VI OVERVIEW • Spraberry Trend Acreage as of 9/30/16 – Total Acreage (including vertical/wellbore only & HZ rights): 24,670 gross / 21,580 net – Total HZ Acreage: 20,703 gross / 17,502 net • 6.3 MBoe/d of Q1 2016 net production – 401 gross producing wells • 2016 Capex: $3.3 MM –

  20. Slide 20: Horizontal Midland Basin Development

    CONFIDENTIAL 1) Includes Jo Mill Sand, Middle Spraberry, Wolfcamp D/Cline, and a second row of infill wells in the Wolfcamp A and the Lower Spraberry HORIZONTAL MIDLAND BASIN DEVELOPMENT Lower Spraberry Wolfcamp A Wolfcamp B Add. Potential Benches (1) Total Net Locations Operated 53 53 53 207 365 No

  21. Slide 21: Industry Activity Around Breitburn Acreage

    CONFIDENTIAL Operated Acreage Non-Operated Acreage INDUSTRY ACTIVITY AROUND BREITBURN ACREAGE Martin Howard Notes: Key horizontal wells; Lateral lengths are stimulated lengths. Lower Spraberry (28) Wolfcamp A (76) Wolfcamp B (20) November 11, 2016 Crownquest - Gratis 32-R 1HB Lateral Length: 9,953’

  22. Slide 22: Primary Development Area Stratigraphy

    CONFIDENTIAL U. Spraberry Shale Clear Fork L. Spraberry Shale Dean Wolfcamp A Wolfcamp B Wolfcamp C Cline L. Spraberry Sands M. Spraberry Shale U. Spraberry Sands PRIMARY DEVELOPMENT AREA STRATIGRAPHY System Series Formation San Andres, GlorietaGuad. Cisco Canyon Strawn Bend (Atoka) Woodford Kinderh

  23. Slide 23: Development Plan Supported by Subsurface Model

    CONFIDENTIAL DEVELOPMENT PLAN SUPPORTED BY SUBSURFACE MODEL Key Points  Technical data includes: logs, cores and 2D seismic data ─ 590 wells with digital triple- combo data ─ Member of Core Lab’s Midland Basin consortium ─ Cored 800’ of section from Lower Spraberry into the Wolfcamp B in the Beall

  24. Slide 24: Wellbore Diagram

    CONFIDENTIAL Surface Casing: 13 3/8", 54.5#, K-55, BT&C Hole Size: 17 1/2" set @ 450' ( cement to surface ) 9 5/8" Stage tool @ 3000' Intermediate Casing: 9 5/8", 40#, HCK-55, BT&C set @ 6,150' , 0 degs (special drift to 8.75") Hole Size: 12 1/4"" to 6,150' MD (6,150' TVD) (base of Clearfork) Produc

  25. Slide 25: Pad and Facilities Overview

    CONFIDENTIAL Pad and Facilities Design PAD AND FACILITIES OVERVIEW Key Points  Pad Design ─ Designed for 2 - 6 wells ─ 450’ by 400’ ─ 2 well facility shown ─ Pad cost: $85,000  Facilities Design ─ HP Separator ─ LP Separator ─ Heater Treater ─ 3x500 bbl oil tanks ─ 2x750 bbl water tanks ─ Facility

  26. Slide 26: Frac Water Management Plan

    CONFIDENTIAL FRAC WATER MANAGEMENT PLAN Key Points  Frac Pit Water Storage ─ 2,200 Mbbls  FW Pipeline Infrastructure ─ 7.4 miles buried 8” line ─ 30 MBWPD transfer capacity  Frac Water Sources ─ Fresh water o BBEP:15-20 MBWPD o Non-op: 10-15 MBWPD ─ Other water o Recycled: ~10 MBWPD  Water Requi

  27. Slide 27: Salt Water Disposal System

    CONFIDENTIAL SALT WATER DISPOSAL SYSTEM Key Points  Current Salt Water Disposal System ─ SWD pipeline in place ─ 1 operated SWD well ─ 3 tie-ins to 3rd party systems ─ Capacity of 38 MBWPD  2017 Plans ─ Drill 2 additional SWD wells ─ Capacity increase ~35 MBWPD Lloyd SWD pg. 27

  28. Slide 28: Horizontal Well Program

    CONFIDENTIAL pg. 28 HORIZONTAL WELL PROGRAM PRIMARY DEVELOPMENT AREA Key Points  Development ─ 189 gross operated locations (LS, WCA,WCB) ─ Six wells across section (880’ spacing) ─ Pad drill initially the Wolfcamp A & Lower Spraberry  Land ─ Acreage 100% HBP’d ─ 18 drill ready locations ─ Obtaini

  29. Slide 29: Eastern Midland Basin Summary Information

    CONFIDENTIAL EASTERN MIDLAND BASIN pg. 29 SUMMARY INFORMATION Overview  Operated Producing Wells (1) 355  Net Acreage Developed 11,001  3Q '16 Daily Production Undeveloped 6,501 Oil (bopd) 2,648 Total 17,502 Gas (mcfpd) 8,019 NGL (galpd) 70,594  Ownership Total (boepd) 5,665 Avg. W.I. 84.5% Avg.

  30. Slide 30: Division V Enhanced Oil Recovery

    CONFIDENTIAL DIVISION V ENHANCED OIL RECOVERY

  31. Slide 31: Division V - EOR Overview

    CONFIDENTIAL DIVISION V - EOR OVERVIEW  Jay/LEC Unit – 0.30 HCPV Injected  N2 flood began in 1981; 101 MMBBL tertiary recover to date  Flexible OPEX program  Robust PDNP Capital Program (RTP, RTI & CTI)  Substantial drilling opportunities  Postle Units – Range from 0.69-1.09 HCPV Injected  CO

  32. Slide 32: Postle Development Inventory

    CONFIDENTIAL * Morrow Sands - Net Isopach Maps – ‘A’, ‘A1’, ‘A2’ ** - New ‘A’ Patterns Include Lease Line and Interior Patterns Flooded ‘A’ / Floodable ‘A’ / Developed (MM STB) (MM STB) (%) HMAU – 59.3 / 59.3 / 100 HMU – 70.9 / 85.3 / 83 PUMU – 44.2 / 44.2 / 100 WHMU – 112.7 / 125.7 / 90 Total – 287

  33. Slide 33: Postle Historical & Projected Production

    CONFIDENTIAL 100 1,000 10,000 100,000 G ro ss Dail y P ro d u cti o n ( B OPD ) Postle/NEHU Field Oil Production POSS PROB PUD PNP PDP Historic pg. 33 POSTLE HISTORICAL & PROJECTED PRODUCTION Start Waterflood Start CO2 flood – PUMU, HMAU, WHMU Start CO2 flood - HMU Unit OOIP, MMSTB Primary + Seconda

  34. Slide 34: Greater Postle Field Summary Information

    CONFIDENTIAL GREATER POSTLE FIELD pg. 34 SUMMARY INFORMATION Overview  Operated Producing Wells (1) 248  Net Acreage Developed 32,094  3Q '16 Daily Production Undeveloped - Oil (bopd) 4,330 Total 32,094 Gas (mcfpd) 1,126 NGL (galpd) 38,711  Ownership Total (boepd) 5,440 Avg. W.I. 96.9% Avg. NRI

  35. Slide 35: Jay Field – Inventory

    CONFIDENTIAL Future Drill Wells (35) JAY FIELD –INVENTORY Fraction of Pay - High Reservoir Quality 2014-2015 Drill Wells (5) Well Spacing (Prod. + Inj.) Peak Development 100 acres/well Current Active 200 acres/well Future Plan 140 acres/well 3-P View 110 acres/well Immature Miscible Flood N2 Injecti

  36. Slide 36: Jay Historical & Projected Production

    CONFIDENTIAL 100 1,000 10,000 100,000 1,000,000 G ro ss D ai ly P ro d u ctio n ( B o p d ) Jay Field Oil Production POSS PROB PUD PNP PDP JAY HISTORICAL & PROJECTED PRODUCTION Unit OOIP, MMSTB Primary + Secondary Actuals and Forecast, MMBO Incremental Tertiary Actuals and Forecast, MMBO Jay/LEC 102

  37. Slide 37: Greater Jay Field Summary Information

    CONFIDENTIAL GREATER JAY FIELD pg. 37 SUMMARY INFORMATION Overview  Operated Producing Wells (1) 47  Net Acreage Developed 13,871  3Q '16 Daily Production Undeveloped - Oil (bopd) 3,133 Total 13,871 Gas (mcfpd) 77 NGL (galpd) 13,987  Ownership Total (boepd) 3,479 Avg. W.I. 92.8% Avg. NRI 76.4% E

  38. Slide 38: Division IV Ark-La-Tex

    CONFIDENTIAL DIVISION IV ARK-LA-TEX

  39. Slide 39: Division IV Overview

    CONFIDENTIAL DIVISION IV OVERVIEW  116K gross, 73K net acres 2,024 Gross Producing wells (2105 Year End NSAI)  Q1 2016 Net Production: 11,138 BOED (48% Liquids)  120 wells available for immediate reactivation with higher commodity prices yielding additional 200 BOPD  Asset Mix: Low-decline oil a

  40. Slide 40: Ark-La-Tex LOE

    CONFIDENTIAL ARK-LA-TEX LOE pg. 40  Reduced total LOE by 52% Q1 2016 vs Q1 2015  Reduced Workover Activity  Vendor Price Reductions  Shut in Uneconomic Wells  Cost Saving projects (Overton SWD)  Grew Production by 12% Q1 2016 vs Q1 2015  Overton Program  Reduced Unit LOE by $13.18/BOE (58%)

  41. Slide 41: Overton Overview

    CONFIDENTIAL AMI G R E E N B A Y 1 6 H E CH A RD 9 H H A R M O N -C A M E R O N 1 H C A M E R O N -H A R M O N 1 H G R IM E S 2 H D A V ID W IL S O N 1 1 H M C E LR O Y -S W A NN 2 H M C E LR O Y -S W A NN -M O O R E 2 H M C E LR O Y -S W A NN -M O O R E 1 H E CH A RD 7 H N E O 4 H W G U2 -C -L 1 H

  42. Slide 42: Overton Cotton Valley Target Interval

    CONFIDENTIAL pg. 42  Previous Overton Operators Targeted Taylor 4  BBEP’s Southern Acreage has limited Taylor 4 but thicker Taylor 3  BBEP Southern Overton wells Typically land in Taylor 3  Micro-seismic surveys and well performance indicate fracs are contacting all intervals in Southern Overton

  43. Slide 43: East Texas Oil Field Overview

    CONFIDENTIAL EAST TEXAS OIL FIELD OVERVIEW  Discovered in 1930  Woodbine Sands at ~ 3500’  Original Oil in Place > 7 billion bbls  Cumulative Production > 5.5 billion barrels  Shallow base decline  Low-cost field SWD gathering and reinjection system (ETSWD)  Hundreds of low cost/low risk upli

  44. Slide 44: Ark-La-Tex Summary Information

    CONFIDENTIAL ARK-LA-TEX pg. 44 SUMMARY INFORMATION Overview  Operated Producing Wells (1) 2,490  Net Acreage Developed 75,599  3Q '16 Daily Production Undeveloped 3,451 Oil (bopd) 3,448 Total 79,050 Gas (mcfpd) 34,310 NGL (galpd) 63,785  Ownership Total (boepd) 10,685 Avg. W.I. 75.1% Avg. NRI 58

  45. Slide 45: Division II California, W. Permian

    CONFIDENTIAL DIVISION II CALIFORNIA, W. PERMIAN

  46. Slide 46: California

    CONFIDENTIAL CALIFORNIA pg. 46 • Concentrated in large oil fields in the Los Angeles Basin and San Joaquin Valley – Company has long history in region with unique operational capabilities – Mature fields (some producing over 100 years) with low risk development opportunities – 2.5 billion Bbl OOIP,

  47. Slide 47: Santa Fe Springs Overview

    CONFIDENTIAL Highlights pg. 47 SANTA FE SPRINGS OVERVIEW • Field discovered in 1919; 2.0 BBbl OOIP • Peak production in 1920’s was 345,000 Bo/d • Cum oil production 640 MMBo (32%) • BBEP purchased from Texaco in 1999 for <$10mm; 1,400 Bo/d and 5.8 mmbo Reserves • 100% operated with 100% WI (~94% NRI

  48. Slide 48: Santa Fe Springs Field Production History

    CONFIDENTIAL pg. 48 SANTA FE SPRINGS FIELD PRODUCTION HISTORY Foix,Bell, Meyer Nordstrom,Buckbee,Clark-Hathaway,O’Connell Santa Fe, Bell100 Unitization Waterflood Meyer, Clark-Hathaway (1972) BBEP Purchased Field (1999)

  49. Slide 49: Santa Fe Springs Productive Intervals

    CONFIDENTIAL pg. 49 SANTA FE SPRINGS PRODUCTIVE INTERVAL(S) • Productive interval consists of 6000’ of massive channelized fan deposits and interbedded sand/shale sequences Upper M io ce n e P li o ce n e A B MEYER NORDSTROM O’CONNELL BELL HATHAWAY SANTA FE BUCKBEE - 10,000 - 2,000 - 8,000 - 6,000 -

  50. Slide 50: Field Development Plan

    CONFIDENTIAL FIELD DEVELOPMENT PLAN • Upgrade current Production Handling facilities to maximize throughput and reliability • Optimize well performance through surveillance, pumping diagnostics and lift optimization • Recomplete idle/underperforming wells targeting stratigraphically isolated increme

  51. Slide 51: Belridge Producer Re-Frac Potential

    CONFIDENTIAL BELRIDGE PRODUCER RE-FRAC POTENTIAL D-E D-A D-B D-C D-D D-F D-G D-G1 D-H C-8C Spud 5/15/2013 153’ HCFT By-passed Pay pg. 51

  52. Slide 52: Belridge Drilling Potential

    CONFIDENTIAL 0 20 40 60 80 100 120 140 160 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 Number of Wells Drilled 2013 BELRIDGE DRILLING POTENTIAL Belridge Surface Map 2013 Drilling EURs Mean EUR = 53 MBO 2014 Drilling EURs Mean EUR = 36 MBO Belridge Surface Map Drilled 2014 Remaining Locations EU

  53. Slide 53: California Summary Information

    CONFIDENTIAL CALIFORNIA pg. 53 SUMMARY INFORMATION Overview  Operated Producing Wells (1) 538  Net Acreage Developed 3,216  3Q '16 Daily Production Undeveloped 41 Oil (bopd) 3,975 Total 3,257 Gas (mcfpd) 831 NGL (galpd) 69  Ownership Total (boepd) 4,115 Avg. W.I. 81.5% Avg. NRI 77.5% Estimated R

  54. Slide 54: W Permian

    CONFIDENTIAL W PERMIAN • 98,951 Gross, 63,872 net acres across Permian Basin as of 9/30/16 • Mature waterflood properties including E. Fuhrman, N. Cowden, Howard Glasscock, and Turner Gregory Fields and OBO interests in Wasson, Westbrook, and Vacuum • Prolific gas properties in the Pegasus, Waha, Co

  55. Slide 55: M State Lease – Lea County, New Mexico

    CONFIDENTIAL pg. 55 M STATE LEASE – LEA COUNTY, NEW MEXICO Key Points: • 3,000 acre JV with XTO in Lea Co. NM • BPO 100%/75% • APO 65%/56.875% • 180 continuous development • Next spud date 11/1/2016 • Historically Blinebry, Drinkard, Tubb • Recently discovered deeper potential Leasehold Map Acreage

  56. Slide 56: M State Drilling Results

    CONFIDENTIAL M STATE 18 DRILLING RESULTS • MSE technology applied to improve drilling efficiency, with great results • Cut 8 days or 40% off previous drilling performance • Results in better than 30% reduction in capital cost that leverages each additional location • Process and technology transfers

  57. Slide 57: East Fuhrman – Glorietta Waterflood Expansion

    CONFIDENTIAL pg. 57 EAST_FUHRMAN – GLORIETTA WATERFLOOD EXPANSION Phase 1A Phase 1B • Phase 1A – $3.3 MM – (2017) • 2 years to peak rate • 2 Injectors • 4 Recompletions/Workovers • Phase 1B – $11.6 MM • Assumes completion of Phase 1A • 2 years to peak rate • 5 Producers, • 4 Injectors • 4 Recompleti

  58. Slide 58: West Permian Summary Information

    CONFIDENTIAL WEST PERMIAN pg. 58 SUMMARY INFORMATION Overview  Operated Producing Wells (1) 619  Net Acreage Developed 64,027  3Q '16 Daily Production Undeveloped 3,857 Oil (bopd) 2,666 Total 67,844 Gas (mcfpd) 8,600 NGL (galpd) 41,602  Ownership Total (boepd) 5,090 Avg. W.I. 84.3% Avg. NRI 64.6

  59. Slide 59: Division I

    CONFIDENTIAL DIVISION I

  60. Slide 60: Michigan Overview

    CONFIDENTIAL MICHIGAN OVERVIEW pg. 60 • Breitburn is the largest gas producer in Michigan and one of the top producers in the Antrim Shale as of 9/30/16 – Other Michigan reservoirs include: Praire du Chien, Richfield, Detroit River Zone III, and Niagaran pinnacle reefs – New Albany shale (IN/KY) • A

  61. Slide 61: MI/IN/KY Summary Information

    CONFIDENTIAL MI/IN/KY pg. 61 SUMMARY INFORMATION Overview  Operated Producing Wells (1) 1,660  Net Acreage Developed 251,085  3Q '16 Daily Production Undeveloped 12,687 Oil (bopd) 797 Total 263,772 Gas (mcfpd) 41,956 NGL (galpd) 4,894  Ownership Total (boepd) 7,906 Avg. W.I. 65.0% Avg. NRI 52.3%

  62. Slide 62: Rockies Overview

    CONFIDENTIAL ROCKIES OVERVIEW pg. 62 • Key basins include – Evanston and Green River Basins in southwestern Wyoming (primarily natural gas) – Big Horn and Wind River basins in central Wyoming (primarily oil) • Acreage: 207,778 (gross) / 112,865 (net) as of 9/30/16 • Interests in 970 productive wells

  63. Slide 63: Wyoming Waterfloods

    CONFIDENTIAL WYOMING WATERFLOODS pg. 63 SW BIGHORN BASIN OIL FIELDS WATERFLOOD PILOT WF CANDIDATE WF CANDIDATE Ferguson Ranch Field • Two active injectors • Waterflood unit in place • Opportunity to expand to full field flood Hunt Field • Not unitized • Offset operator must be addressed Sheep Point

  64. Slide 64: Rockies Summary Information

    CONFIDENTIAL ROCKIES pg. 64 SUMMARY INFORMATION Overview  Operated Producing Wells (1) 540  Net Acreage Developed 101,452  3Q '16 Daily Production Undeveloped 8,967 Oil (bopd) 2,771 Total 110,419 Gas (mcfpd) 17,079 NGL (galpd) 1,936  Ownership Total (boepd) 5,664 Avg. W.I. 54.2% Avg. NRI 44.2% E

  65. Slide 65: SW Florida Summary Information

    CONFIDENTIAL SW FLORIDA pg. 65 SUMMARY INFORMATION Overview  Operated Producing Wells (1) 17  Net Acreage Developed 33,322  3Q '16 Daily Production Undeveloped 3,694 Oil (bopd) 1,079 Total 37,016 Gas (mcfpd) - NGL (galpd) -  Ownership Total (boepd) 1,079 Avg. W.I. 100.0% Avg. NRI 83.4% Estimated

  66. Slide 66: G&A and District Expense Reduction Efforts

    CONFIDENTIAL G&A AND DISTRICT EXPENSE REDUCTION EFFORTS

  67. Slide 67: G&A reductions

    CONFIDENTIAL Beginning in November 2014, Breitburn’s senior management team moved quickly to right-size the organization in light of the unprecedented deterioration of commodity prices and market conditions Instituted a hiring freeze on December 9, 2014 Achieved ~40% reduction in total G&A positio

  68. Slide 68: G&A Position and Cost Reductions

    CONFIDENTIAL G&A Position Reductions Division 4Q 2014 Positions Net Reductions 4Q 2015 Positions Net Reductions 2Q 2016 Positions Total Net Reductions CEO 19 (6) 13 (4) 9 (10) CAO 98 (23) 75 (13) 62 (36) CFO 129 (12) 117 (20) 97 (32) COO 40 (9) 31 (10) 21 (19) Subtotal 286 (50) 236 (47) 189 (97) G&A

  69. Slide 69: Current G&A Expense Profile

    CONFIDENTIAL pg. 69 CURRENT G&A EXPENSE PROFILE Right-sized G&A structure supports an asset base consisting of producing and non-producing oil, NGL and natural gas reserves located across 12 states • Michigan, Indiana, Kentucky, Arkansas, Louisiana, Texas, New Mexico, Wyoming, Colorado, Florida, Al

  70. Slide 70: 2017 G&A initiatives

    CONFIDENTIAL With continued efforts toward driving down administrative costs, management is targeting 2017 G&A costs to be lower than 2016 run-rate Initiatives underway have and will continue to result in run-rate savings, further driving down G&A costs • Reject unfavorable leases - Relocate Housto

  71. Slide 71: District expenses

    CONFIDENTIAL District expenses are operating costs incurred to manage or supervise the company’s operating assets such that wells, leases, or facilities benefit proportionately. In practice, the company’s technical personnel reporting up to, and including, divisional VPs, who are responsible for day

  72. Slide 72: District Position Reductions

    CONFIDENTIAL District Position Reductions Division 4Q 2014 Positions Net Reductions 4Q 2015 Positions Net Reductions 2Q 2016 Positions Total Net Reductions CEO - - - - - - CAO - - - - - - CFO - - - - - - COO 182 (20) 162 (29) 133 (49) Subtotal 182 (20) 162 (29) 133 (49) District Headcount % Change (

  73. Slide 73: District Expense Initiatives for 2017

    CONFIDENTIAL Current expense reduction initiatives offset the bulk of forecasted increases in 2017 District Expense budget Initiatives underway have resulted in run-rate savings, driving down District Non-Payroll costs • Reject unfavorable leases - Relocate Houston office from 5HC to Rosetta - Rej

  74. Slide 74: Preliminary Discussion Materials December 21, 2016

    CONFIDENTIAL PRELIMINARY DISCUSSION MATERIALS BREITBURN ENERGY PARTNERS LP DECEMBER 21, 2016 Highly Confidential Subject to FRE 408 Subject to Express Confidentiality Agreement

  75. Slide 75: None of Breitburn, Lazard Frères & Co. LLC (“Lazard”) and Alvarez & Marsal North

    CONFIDENTIAL None of Breitburn, Lazard Frères & Co. LLC (“Lazard”) and Alvarez & Marsal North America, LLC (“A&M”), and each of their subsidiaries, affiliates, officers, directors, shareholders, employees, consultants, advisors, agents and representatives of the foregoing (collectively, “Representat

  76. Slide 76: Overview

    CONFIDENTIAL OVERVIEW Agenda  Introductions  Overview • BBEP Asset Base • Operational Management Organization • Portfolio Modeling – Strategic to Tactical • Cost Control Performance • Capital Investment Plan  Divisional Reviews • Division VI – Permian Eastern Midland Basin • Division V – Enhanced

  77. Slide 77: Attractive Assets in Producing Areas

    CONFIDENTIAL ATTRACTIVE ASSETS IN 7 PRODUCING AREAS ARK-LA-TEX 2015 Avg. Daily Production 10,022 Boe/d Est. Proved Reserves 46.9 MMboe SOUTHEAST 2015 Avg. Daily Production 5,585 Boe/d Est. Proved Reserves 20.4 MMboe MI/IN/KY 2015 Avg. Daily Production 8,468 Boe/d Total Proved Reserves 51.5 MMboe MID

  78. Slide 78: Extensive Capabilities; Broad and Deep Economic Opportunity Set

    CONFIDENTIAL EXTENSIVE CAPABILITIES; BROAD AND DEEP ECONOMIC OPPORTUNITY SET Conventional and Unconventional Reservoirs • Shallow gas, natural water drive • Permian shale, tight gas Value via Drill-Bit • Horizontal drilling and completion • Infills, step-outs Secondary and Enhanced Oil Recovery Prof

  79. Slide 79: Portfolio Management

    CONFIDENTIAL PORTFOLIO MANAGEMENT • What is Portfolio Management? – A strategic planning process that efficiently models the impact of resource allocation on corporate performance – A methodology to compare the relative attractiveness and trade-offs of alternative investment scenarios • How do we us

  80. Slide 80: Possible Opportunities

    CONFIDENTIAL POSSIBLE OPPORTUNITIES • BBEP has a sizeable inventory of identified opportunities • Projects have been matured to varying states of readiness • Portfolio exhibits balance between oil and gas investments pg. 80 PROJECT TYPE DIVISION 1 DIVISION 2 DIVISION 4 DIVISION 5 DIVISION 6 Total CO

  81. Slide 81: Disciplined capital spending

    CONFIDENTIAL As market conditions continually deteriorated over the last two years, the company has maintained disciplined capital spending programs. Budgeting decisions have been influenced by critical factors such as: liquidity conservation, dynamic project economics and preservation of vested cor

  82. Slide 82: LOE reductions

    CONFIDENTIAL Organizational structural changes placed the company’s best managers in a position to have maximum impact. The assets were broken into smaller divisions grouping together those with complimentary technical characteristics. Employees met the challenge of changing emphasis from intense ca

  83. Slide 83: Division VI Permian-Eastern Midland Basin

    CONFIDENTIAL DIVISION VI PERMIAN-EASTERN MIDLAND BASIN

  84. Slide 84: Division VI Overview

    CONFIDENTIAL DIVISION VI OVERVIEW • Spraberry Trend Acreage as of 9/30/16 – Total Acreage (including vertical/wellbore only & HZ rights): 24,670 gross / 21,580 net – Total HZ Acreage: 20,703 gross / 17,502 net • 6.3 MBoe/d of Q1 2016 net production – 401 gross producing wells • 2016 Capex: $3.3 MM –

  85. Slide 85: Primary Development Area Stratigraphy

    CONFIDENTIAL U. Spraberry Shale M. Spraberry Shale Clear Fork L. Spraberry Shale Dean Wolfcamp A Wolfcamp B Wolfcamp C Cline Jo Mill Sand U. Spraberry Sands PRIMARY DEVELOPMENT AREA STRATIGRAPHY System Series Formation San Andres, GlorietaGuad. Cisco Canyon Strawn Bend (Atoka) Woodford Kinderhook Mi

  86. Slide 86: Horizontal Midland Basin Development

    CONFIDENTIAL 1) Includes Jo Mill Sand, Middle Spraberry, Wolfcamp D/Cline, and a second row of infill wells in the Wolfcamp A and the Lower Spraberry HORIZONTAL MIDLAND BASIN DEVELOPMENT Lower Spraberry Wolfcamp A Wolfcamp B Add. Potential Benches (1) Total Net Locations Operated 53 53 53 207 365 No

  87. Slide 87: Development Plan Supported by Subsurface Model

    CONFIDENTIAL DEVELOPMENT PLAN SUPPORTED BY SUBSURFACE MODEL Key Points  Technical data includes: logs, cores and 2D seismic data ─ 590 wells with digital triple- combo data ─ Member of Core Lab’s Midland Basin consortium ─ Cored 800’ of section from Lower Spraberry into the Wolfcamp B in the Beall

  88. Slide 88: W-E Stratigraphic Cross-Section

    CONFIDENTIAL Key Points  Reservoirs are present across acreage ─ Lower Spraberry ─ Wolfcamp A ─ Wolfcamp B  Thickness and stratigraphic position of carbonate beds vary, present in other areas that are being developed W-E STRATIGRAPHIC CROSS-SECTION DATUM: TOP OF DEAN FM GR RT PHIE West East Sw GR

  89. Slide 89: Industry Activity Around Breitburn Acreage

    CONFIDENTIAL INDUSTRY ACTIVITY AROUND BREITBURN ACREAGE Martin Howard Crownquest - Gratis 32-R 1HB Lateral Length: 9,953’ IP/IP30 (Boe/d): 1,343/1,063 Callon– Garrett Unit 37-48 3SH Lateral Length: 6,901’ IP/IP30 (Boe/d): 882/682 Surge - Elrod-Antell Unit A 11-02 4SH Lateral Length: 6,676‘ IP/IP30 (

  90. Slide 90: SM Energy

    CONFIDENTIAL SM ENERGY INVESTOR PRESENTATION DECEMBER 7, 2016 pg. 90

  91. Slide 91: Diamondback

    CONFIDENTIAL DIAMONDBACK INVESTOR PRESENTATION NOVEMBER 2016 pg. 91

  92. Slide 92: Callon Petroleum

    CONFIDENTIAL CALLON PETROLEUM INVESTOR PRESENTATION NOVEMBER 2, 2016 pg. 92

  93. Slide 93: Wellbore Diagram

    CONFIDENTIAL Surface Casing: 13 3/8", 54.5#, K-55, BT&C Hole Size: 17 1/2" set @ 450' ( cement to surface ) 9 5/8" Stage tool @ 3000' Intermediate Casing: 9 5/8", 40#, HCK-55, BT&C set @ 6,150' , 0 degs (special drift to 8.75") Hole Size: 12 1/4"" to 6,150' MD (6,150' TVD) (base of Clearfork) Produc

  94. Slide 94: Central Production Facility

    CONFIDENTIAL CENTRAL PRODUCTION FACILITY Key Points  Design ─ 36 wells per CPF ─ individual well test separators ─ two 18 well systems w/separate - oil processing - electrical transmission ─ shared SWD facilities ─ 450’ by 400’ location size  Benefits ─ ~50% reduction in capital costs ─ lower oper

  95. Slide 95: Frac Water Management Plan

    CONFIDENTIAL FRAC WATER MANAGEMENT PLAN Key Points  Frac Pit Water Storage ─ 2,200 Mbbls  FW Pipeline Infrastructure ─ 7.4 miles buried 8” line ─ 30 MBWPD transfer capacity  Frac Water Sources ─ Fresh water o BBEP:15-20 MBWPD o Non-op: 10-15 MBWPD ─ Other water o ~10 MBWPD  Water Requirements ─

  96. Slide 96: Salt Water Disposal System

    CONFIDENTIAL SALT WATER DISPOSAL SYSTEM Key Points  Current Salt Water Disposal System ─ SWD pipeline in place ─ 1 operated SWD well ─ 3 tie-ins to 3rd party systems ─ Capacity of 38 MBWPD  2017 Plans ─ Drill 2 additional SWD wells ─ Capacity increase ~35 MBWPD Lloyd SWD pg. 96

  97. Slide 97: Lease Operating Expense

    CONFIDENTIAL Key Points  Lease operating expenses based on extensive experience operating across the basin  Fixed & Variable LOE cost model  Produced water disposal is the primary early LOE cost driver  Plan to dispose of produced water in operated SWD wells  Artificial lift method will be 2 re

  98. Slide 98: Horizontal Well Program

    CONFIDENTIAL HORIZONTAL WELL PROGRAM PRIMARY DEVELOPMENT AREA Key Points  Development ─ 3 well pad drilling ─ Six wells across section (880’ spacing) ─ 180 base operated locations (LS, WCA,WCB) ─ 236 upside operated locations (WCA,LS, Jo Mill, MS, Cline)  Land ─ Acreage 100% HBP’d ─ 18 drill ready

  99. Slide 99: Division V Enhanced Oil Recovery

    CONFIDENTIAL DIVISION V ENHANCED OIL RECOVERY

  100. Slide 100: Division V - EOR Overview

    CONFIDENTIAL DIVISION V - EOR OVERVIEW  Jay/LEC Unit – 0.30 HCPV Injected  N2 flood began in 1981; 101 MMBBL tertiary recover to date  Flexible OPEX program  Robust PDNP Capital Program (RTP, RTI & CTI)  Substantial drilling opportunities  Postle Units – Range from 0.69-1.09 HCPV Injected  CO

  101. Slide 101: CO2 Delivery Infrastructure

    CONFIDENTIAL CO2 DELIVERY INFRASTRUCTURE pg. 101 CO2 Sources ►Libby Ranch (Reliant) ►Bravo Dome (Exxon) ►Team CO2 (Whiting) Midstream Facilities ►Libby Ranch Compression ►Libby Ranch PL Lateral ►Transpetco Pipeline ►NE Hardesty PL Lateral Oil Field ►Postle Complex (5 Units) ►NE Hardesty Unit ►Dry Tr

  102. Slide 102: Postle Development Inventory

    CONFIDENTIAL * Morrow Sands - Net Isopach Maps – ‘A’, ‘A1’, ‘A2’ ** - New ‘A’ Patterns Include Lease Line and Interior Patterns Flooded ‘A’ / Floodable ‘A’ / Developed (MM STB) (MM STB) (%) HMAU – 59.3 / 59.3 / 100 HMU – 70.9 / 85.3 / 83 PUMU – 44.2 / 44.2 / 100 WHMU – 112.7 / 125.7 / 90 Total – 287

  103. Slide 103: Postle Historical & Projected Production

    CONFIDENTIAL 100 1,000 10,000 100,000 G ro ss Dail y P ro d u cti o n ( B OPD ) Postle/NEHU Field Oil Production POSS PROB PUD PNP PDP Historic POSTLE HISTORICAL & PROJECTED PRODUCTION Start Waterflood Start CO2 flood – PUMU, HMAU, WHMU Start CO2 flood - HMU Unit OOIP, MMSTB Primary + Secondary Actu

  104. Slide 104: CO2 EOR PUD Development Methodology

    CONFIDENTIAL 1) Dimensionless Typecurve closely fits with Unit where majority of PUDs are located CO2 EOR PUD DEVELOPMENT METHODOLOGY 2) Determine by statistics the likely processing rate of PUDs, again by analog 3) Use geologic parameters to determine OOIPs of PUD pattern areas, allowing us to scal

  105. Slide 105: Proof of Concept – A1/A2 Development

    CONFIDENTIAL • In the west end of WHMU, the primary ‘A’ sand doesn’t exist, and the A1/A2 has been developed instead • Variability in tertiary RF% stems from pattern configuration and centrally located injection well PROOF OF CONCEPT – A1/A2 DEVELOPMENT Pattern Tertiary RF% CO2 Start WHMU 216 0.25 0

  106. Slide 106: Jay Field – Location and Inventory

    CONFIDENTIAL Future Drill Wells (35) JAY FIELD – LOCATION AND INVENTORY Fraction of Pay - High Reservoir Quality 2014-2015 Drill Wells (5) Future Opportunities PNP PUD PRB POS Wells Wells Wells Wells 10 35 16 0 Well Spacing (Prod. + Inj.) Peak Development 100 acres/well Current Active 200 acres/well

  107. Slide 107: Recovery Profile by Pattern

    CONFIDENTIAL RECOVERY PROFILE BY PATTERN Inactive Active – Cum. D&C 2A1AB 4B • Four of the 9 patterns performed below average • Three Patterns have a rounded-curve suggesting gradual decline in production rate • Pattern 1A • Pattern 1B • Pattern 2A • One of these 4 Patterns has a sharp bend in curve

  108. Slide 108: 2627282930 36 30 31 12 13 24 39 40 10 11 12 17 18

    CONFIDENTIAL 25 36 2627282930 31 32 33 34 35 1 10 11 2 21 22 3 25 34 35 36 30 31 12 13 24 39 40 10 11 12 17 18 19 2 20 21 22 23 24 2930 3132 4 40 41 42 43 56 7 8 9 2829 32 33 34 35 36 5N 29W 6N 29W 36-2 36-1 31-5 25-16 26-7 36-5 36-6 36-9 25-13 26-15 35-1 36-3 35-4 31-5ST 36-14 32-2 33-4B 30-4B 1 31

  109. Slide 109: Reservoir Quality & Recovery Factor

    CONFIDENTIAL 20% 25% 30% 35% 40% 45% 50% 55% 60% 50 100 150 200 250 300 350 400 Pre-Dev RF Total Well Spacing (Acres/Well.) Jay/LEC Unit 2016 (Pre-Development) RESERVOIR QUALITY & RECOVERY FACTOR 1AB 2A 2B 3A 3B 4A 4B 5AB 21,627 10,141 17,502 35,584 58,358 Recovered Remaining Recovered Remaining Rec

  110. Slide 110: Jay Historical & Projected Production

    CONFIDENTIAL 100 1,000 10,000 100,000 1,000,000 G ro ss D ai ly P ro d u ctio n ( B o p d ) Jay Field Oil Production POSS PROB PUD PNP PDP JAY HISTORICAL & PROJECTED PRODUCTION Unit OOIP, MMSTB Primary + Secondary Actuals and Forecast, MMBO Incremental Tertiary Actuals and Forecast, MMBO Jay/LEC 102

  111. Slide 111: Division IV Ark-La-Tex

    CONFIDENTIAL DIVISION IV ARK-LA-TEX

  112. Slide 112: Division IV Overview

    CONFIDENTIAL DIVISION IV OVERVIEW  116K gross, 73K net acres 2,024 Gross Prod wells (Year-end NSAI)  2016 Forecasted Net Production: 10,814 BOED or 9% above Budget  2016 Forecasted LOE: 39.7 MM$ or 39% below Budget  120 wells available for immediate reactivation with higher commodity prices yiel

  113. Slide 113: Ark-La-Tex LOE

    CONFIDENTIAL ARK-LA-TEX LOE  Reduced total LOE by 52% Q1 2016 vs Q1 2015  Reduced Workover Activity  Vendor Price Reductions  Shut in Uneconomic Wells  Cost Saving projects (Overton SWD)  Grew Production by 12% Q1 2016 vs Q1 2015  Overton Program  Reduced Unit LOE by $13.18/BOE (58%)  Sourc

  114. Slide 114: Overton Overview

    CONFIDENTIAL AMI G R E E N B A Y 1 6 H E CH A RD 9 H H A R M O N -C A M E R O N 1 H C A M E R O N -H A R M O N 1 H G R IM E S 2 H D A V ID W IL S O N 1 1 H M C E LR O Y -S W A NN 2 H M C E LR O Y -S W A NN -M O O R E 2 H M C E LR O Y -S W A NN -M O O R E 1 H E CH A RD 7 H N E O 4 H W G U2 -C -L 1 H

  115. Slide 115: Overton Cotton Valley Target Interval

    CONFIDENTIAL  Previous Overton Operators Targeted Taylor 4  BBEP’s Southern Acreage has limited Taylor 4 but thicker Taylor 3  BBEP Southern Overton wells Typically land in Taylor 3  Micro-seismic surveys and well performance indicate fracs are contacting all intervals in Southern Overton  Pote

  116. Slide 116: Overton Cotton Valley Performance

    CONFIDENTIAL OVERTON COTTON VALLEY PERFORMANCE  Improved Condensate Yields on Southern acreage  Initial Yields Exceeding 50 BBL/MMCF on some wells  Significantly enhances economics  May 2014 Gross Production was 4.7 MMcf/d & 37 BCPD  Jan 2016 Gross Production exceeded 58 MMcf/d and 1500 BCPD Gr

  117. Slide 117: Hot Link - Horizontal Cotton Valley

    CONFIDENTIAL Development Pace o 2017: Prove Concept • D&C 2 Wells and monitor production o 2018-2021: Continuous Rigline • 8 Wells/Rig/Year HOT LINK - HORIZONTAL COTTON VALLEY Project Development Profile # of Locations Capex ($M) Net EUR (MBOE) Development Cost ($/BOE) 2017 D&C Plan 2 $10,878 1,902

  118. Slide 118: East Texas Oil Field Overview

    CONFIDENTIAL EAST TEXAS OIL FIELD OVERVIEW  Discovered in 1930  Woodbine Sands at ~ 3500’  Original Oil in Place > 7 billion bbls  Cumulative Production > 5.5 billion barrels  Shallow base decline  Low-cost field SWD gathering and reinjection system (ETSWD)  Hundreds of low cost/low risk upli

  119. Slide 119: East Texas Oil Field Opportunities

    CONFIDENTIAL EAST TEXAS OIL FIELD OPPORTUNITIES  Modest development capital program maintains stable production rate  997 ESP Installations and RTP Uplift Projects  50 Deepenings and Recompletions Future Opportunities (2017 and Beyond) pg. 119

  120. Slide 120: Shongaloo Lower Haynesville Infill Potential

    CONFIDENTIAL SHONGALOO LOWER HAYNESVILLE INFILL POTENTIAL Haynesville Sands Type Log • Gross/Net Acreage: 8525/6575 acres – Located on Louisiana/Arkansas State Line • WI/NRI: 88/68% • Q1 2016 Net Production: 746 BOED (33% Liquids) • Produces Primarily from the Haynesville Sand • Current spacing >70

  121. Slide 121: Division II California, W. Permian

    CONFIDENTIAL DIVISION II CALIFORNIA, W. PERMIAN

  122. Slide 122: California

    CONFIDENTIAL CALIFORNIA • Concentrated in large oil fields in the Los Angeles Basin and San Joaquin Valley – Company has long history in region with unique operational capabilities – Mature fields (some producing over 100 years) with low risk development opportunities – 2.5 billion Bbl OOIP, 1.5 bil

  123. Slide 123: Santa Fe Springs Overview

    CONFIDENTIAL Highlights SANTA FE SPRINGS OVERVIEW • Field discovered in 1919; 2.0 BBbl OOIP • Peak production in 1920’s was 345,000 Bo/d • Cum oil production 640 MMBo (32%) • BBEP purchased from Texaco in 1999 for <$10mm; 1,400 Bo/d and 5.8 mmbo Reserves • 100% operated with 100% WI (~94% NRI) in th

  124. Slide 124: Santa Fe Springs Field Production History

    CONFIDENTIAL SANTA FE SPRINGS FIELD PRODUCTION HISTORY Foix,Bell, Meyer Nordstrom,Buckbee,Clark-Hathaway,O’Connell Santa Fe, Bell100 Unitization Waterflood Meyer, Clark-Hathaway (1972) BBEP Purchased Field (1999) pg. 124

  125. Slide 125: Santa Fe Springs Productive Intervals

    CONFIDENTIAL SANTA FE SPRINGS PRODUCTIVE INTERVAL(S) • Productive interval consists of 6000’ of massive channelized fan deposits and interbedded sand/shale sequences Upper M io ce n e P li o ce n e A B MEYER NORDSTROM O’CONNELL BELL HATHAWAY SANTA FE BUCKBEE - 10,000 - 2,000 - 8,000 - 6,000 - 4,000

  126. Slide 126: Field Development Plan

    CONFIDENTIAL FIELD DEVELOPMENT PLAN • Upgrade current Production Handling facilities to maximize throughput and reliability • Optimize well performance through surveillance, pumping diagnostics and lift optimization • Recomplete idle/underperforming wells targeting stratigraphically isolated increme

  127. Slide 127: SFS Additional Drilling Opportunities

    CONFIDENTIAL SFS ADDITIONAL DRILLING OPPORTUNITIES HATHAWAY 200 & NORDSTROM EXAMPLE Hathaway 200 (Green structural high) (Red Circles are other potential drill locations) Hathaway 200 Nordstrom Drilling and Completion ($M) 2,100 150 Risked 30 Day IP (BOPD) 81 63 Volumetric Reserve Potential 860 MBO

  128. Slide 128: Belridge

    CONFIDENTIAL Belridge BELRIDGE Key UpsideDaily Production (Mboe/d) Asset Highlights • Current Diatomite Gross Production: 800 BOPD, 800 Mcf/d, 16500 BWPD • 114 Active Diatomite Production Wells, 79 Active Water Injection Completions • 320 Acre Lease (100% BBEP WI, 83% Net) Operated by BBEP • 26 Re-F

  129. Slide 129: Belridge Producer Re-Frac Potential

    CONFIDENTIAL BELRIDGE PRODUCER RE-FRAC POTENTIAL D-E D-A D-B D-C D-D D-F D-G D-G1 D-H C-8C Spud 5/15/2013 By-passed Pay Re-Frac Reserves and Economics Cost: $175,000 per well 20 MBO Gross Reserves per well pg. 129

  130. Slide 130: Belridge Drilling Potential

    CONFIDENTIAL Belridge Diatomite Oil Isopach Current Spacing Remaining Locations BELRIDGE DRILLING POTENTIAL 0 20 40 60 80 100 120 140 160 180 200 1 6 3 1 2 5 1 8 7 2 4 9 3 1 1 3 7 3 4 3 5 4 9 7 5 5 9 6 2 1 6 8 3 7 4 5 8 0 7 8 6 9 9 3 1 9 9 3 1 0 5 5 1 1 1 7 Type Curve Rate Profile G ro ss B OP D Day

  131. Slide 131: LA Basin Fields Capital Opportunities

    CONFIDENTIAL 0 20000 40000 60000 80000 100000 120000 140000 160000 180000 200000 1 3 5 7 9 11 13 15 17 19 21 Anaheim 2 and 3 Upside EAST COYOTE Sawtelle Three BBEP Wells Remain to Complete Downhole Pump Conversions Eliminating Kobe Hydraulic Pumps with Significant LOE Savings Resulting 2015 2016 $/M

  132. Slide 132: W Permian

    CONFIDENTIAL W PERMIAN • 98,951 Gross, 63,872 net acres across Permian Basin as of 9/30/16 • Mature waterflood properties including E. Fuhrman, N. Cowden, Howard Glasscock, and Turner Gregory Fields and OBO interests in Wasson, Westbrook, and Vacuum • Prolific gas properties in the Pegasus, Waha, Co

  133. Slide 133: M State Lease – Lea County, New Mexico

    CONFIDENTIAL M STATE LEASE – LEA COUNTY, NEW MEXICO Key Points: • 3,000 acre JV with XTO in Lea Co. NM • 180 continuous development • Next spud date 11/1/2016 • Historically Blinebry, Drinkard, Tubb • Additional pay opportunities to exploit Leasehold Map Acreage Position Field Production pg. 133

  134. Slide 134: M State Drilling Results

    CONFIDENTIAL M STATE 18 DRILLING RESULTS • MSE technology applied to improve drilling efficiency, with great results • Cut 8 days or 40% off previous drilling performance • Results in better than 30% reduction in capital cost that leverages each additional location • Process and technology transfers

  135. Slide 135: East Fuhrman – Glorietta Waterflood Expansion

    CONFIDENTIAL EAST_FUHRMAN – GLORIETTA WATERFLOOD EXPANSION Phase 1A Phase 1B • Phase 1A – $3.3 MM – (2017) • 2 years to peak rate • 2 Injectors • 4 Recompletions/Workovers • Phase 1B – $11.6 MM • Assumes completion of Phase 1A • 2 years to peak rate • 5 Producers, • 4 Injectors • 4 Recompletions/Wor

  136. Slide 136: Division I

    CONFIDENTIAL DIVISION I

  137. Slide 137: Michigan Overview

    CONFIDENTIAL MICHIGAN OVERVIEW • Breitburn is the largest gas producer in Michigan and one of the top producers in the Antrim Shale as of 9/30/16 – Other Michigan reservoirs include: Praire du Chien, Richfield, Detroit River Zone III, and Niagaran pinnacle reefs – New Albany shale (IN/KY) • Acreage:

  138. Slide 138: Rockies Overview

    CONFIDENTIAL ROCKIES OVERVIEW • Key basins include – Evanston and Green River Basins in southwestern Wyoming (primarily natural gas) – Big Horn and Wind River basins in central Wyoming (primarily oil) • Acreage: 207,778 (gross) / 112,865 (net) as of 9/30/16 • Interests in 970 productive wells (67% o

  139. Slide 139: Wyoming Waterfloods

    CONFIDENTIAL WYOMING WATERFLOODS SW BIGHORN BASIN OIL FIELDS WATERFLOOD PILOT WF CANDIDATE WF CANDIDATE Ferguson Ranch Field • Two active injectors • Waterflood unit in place • Opportunity to expand to full field flood Hunt Field • Not unitized • Offset operator must be addressed Sheep Point Field •

  140. Slide 140: Supplemental Materials Provided Separately

    CONFIDENTIAL SUPPLEMENTAL MATERIALS PROVIDED SEPARATELY

  141. Slide 141: Project: Belridge Diatomite

    Project: Belridge Diatomite Target: Opal 'A' Diatomite Division: 1 Type: Drilling ‐ Vertical COO/S: 100% Vital Statistics Identified Inventory: 56 WI: 100.00 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 10 NRI: 83.00 % BPO Gross CAPEX/Well: 650 $M % APO Gross CAPEX/Land‐Facility

  142. Slide 142: Project: ETOF Deepening

    Project: ETOF Deepening Target: Woodbine Division: 4 Type: Drill ‐ Deepen COO/S: Vital Statistics Identified Inventory (OP/OBO): 60 WI: 100.00 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 10 NRI: 87.50 % BPO Gross CAPEX/Well: 125 $M % APO Gross CAPEX/Facility: 0 $M* * Allocated

  143. Slide 143: Project: ETOF RTP

    Project: ETOF RTP Target: Woodbine Division: 4 Type: Recomplete ‐ Return to Production COO/S: Vital Statistics Identified Inventory (OP/OBO): 150 WI: 100.00 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 30 NRI: 87.50 % BPO Gross CAPEX/Well: 70 $M % APO Gross CAPEX/Facility: 0 $M*

  144. Slide 144: Project: Jay Vertical (No Facility Req.)

    Project: Jay Vertical (No Facility Req.) Target: Smackover Division: 5 Type: Drilling ‐ Vertical COO/S: Vital Statistics Identified Inventory (OP/OBO): 12 WI: 93.16 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 7 NRI: 76.31 % BPO Gross CAPEX/Well: 4,135 $M % APO Gross CAPEX/Facil

  145. Slide 145: Project: Jay Vertical (Facility Req.)

    Project: Jay Vertical (Facility Req.) Target: Smackover Division: 5 Type: Drilling ‐ Vertical COO/S: Vital Statistics Identified Inventory (OP/OBO): 23 WI: 93.16 % BPO Pot. Unidentified Inventory: 15 % APO Max Projects per Year: 7 NRI: 76.31 % BPO Gross CAPEX/Well: 4,135 $M % APO Gross CAPEX/Facilit

  146. Slide 146: Project: MI Antrim

    Project: MI Antrim (Type Curve is 10 Well Package) Target: Antrim (Lachine / Norwood) Division: 1 Type: Drilling ‐ Vertical COO/S: Vital Statistics Identified Inventory (OP/OBO): 36 WI: 100.00 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 6 NRI: 87.50 % BPO Gross CAPEX/Well: 2,10

  147. Slide 147: Project: MI Collingwood-Utica

    Project: MI Collingwood‐Utica Target: Collingwood / Utica Division: 1 Type: Drilling ‐ Horizontal COO/S: Vital Statistics Identified Inventory (OP/OBO): 141 WI: 94.73 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 25 NRI: 82.12 % BPO Gross CAPEX/Well: 5,610 $M % APO Gross CAPEX/Fa

  148. Slide 148: Project: M State Abo/Drinkard

    Project: M State Abo/Drinkard Target: Abo/Drinkard/Blinebry Division: 2 Type: Drilling ‐ Vertical Vital Statistics Identified Inventory: 23 WI: 100.00 % BPO Pot. Unidentified Inventory: 0 65.00 % APO Max Projects per Year: 10 NRI: 75.00 % BPO Gross CAPEX/Well: 1,900 $M 56.88 % APO Gross CAPEX/Land‐F

  149. Slide 149: Project: Permian-EMB Jo Mill Hz

    Project: Permian‐EMB Jo Mill Hz (8,400') Target: Jo Mill (Spby) Division: 6 Type: Drilling ‐ Horizontal COO/S: 38% Vital Statistics Identified Inventory (OP/OBO): 50/183 WI: 94.94 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 16 NRI: 72.26 % BPO Gross CAPEX/Well: 6,223 $M % APO G

  150. Slide 150: Project: Permian-EMB Lwr Spraberry Hz - NSAI

    Project: Permian‐EMB Lwr Spraberry Hz (8,400')‐ NSAI Target: Lwr Spraberry Division: 6 Type: Drilling ‐ Horizontal COO/S: 100% Vital Statistics Identified Inventory (OP/OBO): 60/202 WI: 94.94 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 16 NRI: 72.26 % BPO Gross CAPEX/Well: 6,60

  151. Slide 151: Project: Permian-EMB Lwr Spraberry Hz

    Project: Permian‐EMB Lwr Spraberry Hz (8,400') Target: Lwr Spraberry Division: 6 Type: Drilling ‐ Horizontal COO/S: 100% Vital Statistics Identified Inventory (OP/OBO): 60/202 WI: 94.94 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 16 NRI: 72.26 % BPO Gross CAPEX/Well: 6,223 $M %

  152. Slide 152: Project: Permian-EMB Mid Spraberry Hz

    Project: Permian‐EMB Mid Spraberry Hz (8,400') Target: Mid Spraberry Division: 6 Type: Drilling ‐ Horizontal COO/S: 48% Vital Statistics Identified Inventory (OP/OBO): 60/124 WI: 94.94 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 16 NRI: 72.26 % BPO Gross CAPEX/Well: 6,223 $M %

  153. Slide 153: Project: Permian-EMB Wolfcamp 'A' Hz - NSAI

    Project: Permian‐EMB Wolfcamp 'A' Hz (8400') NSAI Target: Wolfcamp 'A' Division: 6 Type: Drilling ‐ Horizontal COO/S: 100% Vital Statistics Identified Inventory (OP/OBO): 60/202 WI: 94.94 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 16 NRI: 72.26 % BPO Gross CAPEX/Well: 6,604 $M

  154. Slide 154: Project: Permian-EMB Wolfcamp 'A' Hz

    Project: Permian‐EMB Wolfcamp 'A' Hz (8400') Target: Wolfcamp 'A' Division: 6 Type: Drilling ‐ Horizontal COO/S: 100% Vital Statistics Identified Inventory (OP/OBO): 60/202 WI: 94.94 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 16 NRI: 72.26 % BPO Gross CAPEX/Well: 6,223 $M % AP

  155. Slide 155: Project: Permian-EMB Wolfcamp 'B' Hz - NSAI

    Project: Permian‐EMB Wolfcamp 'B' Hz (8,400')‐ NSAI Target: Wolfcamp 'B' Division: 6 Type: Drilling ‐ Horizontal COO/S: 100% Vital Statistics Identified Inventory (OP/OBO): 60/202 WI: 94.94 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 16 NRI: 72.26 % BPO Gross CAPEX/Well: 6,223

  156. Slide 156: Project: Permian-EMB Wolfcamp 'B' Hz

    Project: Permian‐EMB Wolfcamp 'B' Hz (8,400') Target: Wolfcamp 'B' Division: 6 Type: Drilling ‐ Horizontal COO/S: 100% Vital Statistics Identified Inventory (OP/OBO): 60/202 WI: 94.94 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 18 NRI: 72.26 % BPO Gross CAPEX/Well: 6,223 $M % A

  157. Slide 157: Project: Postle CO2 Pattern - Tier

    Project: Postle CO2 Pattern ‐ Tier 1 Target: Morrow A1/A2 Division: 5 Type: EOR Pattern COO/S: 100% Vital Statistics Identified Inventory (OP/OBO): 8 WI: 98.66 % BPO Pot. Unidentified Inventory: 0 98.66 % APO Max Projects per Year: 6 NRI: 85.86 % BPO Gross CAPEX/Well: 1,500 $M 85.86 % APO Gross CAPE

  158. Slide 158: Project: Postle CO2 Pattern - Tier

    Project: Postle CO2 Pattern ‐ Tier 2 Target: Morrow A1/A2 Division: 5 Type: EOR Pattern COO/S: 100% Vital Statistics Identified Inventory (OP/OBO): 72 WI: 98.66 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 6 NRI: 85.86 % BPO Gross CAPEX/Well: 1,500 $M % APO Gross CAPEX/Facility/

  159. Slide 159: Project: Santa Fe Springs RCP

    Project: Santa Fe Springs RCP ‐ BP3.0 No Risk Target: Bell/Meyer/Nordstrom/Buckbee/Clark/HW Division: 2 Type: Recompletion Vital Statistics Identified Inventory: 65 WI: 100.00 % BPO Pot. Unidentified Inventory: 10 % APO Max Projects per Year: 10 NRI: 93.25 % BPO Gross CAPEX/Well: 150 $M % APO Gross

  160. Slide 160: Project: SW Wyoming Vert

    Project: SW Wyoming Vert Target: Frontier/Dakota Division: 1 Type: Drilling ‐ Vertical (Avg. of 3 well groups) COO/S: 100% Vital Statistics Identified Inventory (OP/OBO): 60 WI: 45.00 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 5 NRI: 35.14 % BPO Gross CAPEX/Well: 2,420 $M % AP

  161. Slide 161: Project: East Texas Hz Cotton Valley Taylor

    Project: East Texas Hz Target: Cotton Valley ­ Taylor Division: 4 Type: Drilling ­ Horizontal *Actual WI will Vary COO/S: 80% Vital Statistics Identified Inventory (OP/OBO): 86 WI*: 100.00 % BPO Pot. Unidentified Inventory: 32 % APO Max Projects per Year: 16 NRI*: 78.00 % BPO Gross CAPEX/Well: 5,440

  162. Slide 162: Project: East Texas Haynesville Hz

    Project: East Texas Haynesville Hz Target: Haynesville Division: 4 Type: Drilling ­ Horizontal COO/S: 72% Vital Statistics Identified Inventory (OP/OBO): 40 WI: 100.00 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 14 NRI: 74.00 % BPO Gross CAPEX/Well: 6,500 $M % APO Gross CAPEX/F

  163. Slide 163: Project: East Texas Haynesville Vt

    Project: East Texas Haynesville ­ Vt Target: Haynesville Division: 4 Type: Drilling ­ Vertical COO/S: 70% Vital Statistics Identified Inventory (OP/OBO): 57 WI: 100.00 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 12 NRI: 74.37 % BPO Gross CAPEX/Well: 2,369 $M % APO Gross CAPEX/F

Breitburn Energy Partners — Presentation (May 2017) on 6ix